| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.2 CrAccepted-AOC | ₹1.2 Cr | 1 | Accepted-AOC Being lowest tender |
| 2 | 2₹1.4 Cr+₹14.4 L (11.7%)Rejected-Finance RZ A2 2 CHANAKYA PLACE PART I OPP C 1A BLOCK JANAK PURI NEW DELHI 110059 | NEW DELHI | WEST DELHI | DELHI | 110059 | ₹1.4 Cr+₹14.4 L (11.7%) | 2 | Rejected-Finance not being lowest |
| 3 | 3₹1.5 Cr+₹23.0 L (18.8%)Rejected-Finance | ₹1.5 Cr+₹23.0 L (18.8%) | 3 | Rejected-Finance not being lowest |
| 4 | 4₹1.5 Cr+₹23.9 L (19.6%)Rejected-Finance 13 29 3RD FLOOR EAST PATEL NAGAR NEW DELHI 110 008 | WEST | DELHI | 110008 | ₹1.5 Cr+₹23.9 L (19.6%) | 4 | Rejected-Finance not being lowest |
| 5 | 5₹1.5 Cr+₹30.7 L (25.1%)Rejected-Finance | ₹1.5 Cr+₹30.7 L (25.1%) | 5 | Rejected-Finance not being lowest |
Tender Value
Refer Docs
EMD Value
₹2.1 L
Closing Date
7 Jan 2021, 6:00 pmClosed
CHIEF ENGINEER DELHI ZONE
HQ CHIEF ENGINEER DELHI ZONE
REPLACEMENT OF AHUs OF LOWER CAPACITY WITH ADEQUATE CAPACITY AND OTHER ALLIED ITEMS FOR OTs OF CTVS AT ARMY R AND R HOSPITAL UNDER GE E/M RAND R HOSPITAL AT DELHI CANTT
2020_MES_397674_1
82959/E8
Open Tender
Civil Works
Item Rate
180 days
DELHI CANTT
MES contractor enlisted in MES under class B cat C(i) having deposited Standing Security of Rs 4.00 lakh with department. Contractors not enlisted in MES should meet the MES enlistment criteria corresponding to appropriate class and category
8 documents required · 8 mandatory
₹1,000
GE EM RR HOSPITAL
₹2.1 L
Yes
HQ CHIEF ENGINEER DELHI ZONE
30 Jan 2021
3 Dec 2020
9 Jan 2021
3 Dec 2020
7 Jan 2021
24 Dec 2020
15 Dec 2020
Amount
Disconnecting all electrical connections including disconnecting of chilled water, hot water and humidification supply pipe line connections, all ducts connected to AHUs for supply air, return air and fresh air and taking out from AHU rooms No. 21 to 25 for OTs complete all as specified and directed by Engr-in-Charge.
Design, Supply, installation and connecting after addition alteration including reinsulation of existing supply air, retun air, fresh air ducts, chilled water, hot water and humidistat pipes, testing (phase-I) and commissioning and testing (phase-II) of sectionalized, draw/ blow through type double skin construction air handling units for all OTs, each complete with two nos. plug fans with motor in the fan section, filter section with synthetic fibre filters, fine filter section with microvee filters, suitable ultra voilet emitters for treatment of air, coil section with multi rows deep chilled water coil and hot water coil with insulated SS drain pan & header drain connection with valve, coil of copper tube and aluminium fins (Max coil face velocity 500 FPM), pre cooling and reheat heat pipes arrangement for recovery of energy from fresh air with exhaust air (having energy effiency of not less than 50%) almunium dampers with locking arrangement for supply air, return air, fresh air, fresh and bleed air, double tire with two seperate passages one for supply of fresh air and other for exhaust of air for the room after recovery of energy with exhaust air section with two independent plug fans all as specified complete with electrical panel comprising of 2 nos. VFD drives for exhaust air plug fans and return air plug fans starters for supply air plug fans, controls for modulating valves, humidistat for actuating the humidifire and interlocks for fire damper, fire alarm systems, cabling from sub mains to AHU panel and panel to AHU motors/ controls as required and specified. aluminium dampers with marking and locking arrangement must be provided for supply and exhaust air. Fire dampers shall one be provided. suitable vibrtion isolators, access doors, view glass, limit switch, suitable openings in AHU for tapping for gauges (Pressure and Temperature transducers), controllers and control wiring, all internal wiring, marine lights in all sections, profile gaskets of approved materials shall be provided. Door limit switch must be provided to trip the fan automatically when door is opened. Noise level should not exceed 70 db at a distance of 1 m from AHU complete all as specified and directed by Engr-in-Charge of following capacities:-
(i) 14500 cfm, 63 TR (chilled water coil), 125 mm static, 8 row deep coil for chilled water and two row deep hot water coil (with mixing box, fresh and return with dampers in weather proof construction). (AHU No. 21 & 22 : for OT 1,2,3& 4)
(ii) 14000 cfm, 49 TR (chilled water coil), 8 row deep coil for chilled water and two row deep hot water coil (with mixing box, fresh and return with dampers in weather proof construction) (AHU No. 23 : for OT 5 & 6)
(iii) 11700 cfm, 47 TR (chilled water coil), 8 row deep coil for chilled water and two row deep hot water coil (with mixing box, fresh and return with dampers in weather proof construction) (AHU No. 24 : for OT Hybrid)
(iv) 7900 cfm, 26 TR (chilled water coil), 8 row deep coil for chilled water and two row deep hot water coil (with mixing box, fresh and return with dampers in weather proof construction) (AHU No. 25 : for OT 09) Note for Srl item No 2.01 to 2.04:- (i) "Existing AHUs will be removed against item No 01 and new AHU will be replaced as specified above under item No 2.01 to 2.04 and unit rates are deemed to be inclusive of following : (a) Any modification for connection to existing ducts for supply air, return air and fresh air all under pipe lines with insulation any type of valves with insulation, any type of gauges, electrical and control wiring, including electric panel for AHU, sensors etc on the as in PS and standard engineering practices. (b) All civil works required for AHU room and support of ducts and pipes. (c) Tentative head load calculations and AHU specifications as attached as per Appx H and J as a guide only. Contractor has to work out capacities of AHU based own design and quote rates accordingly to achieve inside design conditions as specified.
Taking down unserviceable motorized valve of size 50 to 80mm complete all as specified and directed by Engr-in-Charge. (Location: AHU-1, AHU-6, AHU-10 A, AHU-11, AHU-12, AHU-13, AHU-17, AHU-18, AHU-19, AHU-20, AHU-21 AHU-22, AHU-26, AHU-27 & AHU-28
S & F of motorized valve of size 80mm dia bore complete all as specified and directed by Engr-in-Charge
All as per item No 04 (here-in-before) but 50 mm dia bore Location for srl item No 04 & 05. :- AHU-1, AHU-6, AHU-10 A, AHU-11, AHU-12, AHU-13, AHU-17, AHU-18, AHU-19, AHU-20, AHU-21 AHU-22, AHU-26, AHU-27 & AHU-28 )
Supply installation and testing of bourden tube type water pressure gauge complete with SS syphon, SS control valve as required complete all as specified and directed.
M & Lfor repair to Air leakage from AHU door outlet complete all as specified and directed by Engr-in-Charge (Location: AHU-1 & AHU-8, AHU-11)
S &F in replacement of Humidifier heater cpapcity 1 KW complete all as specified and directed by Engr-in-Charge (Location: AHU-1, AHU-2, AHU-6, AHU-7, AHU-8, AHU-9, AHU-10, AHU-10 A, AHU-13, AHU-15, AHU-16, AHU-26, AHU-27, AHU-28, AHU-29, AHU-30, AHU-31, AHU-33 & AHU-34)
S & F in replacement of Humidifier heater cpapcity 500 Watt complete all as specified and directed by Engr-in-Charge (Location: AHU-2, AHU-6, AHU-7, AHU-8, AHU-9, AHU-10, AHU-10 A, AHU-16, AHU-17, AHU-26, AHU-27, AHU-28, AHU-33 & AHU-34)
S & F in replacement of level switch (RC-61L) for Humidifier of capacity 5 LPH (4.75 KW) complete all as specified and directed by Engr-in-Charge
All as per item No 10 (here-in-before) but for Humidifier of capacity 3KW Location for srl item No 10 & 11:- (: AHU-1, AHU-5, AHU-6, AHU-7, AHU-8, AHU-9, AHU-10, AHU-10 A, AHU-12, AHU-13, AHU-14, AHU-15, AHU-16, AHU-17, AHU-26, AHU-27, AHU-28, AHU-29, AHU-30, AHU-31& AHU-33)
S & F in replacement of Sight Glass ('O' Ring) for Humidifier of capacity 5 LPH (4.75 KW) complete all as specified and directed by Engr-in-Charge
All as per item No 12 (here-in-before) but for Humidifier of capacity 3KW Location for srl item No 12 & 13 :-(: AHU-1, AHU-2, AHU-8, AHU-10, AHU-10 A, AHU-14, AHU-26, AHU-27) Make Rapid cool
M & L in replacement Damper motor for fire damper complete all as specified and directed by Engr-in-Charge (Location: )
M & L in replacement PVC float valve with ball Humidifier of capacity 5 LPH (4.75 complete all as specified and directed by Engr-in-Charge
All as per item No 15 (here-in-before) but for Humidifier of capacity 3KW Location for srl item No 15 & 16 :-(AHU-2, AHU-5, AHU-6, AHU-7, AHU-8, AHU-9, AHU-10, AHU-10 A, AHU-12, AHU-14, AHU-16, AHU-17, AHU-26, AHU-27 & AHU-33)
S & F in replacement of indicator lamp for AHU complete all as specified and directed by Engr-in-Charge Location :- AHU-4, AHU-10, AHU-15, AHU-19,, AHU-27, AHU-35)
Taking down of temperature gauge complete all as specified and directed by Engr-in-Charge. (Location: AHU-6, AHU-9, AHU-11, AHU-12, AHU-20, AHU-23, AHU-24, AHU-25, AHU-33 & AHU-35)
Supply, installation, testing and commissioning of 0 to 100°C Dial thermometers, (-)5 to 50°C, accuracy 1% of FSD, 100 mm dial, 2 meter capillary & brass thermowell (15x75mm), with calibration certificate complete all as specified and directed. (Location: AHU-6, AHU-9, AHU-11, AHU-12, AHU-20, AHU-23, AHU-24, AHU-25, AHU-33 & AHU-35)
M & L in replacement of voltmeter complete all as specified and directed by Engr-in-Charge. (Location: AHU-7 & AHU-27)
M & L in replacement of AMP meter complete all as specified and directed by Engr-in-Charge (Location: AHU-7 & AHU-27)
M & L in replacement of 3 KW Humidifier fan 100 mm complete all as specified and directed by Engr-in-Charge (Location: AHU-11)
M & L in replacement of Door handle for AHU complete all as specified and directed by Engr-in-Charge (Location: AHU-12 & AHU-13)
S & F in replacement of top cover gasket for AHU complete all as specified and directed by Engr-in-Charge (Location: AHU-12, & AHU-31)
S & F in replacement of rubber of float valve for pan type Humidifier 3KW complete all as specified and directed by Engr-in-Charge (Location: AHU-13)
Supply, installation, testing and commissioning of Proportionate type heating thermostat for regulating the 3-way valve, Operating voltage 24V, output signal 0 to 10V DC/4-20 mA complete all as specified and directed. (Location: AHU-14)
M & L in repair suction side gate hinge broken complete all as specified and directed by Engr-in-Charge. (Location : AHU-17)
M & L in repair of electronic panel of damper motor complete all as specified and directed by Engr-in-Charge (Location: AHU-19)
M & L in replacement of relay card of 3KW Humidifier complete all as specified and directed by Engr-in-Charge (Location: AHU-19)
M & L in repair of star delta timer for 5KW Humidifier complete all as specified and directed by Engr-in-Charge (Location: AHU-20)
M & L in replacement of inlet water pipe GI medium grade 25mm dia complete with fitting such as tee, elbows and flange for humidifier capacity 5KW complete all as specified and directed by Engr-in-Charge (Location: AHU-20, AHU-21, AHU-22, AHU-23, AHU-24, AHU-25)
M & L in replacement of water filter (candle) for Humidifier capacity 05KW type complete all as specified and directed by Engr-in-Charge (Location: AHU-20, AHU-21, AHU-22, AHU-23, AHU-24, AHU-25) )
M & L in replacement of AHU remote control panel wiring from chilled plant to respective AHU complete all as specified and directed by Engr-in-Charge (Location: AHU-21, AHU-22, AHU-23, AHU-24 & AHU- 25)
M & L in replacement of Disc with card of Humidifier Capacity of 5 LPH (4.75KW) complete all as specified and directed by Engr-in-Charge
M & L in replacement of MCB TPN 63 Amp, 230 Volt, 10 KA complete all as specified and directed by Engr-in-Charge (Location: AHU-7,AHU-23)
S & F in replacement of V-belt No. B42 for humidifier complete all as specified and directed by Engr-in-Charge (Location: AHU-30)
M & L in repair cooling tower motor cap 20 HP including stripping of old wiring, cleaning of slots , insulation paper of class-F, rewinding with super enameled copper wire, termination of lead in the junction box with proper capacity of copper lugs, pre heating of complete rewound stator winding, two coat of class F insulation and varnishing on the winding, greasing of bearings, nut bolt & washers & cheacking of continuity of winding complete all as specified and directed by Engr-in-Charge (Location: Cooling tower No 1)
M & L in repair of water leakage in chiller pump No.3 complete all as specified and directed by Engr-in-Charge
M & L in repair of leakage in oil seprator line near ball valve of chiller complete all as specified and directed by Engr-in-Charge (Location: Chiller unit No. 3 & 4)
M & L in repair AHU bloor motor 7.5 HP including stripping of old wiring, cleaning of slots , insulation paper of class-F, rewinding with super enameled copper wire, termination of lead in the junction box with proper capacity of copper lugs, pre heating of complete rewound stator winding, two coat of class F varnish on the winding, greasing of bearings, nut bolt & washers & cheacking of continuity of winding complete all as specified and directed by Engr-in-Charge (Location: AHU-02 )
Supply, installation, testing and commissioning of cast iron Pot Strainers bloted cover, flanged ends, basket of brass/bronze/SS Wire mesh 24G x 14 mesh for condener water application complete with flanges, nuts-bolts, gasket as specified and required 450 mm dia (Location: AHU-14)
Supply, installation, testing and commissiong of chillers plant manager suitable to control all the chillers already installed and all suitable modules (I/O) so that individual Micro Processor controlled panels of machies can be synchronised for chillers. Pumps and cooling tower operation and to enable sequental operation equal operating time and take care of load patterns complete all as specified and directed by Engr-in-Charge. Note:- Cost will include installation of new software from OEM along with suitable hardware required for running plant manager system and necessary connections.
Note for Srl Item No 03 to 42 :- Necessary Make of the item as replaced under Srl item 03 to 42 shall be of same make as originally provided by the previous contractor or if same is not avilable the same shall be as approved by the GE.
RUCHIKA ENGG.WORKS
shivrefrigeration
Leo Air and Power Solution pvt Ltd.
Jyoti Refrigeration
Parksons Engineering Company Pvt Ltd
Bidder Name
RUCHIKA ENGG.WORKS
Jyoti Refrigeration
shivrefrigeration
Parksons Engineering Company Pvt Ltd
Leo Air and Power Solution pvt Ltd.
M/S N.K BUILDERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .