Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹1.3 Cr
EMD Value
₹1.2 L
Closing Date
26 Nov 2026, 2:30 pmDue today
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
CE/TP-I/CNI
O/o the Chief Engineer/Transmission Projects I / Chennai, 3rd Floor , 110 KV GIS Substation building A-10, Guindy Industrial Estate, Guindy, Chennai -32.
Providing RCC Road, fencing and allied civil works for the establishment of 110/33 kV SS at Soorapoondi Madura Ramachandrapuram village with 2x25MVA, 110/33 kV Power transformer
2026_EB_725247_1
TP1-34/2026-27 OF CE/TP-I/CNI
Open Tender
Civil Works
Works
120 days
SOORAPOONDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
Yes
12 Nov 2026
12 Nov 2026
27 Nov 2026
12 Nov 2026
26 Nov 2026
12 Nov 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork excavation for foundation with an initial lead of 10 m and lift of 2 m etc complete for in hard gravelly soil. | 193 | m3 | - | - |
| 2 | Supply and filling of M-Sand for foundation including cost of sand, filling charges labour for watering and consolidation lead,lift etc., complete | 10 | m3 | - | - |
| 3 | PCC 1:3:6 concrete using 12 to 20mm HBG metal for foundation including cost of cement without formwork including cost of all materials, labour, lead, lift etc. complete. | 299 | m3 | - | - |
| 4 | Providing and laying spreading and compacting graded stone aggregates to wet mix macadam 200mm thick specification including premixing the materials with water at OMC in mechancical mix plant carriage of mixed materials by tipper to site laying in uniform layers with pavers in sub base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of materials, labour charges rentals for machinery fuel and all other incidental charges etc., complete as per clause 406 of Morth Rev.5 | 425 | cum | - | - |
| 5 | PCC 1:2:4 using 12 to 20 mm HBG machine crushed metal for foundation without formwork including cost of cement all materials, labour, lead, lift, curing etc., complete | 149 | m3 | - | - |
| 6 | RCC 1:1.5:3 using 12mm to 20 mm HBG metal with formwork for road including cost of cement, all other materials, labour, curing cost of centering charges lead, lift etc. complete but excluding cost of steel reinforcement | 213 | m3 | - | - |
| 7 | RCC 1:1.5:3 using 12mm to 20 mm HBG metal with formwork for wing wall and retaining wall including cost of cement, all other materials, labour, curing cost of centering charges lead, lift etc. complete but excluding cost of steel reinforcement | 76 | m3 | - | - |
| 8 | RCC 1:1.5:3 using 12mm to 20 mm HBG metal with formwork for gate pillars including cost of cement, all other materials, labour, curing cost of centering charges lead, lift etc. complete but excluding cost of steel reinforcement | 4.5 | m3 | - | - |
| 9 | Brick work in cm 1:5 using II class chamber burnt bricks of size 230x110x70mm for wing wall including cost of all materials, all labour, lead, lift, curing etc. complete. | 7 | m3 | - | - |
| 10 | Plastering with cm 1:5, 12 mm thick for wing wall and gate pillar including cost of cement all other materials,labour, lead, lift curing etc. complete. | 35 | m2 | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_870627.xls
BOQ • 0.39 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .