Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.8 LAccepted-AOC NO 354 ABITHA GARDEN ABIRAMI STREET VILLUPURAM 29 | 29 | ₹36.8 L | L1 | Accepted-AOC BID ACCEPTED |
| 2 | L2₹39.3 L+₹2.5 L (6.79%)Rejected-Finance | ₹39.3 L+₹2.5 L (6.79%) | L2 | Rejected-Finance 0.033 PERCENT MORE |
| Sl No | Description | Qty | Unit | SESHADIRI.T L2 | SSV DEVELOPERS L1 |
|---|---|---|---|---|---|
| 1.00Labour charges for Operation and maintenance of Thiruvanthipuram head works and Capper hills Head works including All OHT's for the period of ( 3 months ) in Cuddalore Corporation | |||||
| 2.00Labour charges for Operation and maintenance of Thiruvanthipuram head works and Capper hills Head works including All OHT's in Cuddalore Corporation. The contractor should submit the attendance register, esi,pf certificate and salary paid certificate. The oht operator should clean the boundary area of the OHT Premises. The head works operator should clean the Boundary area of the head works premises.The Filter Bed mainteance assistant should clean the filter bed periodically. | |||||
| 3.00 | Electrician Helper SOR 25-26pg.no.12 (4Nos.) | 368 | Nos. | 757 ₹2,78,576 Lowest | 900 ₹3,31,200 |
| 4.00 | Electrician Helper SOR 25-26pg.no.16 (4Nos) | 368 | Nos. | 757 ₹2,78,576 Lowest | 900 ₹3,31,200 |
| 5.00 | Mazdoor Category - II SOR 25-26pg.no.16 | 2,484 | Nos. | 628 ₹15,59,952 Lowest | 720 ₹17,88,480 |
| 6.00 | All OHT and sump washout Labours Un Skilled Labour Mazdoor Category - II (2/ 3Nos x3monthx1times) | 156 | Nos. | 628 ₹97,968 | 560 ₹87,360 Lowest |
| 7.00Mainteance of Attending and repairing of Different type of pumpsets at All Head works in cuddalore Corporation (3Months period) | |||||
| 8.00Labour charges for the removal of submersible pumpset in borewell/openwell for attending repair.including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days-For repairing of pumpset. | |||||
| 9.00 | Above 10.00 HP to 35.00 HP | 10 | Each | 8,680 ₹86,800 Lowest | 10,000 ₹1,00,000 |
| 10.00Attending and repairing of Rewinding the burnt out coil to the following HP borewell type submersible motor with suitable insulated submersible copper induction wire and count including cost of coil wire and 30 days trail run (The retrived burnt out coil should be taken back by contractor) | |||||
Tender Value
₹41.8 L
EMD Value
₹41,750
Closing Date
12 Aug 2026, 3:00 pmClosed
Commissioner, Cuddalore Corporation
Cuddalore Corporation Office
CUDDALORE CORPORATION - Labour charges for Operation and maintenance of Thiruvanthipuram head works and Capper hills Head works including All OHTs , Attending and repairing of water supply pumping mains and distribution mains at ward No.1 to 45
2026_MAWS_689360_1
ROC.NO.1572/2026/E2
Open Tender
Maintenance Works
Works
90 days
WORK
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹41,750
Yes
24 Aug 2026
30 Jul 2026
13 Aug 2026
30 Jul 2026
12 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour charges for Operation and maintenance of Thiruvanthipuram head works and Capper hills Head works including All OHT's for the period of ( 3 months ) in Cuddalore Corporation | - | - | - | - |
| 2 | Labour charges for Operation and maintenance of Thiruvanthipuram head works and Capper hills Head works including All OHT's in Cuddalore Corporation. The contractor should submit the attendance register, esi,pf certificate and salary paid certificate. The oht operator should clean the boundary area of the OHT Premises. The head works operator should clean the Boundary area of the head works premises.The Filter Bed mainteance assistant should clean the filter bed periodically. | - | - | - | - |
| 3 | Electrician Helper SOR 25-26pg.no.12 (4Nos.) | 368 | Nos. | - | - |
| 4 | Electrician Helper SOR 25-26pg.no.16 (4Nos) | 368 | Nos. | - | - |
| 5 | Mazdoor Category - II SOR 25-26pg.no.16 | 2,484 | Nos. | - | - |
| 6 | All OHT and sump washout Labours Un Skilled Labour Mazdoor Category - II (2/ 3Nos x3monthx1times) | 156 | Nos. | - | - |
| 7 | Mainteance of Attending and repairing of Different type of pumpsets at All Head works in cuddalore Corporation (3Months period) | - | - | - | - |
| 8 | Labour charges for the removal of submersible pumpset in borewell/openwell for attending repair.including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days-For repairing of pumpset. | - | - | - | - |
| 9 | Above 10.00 HP to 35.00 HP | 10 | Each | - | - |
| 10 | Attending and repairing of Rewinding the burnt out coil to the following HP borewell type submersible motor with suitable insulated submersible copper induction wire and count including cost of coil wire and 30 days trail run (The retrived burnt out coil should be taken back by contractor) | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
Tendernotice_2.pdf
PDF • 1.57 MB
BOQ_828940.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .