| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹53.1 LAdmitted-Finance | -21.89% | ₹53.1 L | L1 | Admitted-Finance |
| 2 | L2₹54.3 LAdmitted-Finance | -20.21% | ₹54.3 L | L2 | Admitted-Finance |
| 3 | L3₹60.1 LAdmitted-Finance | -11.66% | ₹60.1 L | L3 | Admitted-Finance |
Updated dates
Tender Value
₹88.3 L
EMD Value
₹1.8 L
Closing Date
9 Feb 2026, 3:30 pmClosed
CE (EHT-Construction)
Block No. 4, Shakti Bhawan, Rampur, Jabalpur
Revamping of 220 KV Yard includes yard metaling, repair of Cable Trenches and earth pit, Repairing and Revamping around 40 MVA BBL X-mer and Revamping of 132 KV Yard includes yard metaling, cable trench repair etc. at 220 KV S/s Sarni
2026_MPPTC_473822_1
1589
Open Tender
Civil Works - Others
270 days
Sarni
As per tender
14 documents required · 14 mandatory
₹2,360
₹1.8 L
Yes
26 Feb 2026
8 Jan 2026
10 Feb 2026
8 Jan 2026
9 Feb 2026
8 Jan 2026
220 KV S/s Sarni
SOR 2.5,30011471,Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m lead and lift up to 1.5 m, disposed soil to be levelled and neatly dressed, All kinds of soil
8 NSOR,3000106,Supply,stacking and spreading of 40mm crusher broken metal black trap, basalt or granite uniformly in substation yard in desired thickness, free from dust and foreign matter,including transportation up to site, lead and lift, T&P, labour,royalty and taxes etc. complete as directed by Engineer-in-charge.Yard LESS ( - ) 5% (- ) RECD. FROM old metalling
14 NSOR,3000112,Excavation , Reclaiming & Screening of previously spreaded 40 mm metal as per requirement in yard . ... 40 mm metal , stacking the same at suitable place after sieving for measurment purpose and will be respread in the yard in desired thickness . The rate includes all labour and T&P, lead & lift etc. complete as per direction of Engineer in charge.
SOR 5.1.1,3011633,Providing and laying in position specified grade of reinforced cement concrete (M-20 Grade Concrete)Slab for cable trench ,Wall for cable trench
SOR 5.9.1,3011642,Foundations, footings, bases of columns, etc. for concrete upto plinth level. Earth Pit
SOR 5.9.2.1,3011643,Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) in cluding attached pilasters butter esses, plinth beams and string courses etc. Uptoplinthlevel.
SOR 10.22.1,3012546,Steel work welded in built up sections/ framed work including cutting, hoisting, ... In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete.
SOR 10.22.2,3012547,Steel work welded in built up sections/ framed work …. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
SOR 4.4.1,3011592,Providing and laying cement concrete in kerbs,steps and the like at or near ground level excluding the cost of centering, shuttering and finishing...M-15 (With 20mm nominal size graded stone aggregate)
SOR 4.1.2.3,3011580,Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level ...M-7.5 Nominal Mix -1 Cement : 4 sand : 8 graded stone aggregate KW BW
SOR 2.6,3011472,Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil
SOR 2.27.1,3011536,Supplying and filling in plinth under floors including watering ramming consolidating in layers…..With hard muram having CBR >12 % at under floors including watering, ramming and compacting (minimum compaction 95% of MDD) in layers not exceeding 20cm in thickness and dressing complete.
SOR 4.3.1,3011589,Centering and shuttering including strutting, propping etc. and removal of form work for :…Upto plinth: Foundations, footings, bases for columns, plinth beams, curtain walls, columns below plinth.
SOR 11.72.1,3012748,Providing and laying factory made chamfered edgeCement Concrete paver blocks in footpath, parks,lawns, drive ways or light traffic parking etc. of required colour strength, thickness…..80 mm thick C.C. paver block of M-35 grade
SOR 13.64,3013112,Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work.
SOR 18.7.2,3013852,Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,20 mm nominal outer dia .Pipes.
SOR 18.7.3,3013853,25 mm nominal outer dia .Pipes.
SOR 18.7.4,3013854,32 mm nominal outer dia .Pipes.
SOR 18.44.2,3014155,Providing and fixing PTMT bib cock of approved quality and colour 15mm nominal bore. 122 mm long weighing not less than 99 gm
SOR 18.51.3,3014172,Providing and fixing PTMT Ball cock of approved quality, colour and make complete with Epoxy coated aluminium rod with L.P./ H.P.H.D. plastic ball….25 mm nominal bore, 152mm long. Weighing not less than 440 gms.
SOR 18.51.4,3014173,40mm nominal bore, 206mm long. Weighing not less than 690 gms.
SOR 6.5.2,3011777,Brick work with well brunt open bhatta , bricks, crushing strength not less than 25kg /cm2 and water absorption not more than 20% in foundation and plinth i/c curing etc .cement Mortar 1:6 (1 cement: 6 sand). FOR STEPS & MISC.
SOR 13.3.2,3013020,20 mm cement plaster of mix :...1:6 (1 cement : 6 sand) FOR STEPS & MISC.
SOR 13.52,3013091,Finishing walls by any mechanical or manual means with Acrylic Smooth exterior paint (Economy Exterior) of required shade including all scaffolding. New work (Two or more coat applied 1.67ltr/10sqm over and including one coat undiluted exterior waterproofing coating @ 2.39 litre/10 sqm with crack bridging ability of upto 0.5mm on horizontal surfaces with an elongation of 150% and water proofing of upto 3 bars on vertical surface
285 NSOR,3011274,Providing and laying mixture of stone crusher dust (free form organic matters and foreign matters etc.) and Cement in a ratio of 1:10 (1 Part Cement : 10 part stone crusher dust by volume)....finishing as per requirment, cleaning , etc. complete and also inclusive of all leads and lifts and cost all materials, etc. complete and also inclusive of all leads and lifts and cost of all materials, transportaion, royalty charges (if any) taxes, levies, labour charges, T&P and cost of other consumables etc. all complete and as per direction of Engineer-In-Charge.
15.3,3013323,Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in.Charge
15.6.3,3013328,"Demolishing brick work manually/ by mechanical means including stacking ofserviceable material and disposal of unserviceable material within 50 metres leadas per direction of Engineer-in- Charge...In cement mortar."
1.1.1,3011314,"Transportation By Mechanical Transport including loading, unloading and stacking..Lime, moorum, building rubbish (for 1KM) "
1.1.2,3011315,"Transportation By Mechanical Transport including loading, unloading and stacking..Lime, moorum, building rubbish (for 2KM) "
8 NSOR,3000106,Supply,stacking and spreading of 40mm crusher broken metal black trap, basalt or granite uniformly in substation yard in desired thickness, free from dust and foreign matter,including transportation up to site, lead and lift, T&P, labour,royalty and taxes etc. complete as directed by Engineer-in-charge.
285 NSOR,3011274,Providing and laying mixture of stone crusher dust (free form organic matters and foreign matters etc.) and Cement in a ratio of 1:10 (1 Part Cement : 10 part stone crusher dust by volume) .....finishing as per requirment, cleaning, etc. complete and also inclusive of all leads and lifts and cost all materials, etc. complete and also inclusive of all leads and lifts and cost of all materials, transportaion, royalty charges (if any) taxes, levies, labour charges, T&P and cost of other consumables etc. all complete and as per direction of Engineer-In-Charge.
SOR 5.1.1,3011633,Providing and laying in position specified grade of reinforced cement concrete (M-20 Grade Concrete) Earth Pit,Wall, slab
SOR 5.9.2.1,3011643,Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) in cluding attached pilasters butter esses, plinth beams and string courses etc. Uptoplinthlevel.
SOR 5.9.1,3011642,Foundations, footings, bases of columns, etc. for concrete upto plinth level
SOR 5.16.6,3011694,Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire all wastages and overlaps, couplers (overlaps shall be provided…. Thermo-Mechanically Treated bars. FE 500 D or more conforming to IS 1786M-20 -7.60 m3 @ 1.5 % of RCC
SOR 10.22.1,3012546,Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete.
SOR 10.22.2,3012547,Steel work welded in built up sections/ framed work …. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.
SOR 4.4.1,3011592,Providing and laying cement concrete in kerbs,steps and the like at or near ground level excluding the cost of centering, shuttering and finishing...M-15 (With 20mm nominal size graded stone aggregate) (Kerb Wall)
SOR 4.1.2.3,3011580,Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level ...M-7.5 Nominal Mix -1 Cement : 4 sand : 8 graded stone aggregate (Kerb Wall)
SOR 4.3.1,3011589,Centering and shuttering including rutting, propping etc. and removal of form work for :…Upto plinth: Foundations, footings, bases for columns, plinth beams, curtain walls, columns below plinth.(Kerb Wall)
SOR 11.72.1,3012748,Providing and laying factory made chamfered edgeCement Concrete paver blocks in footpath, parks,lawns, drive ways or light traffic parking etc. of required colour strength, thickness…..80 mm thick C.C. paver block of M-35 grade
SOR 2.6,3011472,Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including dressing of sides and ramming of bottom disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. (No extra lift is payable if work is done by mechanical means) All kinds of soil
SOR 2.27.1,3011536,Supplying and filling in plinth under floors including watering ramming consolidating in layers…..With hard muram having CBR >12 % at under floors including watering, ramming and compacting (minimum compaction 95% of MDD) in layers not exceeding 20cm in thickness and dressing complete.
SOR 2.5,30011471,Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including disposal of excavated earth up to 50 m lead and lift up to 1.5 m, disposed soil to be levelled and neatly dressed, All kinds of soil
8 NSOR,3000106,Supply,stacking and spreading of 40mm crusher broken metal black trap, basalt or granite uniformly in substation yard in desired thickness, free from dust and foreign matter, including transportation up to site, lead and lift, T&P, labour, royalty and taxes etc. complete as directed by Engineer-in-charge.Yard.LESS ( - ) 5% (- ) RECD. FROM old metalling
14 NSOR,3000112,Excavation , Reclaiming & Screening of previously spreaded 40 mm metal as per requirement in yard . ... 40 mm metal , stacking the same at suitable place after sieving for measurment purpose and will be respread in the yard in desired thickness . The rate includes all labour and T&P, lead & lift etc. complete as per direction of Engineer in charge.
SOR 5.9.1,3011642,Foundations, footings, bases of columns, etc. for concrete upto plinth level Cable .Trench Earth Pit
SOR 5.9.2.1,3011643,Centering and shuttering including strutting, propping etc. and removal of form for: Walls (any thickness) in cluding attached pilasters butter esses, plinth beams and string courses etc. Uptoplinthlevel.
SOR 10.22.1,3012546,Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In stringers, treads, landings etc. of stair cases including use of chequered plate wherever required, all complete.
SOR 5.16.6,3011964,Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding including cost of binding wire all wastages and overlaps, couplers (overlaps shall be provided as per requirement of IS 13920 for ductile detalingIS 456 RCC Design & SP 34 Reinforcement detailing ) etc. complete . (Note:- 1. Spacer bars (chairs) shall be paid separately as
SOR 10.22.2,3012547,Steel work welded in built up sections/ framed work…. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.35X35X5.20X5
SOR 4.4.1,3011592,Providing and laying cement concrete in kerbs,steps and the like at or near ground level excluding the cost of centering, shuttering and finishing...M-15 (With 20mm nominal size graded stone aggregate)
SOR 4.1.2.3,3011580,Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work upto plinth level ...M-7.5 Nominal Mix -1 Cement : 4 sand : 8 graded stone aggregateKW.Steps
SOR 2.27.1,3011536,Supplying and filling in plinth under floors including watering ramming consolidating in layers…..With hard muram having CBR >12 % at under floors including watering, ramming and compacting (minimum compaction 95% of MDD) in layers not exceeding 20cm in thickness and dressing complete.
SOR 4.3.1,3011589,Centering and shuttering including strutting, propping etc. and removal of form work for :…Upto plinth: Foundations, footings, bases for columns, plinth beams, curtain walls, columns below plinth.
SOR 11.72.1,3012748,Providing and laying factory made chamfered edgeCement Concrete paver blocks in footpath, parks,lawns, drive ways or light traffic parking etc. of required colour strength, thickness…..80 mm thick C.C. paver block of M-35 grade
SOR 13.64,3013112,Painting with synthetic enamel paint of approved brand and manufacture to give an even shade: Two or more coats on new work.
SOR 13.54.3,3013095,Two or more coats applied on walls @1.25 ltr/10 sqm. Over and including one coat of Special primer applied @ 0.75 ltr / 10 sqm
SOR 18.7.3,3013853,Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,25 mm nominal outer dia .Pipes.
SOR 18.7.4,3013854,Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,32 mm nominal outer dia .Pipes.
SOR 18.51.4,3014173,40mm nominal bore, 206mm long. Weighing not less than 690 gms.
SOR 13.52,3013091,Finishing walls by any mechanical or manual means with Acrylic Smooth exterior paint (Economy Exterior) ... @ 2.39 litre/10 sqm with crack bridging ability of upto 0.5mm on horizontal surfaces with an elongation of 150% and water proofing of upto 3 bars on vertical surface
285 NSOR,3011274,Providing and laying mixture of stone crusher dust (free form organic matters and foreign matters etc.) and Cement in a ratio of 1:10 (1 Part Cement : 10 part stone crusher dust by volume)....finishing as per requirment, cleaning , etc. complete and also inclusive of all leads and lifts and cost all materials, etc. complete and also inclusive of all leads and lifts and cost of all materials, transportaion, royalty charges (if any) taxes, levies, labour charges, T&P and cost of other consumables etc. all complete and as per direction of Engineer-In-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.85 MB
Document356.pdf
Tender Documents • 1.46 MB
Questionnaire.pdf
Other Document • 0.02 MB
BOQ_557053.xls
BOQ • 0.38 MB
AffidavitNew.pdf
Additional Documents • 0.18 MB
Download all tender documents and submit your bid