| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.7 LAccepted-AOC | 1 | Accepted-AOC As per BOQ | |
| 2 | 2₹17.6 L+₹1.9 L (11.8%)Rejected-AOC 2 1 MIN NAGAR KOTTUR ROAD SULEESWARANPATTI POLLACHI 624006 | 624006 | 2 | Rejected-AOC As per BOQ | |
| 3 | 3₹18.4 L+₹2.7 L (17.0%)Rejected-AOC | 3 | Rejected-AOC As per BOQ |
| Sl No | Description | Qty | Unit | mookambika constructions L1 | M/S THANGARAJ & CO L2 | SME & CO L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation for foundation and depositing on Bank with metal lead of 10m and initial of 2m in Hard stiff clay, stiff black cotton,hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including all labour charges etc.complete as per SS 20 B TNDSS No 23, 24 VI(S2),VI, VII.9 & 10 | 104 | M3 | 209.78 ₹21,817.12 | 100 ₹10,400 Lowest | 115.8 ₹12,043.2 |
| 2.00 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. | 104 | M3 | 1,500 ₹1,56,000 Lowest | 2,000 ₹2,08,000 | 2,020.4 ₹2,10,121.6 |
| 3.00 | Providing and Laying Wet Mix Mecadam using 0.396m3 of 45-22.40mm graded metal, 0.528m3 of 22.40-2.36mm graded metal and 0.396m3 of 2.36 and below size graded metal premixed with water to a densemass on a prepared subgrade / base to template in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406. | 156 | M3 | 2,020 ₹3,15,120 Lowest | 2,240 ₹3,49,440 | 2,355.3 ₹3,67,426.8 |
| 4.00 | Providing and laying Priming coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 502 of MORTH Rev-5. | 1,040 | M2 | 85 ₹88,400 Lowest | 90 ₹93,600 | 95 ₹98,800 |
| 5.00 | Providing and laying Tack coat over WBM/WMM surface (Preaped with primer) using 2.50Kg of Bitu Emulsion (RS1)for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 503 of MORTH Rev-5. | 1,040 | M2 | 85 ₹88,400 | 24 ₹24,960 Lowest | 24 ₹24,960 Lowest |
| 6.00 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 | 52 | M3 | 9,000 ₹4,68,000 Lowest | 12,300 ₹6,39,600 | 12,603.7 ₹6,55,392.4 |
| 7.00 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kg shredded plastic wast for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 32 | M3 | 12,020 ₹3,84,640 Lowest | 12,900 ₹4,12,800 | 13,345.1 ₹4,27,043.2 |
| 8.00 | Road marking with Hot Applied ThermoPlastic Compound with Reflectorising Glass Beads on Bituminious Surface Proving and Laying of Hot Applied thermoplastic Compound 2.5 mm thick inculding reflectorising glass beads @ 250gms per sqm area thickness of 2.5mm exclusive of surface applied glass beads As Per IRC: 35 The finished surface to be level uniform and free from streaks and holes Inculding all Charges etc.., complete | 52 | M2 | 954.29 ₹49,623.08 | 350 ₹18,200 Lowest | 836.6 ₹43,503.2 |
Tender Value
₹24 L
EMD Value
₹24,000
Closing Date
10 Sept 2026, 3:00 pmClosed
Executive Officer, Suleeswaranpatti Town Panchayat
Suleeswaranpatti Town Panchayat, 1. Alagappa Nagar, Suleeswaranpatti Pollachi TK
Providing BT Road at Ward No 15 Sri Ram Garden in Suleeswaranpatti Town Panchayat
2026_DTP_699664_1
49_2026_27_BT_NNT
Open Tender
Civil Works
Works
180 days
Suleeswaranpatti
As per Norms
3 documents required · 3 mandatory
₹0
₹24,000
14 Oct 2026
31 Aug 2026
10 Sept 2026
31 Aug 2026
10 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation and depositing on Bank with metal lead of 10m and initial of 2m in Hard stiff clay, stiff black cotton,hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders including all labour charges etc.complete as per SS 20 B TNDSS No 23, 24 VI(S2),VI, VII.9 & 10 | 104 | M3 | - | - |
| 2 | Construction of Granular Sub-base by providing close graded material,mixing in a machanical plant at OMC,carriage of mixed material to work site,spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to acheive the desired density,Complete as per clause 401. | 104 | M3 | - | - |
| 3 | Providing and Laying Wet Mix Mecadam using 0.396m3 of 45-22.40mm graded metal, 0.528m3 of 22.40-2.36mm graded metal and 0.396m3 of 2.36 and below size graded metal premixed with water to a densemass on a prepared subgrade / base to template in uniform 15cm Consolidated thickness and consolidation with Vibratory roller of 8 to 10 tonne capacity in stages to proper grade and camber rolling with protecting edges, etc completing with MORTH specification Clause 406. | 156 | M3 | - | - |
| 4 | Providing and laying Priming coat over WBM/WMM surface using 7Kg of Emulsion Bitumen (SS1) for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 502 of MORTH Rev-5. | 1,040 | M2 | - | - |
| 5 | Providing and laying Tack coat over WBM/WMM surface (Preaped with primer) using 2.50Kg of Bitu Emulsion (RS1)for 10 Sq.m for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinary, fule and all other incidental chrages etc., complte as for clause 503 of MORTH Rev-5. | 1,040 | M2 | - | - |
| 6 | Providing and laying 50mm Consolidated thick Dense Bituminous Mecadam using 0.24 cum of 26.50 – 13.20 mm Graded metal and 0.25 cum of 13.20 – 2.36 mm Grade metal and 0.23 cum of 2.36 mm & below with 53.20 kgs of 60/70 Grade Bulk bitumen for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 505 of MORTH Rev-5 | 52 | M3 | - | - |
| 7 | Providing and laying Bituminous Concrete 30mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27 kgs of 60/70 Grade Bulk bitumen and 5.03 kg shredded plastic wast for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 30 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 32 | M3 | - | - |
| 8 | Road marking with Hot Applied ThermoPlastic Compound with Reflectorising Glass Beads on Bituminious Surface Proving and Laying of Hot Applied thermoplastic Compound 2.5 mm thick inculding reflectorising glass beads @ 250gms per sqm area thickness of 2.5mm exclusive of surface applied glass beads As Per IRC: 35 The finished surface to be level uniform and free from streaks and holes Inculding all Charges etc.., complete | 52 | M2 | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
TB.pdf
Tender Documents • 0.27 MB
PB.pdf
Additional Documents • 0.07 MB
BOQ_841204.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .