Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹73.4 LAdmitted-Finance | ₹73.4 L | L1 | Admitted-Finance |
| 2 | L2₹78.7 L+₹5.3 L (7.19%)Admitted-Finance SHOP NO 106 1ST FLOOR ASHOKA SHOPPING CENTRE LT ROAD MUMBAI 400001 | MUMBAI | MUMBAI | MAHARASHTRA | 400001 | ₹78.7 L+₹5.3 L (7.19%) | L2 | Admitted-Finance |
| 3 | L3₹79.9 L+₹6.5 L (8.82%)Admitted-Finance | ₹79.9 L+₹6.5 L (8.82%) | L3 | Admitted-Finance |
| 4 | L4₹81.2 L+₹7.8 L (10.6%)Admitted-Finance | ₹81.2 L+₹7.8 L (10.6%) | L4 | Admitted-Finance |
| 5 | L5₹82.1 L+₹8.7 L (11.8%)Admitted-Finance | ₹82.1 L+₹8.7 L (11.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | jay enterprises L1 | BRITE INDUSTRIES L5 | pk Enterprises L2 | DARSHAN CONSTRUCTION Co. L3 | Nexus Infratech L4 | SREE HARITHA ASSOCIATES L6 | INDIA ENGINEERS AND CONTRACTORS L7 | Ishan Constructions L8 | REALTECH PROJECTS L9 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | PART I : BLDG WORK
Material and Labour for taking out/pumping out contaminated water from water pool of size 25mx10mx3 m and diverting into open drain/area as directed by Engineer-in-Charge complete all as specified and directed by Engr-in-charge.
Notes :
(i) Dewatering shall be done by suction pump/any mechanical means and disposed by truck mounted trailors to dispose off contaminated water and cost of the same shall deemed to be included in quoted rates.
(ii) HIGH PRESSURE CLEANING AND SCRUBBING : Cleaning of walls, ceiling and floor by high pressure water jet mixed with detergent / cleaning agent appropriate for tank cleaning having rotary as well as flat jets for effective cleaning of the nooks, walls and corners and then scrubbing By stain (if required).
(iii) VACUUM CLEANING: Wet and dry vacuum cleaning for moping of all dirt particles and residual sludge present in the sumps by industrial vacuum cleaner.
(iv) Necessary T & P shall be arranged by the contractor by his own arrangement. | 1 | Each | 11,000 ₹11,000 | 40,000 ₹40,000 | 18,500 ₹18,500 | 10,500 ₹10,500 Lowest | 12,500 ₹12,500 | 11,750 ₹11,750 | 14,500 ₹14,500 | 22,500 ₹22,500 | 13,500 ₹13,500 |
| 2.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engr-in-charge | 576 | Sqm | 225 ₹1,29,600 | 95 ₹54,720 | 65 ₹37,440 Lowest | 215 ₹1,23,840 | 250 ₹1,44,000 | 245 ₹1,41,120 | 265 ₹1,52,640 | 174 ₹1,00,224 | 275 ₹1,58,400 |
| 3.00 | Material and Labour for applying chemical compound with dispersing agents Removing (and not damaging the beneath brick or RCC surface) old existing unserviceable concrete, cement plaster, loose / unsound weaken cement of any description and in any position from existing external / internal surfaces of walls, or any surface average depth 5-25mm (Approx height/depth 4.5 m from natural ground level) with concrete removing agent(except for zinc and galvanised metal) and clean the treated surface immediately after removal treatment, and removal up to the approval municipal dumping grounds specified by the local bodies outside the premises including cutting of all edges, making square shoulders of the cavities, roughening the smooth surfaces, scrapping out / removing corrosion all loose / scale/ rust etc from the visible unplastered surface | 420 | Sqm | 95 ₹39,900 | 200 ₹84,000 | 125 ₹52,500 | 85 ₹35,700 Lowest | 92 ₹38,640 | 110 ₹46,200 | 87 ₹36,540 | 200 ₹84,000 | 125 ₹52,500 |
| 4.00 | Material and Labour for cutting 'U' shaped grove carefully by diamond cutter, breaker etc without damaging the structure in RCC members i.e. internal surface, of size approx 37mm (depth) x 25mm (width) along the constructions joints and other surfaces as directed and filling the 'U' grove with Patch N plug of or equivalents in make AQUACREAT and PIDILITE over and including application of crystalline concrete slurry @ 0.04 kg/RM in the grove by brush application and allow to dry for 10 minutes as per manufacturers instructions complete all as specified and directed.
Notes :- (a) Cost of providing scaffolding shall deemed to be included in quoted rates.
(b) Structural treatment to be executed through authorised applicator of manufacturer as approved by GE. | 70 | RM | 700 ₹49,000 | 385 ₹26,950 | 310 ₹21,700 | 685 ₹47,950 | 735 ₹51,450 | 725 ₹50,750 | 745 ₹52,150 | 112 ₹7,840 Lowest | 785 ₹54,950 |
| 5.00 | Material and Labour for preparation of surface and applying 12.5mm thick fully consolidated rapid setting cementitious material with setting time 10 mins max @ 25kg/1.05 sqm by low pressure spray equipment or with trowel for patching and resurfacing of deteriorated concrete to produce superior bond low shrinkage, chemical durability and high strength mixed with water at site as per manufacture instructions/ specifications, initial setting time 3.25 hrs and final setting time 5.00 hrs with compressive strength 53 MPA in 28 days, as per manufacture instructions complete all as specified and directed by Engr-in-charge. Notes :- (a) Cost of providing scaffolding shall deemed to be included in quoted rates. (b) Structural treatment to be executed through authorised applicator of manufacturer as approved by GE. | 20 | Sqm | 1,350 ₹27,000 | 756 ₹15,120 Lowest | 815 ₹16,300 | 1,275 ₹25,500 | 1,550 ₹31,000 | 1,370 ₹27,400 | 1,455 ₹29,100 | 850 ₹17,000 | 1,450 ₹29,000 |
| 6.00 | Providing, mixing & applying two component epoxy resin concrete bonding coat on prepared RCC surfaces prior to application of any type of repair mortar or micro concrete to bonding old and new cementitious substrates as per manufacturer's specification including cleaning of surface to remove all dirt, dust or any other impurities, etc. including necessary scaffolding work, all complete as specified and directed. The product should comply with ASTM C 881 Type II Grade 2 Class B+C. Make :- TM bond EP of Thermax or Equivalent as approved by GE | 420 | Sqm | 75 ₹31,500 | 165 ₹69,300 | 110 ₹46,200 | 70 ₹29,400 Lowest | 90 ₹37,800 | 85 ₹35,700 | 89 ₹37,380 | 163 ₹68,460 | 95 ₹39,900 |
| 7.00 | Material and Labour for Clean existing reinforcement with wire/ rotary wire brush, making the surfaces free from loose material dirt etc. complete and applying two coats of alkaline rust converting primer FEOVERT of Krishna Conchem or Roff rust cleaner of Piddilite or Dr. Fixit Rust removal or ShaliRust of STP Ltd. on the rebars, including cleaning the reinforcement, wirebrushing to remove loose rust spalls, wash the rebars with clean water within 3 min and wipe it dry. | 420 | Sqm | 80 ₹33,600 | 178 ₹74,760 | 165 ₹69,300 | 75 ₹31,500 Lowest | 87 ₹36,540 | 90 ₹37,800 | 93 ₹39,060 | 123 ₹51,660 | 78 ₹32,760 |
| 8.00 | Material and Labour for applying two coats of Epoxy based Zinc primer in a span of four hours over the treated rebars and allow to dry for six hours. The application shall be by brush. Epoxy primer for steel of make / brand - Corroseal-ZR of Krishna Conchem or Dr. Fixit Epoxy zinc primer | 420 | Sqm | 80 ₹33,600 | 135 ₹56,700 | 135 ₹56,700 | 74 ₹31,080 Lowest | 87 ₹36,540 | 95 ₹39,900 | 95 ₹39,900 | 147 ₹61,740 | 75 ₹31,500 |
| 9.00 | Material and Labour for high strength epoxy resin based Injection Grouting, Automatic NRV packers in all surfaces from all access side Distance of injections will be 500 mm c/c in matrix pattern until is submerged in dampness of chemical. Injection grouting shall be using two component grouting polymer having low viscosity, high molecular weight, thermosetting to reach very deep pores, voids, cracks and honeycomb in the concrete, specific gravity of which shall be 0.95, pH of 2-4,viscosity of 20-25 sec by B/4 ford cup and having curing time of 30-90 minutes area by suitable gun/pump at required pressure (100 bar to 150 Bar), including cutting of nipples after curing etc and sealing the nozzles with epoxy putty and preparing the surface to match with the existing surfaces complete all as specified and directed.
Make :- Carlisle Syntec/Thermax Ltd,/Kryton Build Mat Pvt Ltd/SNI Infratech Pvt. Ltd or equivalent as approved by GE | 150 | Each | 145 ₹21,750 | 200 ₹30,000 | 450 ₹67,500 | 135 ₹20,250 | 147 ₹22,050 | 150 ₹22,500 | 168 ₹25,200 | 133 ₹19,950 Lowest | 165 ₹24,750 |
| 10.00 | Material and Labour for welded MS wire mesh weighing not less than 1 kg/sqm on the prepared surface which should be cleaned and should be removed from dirt, fungus and all foreign material complete all as specified and directed | 420 | Sqm | 775 ₹3,25,500 | 756 ₹3,17,520 | 810 ₹3,40,200 | 755 ₹3,17,100 | 787 ₹3,30,540 | 795 ₹3,33,900 | 792 ₹3,32,640 | 721 ₹3,02,820 Lowest | 950 ₹3,99,000 |
Tender Value
₹77.7 L
EMD Value
₹1.4 L
Closing Date
11 Jun 2026, 6:00 pmClosed
CWE Karanja
CWE Karanja Naval Station Karanja Uran, Navi Mumbai - 400 704
SPECIAL REPAIRS TO CHARIOT WORKUP STATION BUILDING NO P 838 AT INS ABHIMANYU AT NAVAL STATION KARANJA
2025_MES_738401_3
84500-K/E8
Open Tender
Civil Works
Item Rate
270 days
Naval Staion Karanja
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
GE NW Karanja
₹1.4 L
23 Jun 2026
14 May 2026
13 Jun 2026
14 May 2026
11 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | PART I : BLDG WORK
Material and Labour for taking out/pumping out contaminated water from water pool of size 25mx10mx3 m and diverting into open drain/area as directed by Engineer-in-Charge complete all as specified and directed by Engr-in-charge.
Notes :
(i) Dewatering shall be done by suction pump/any mechanical means and disposed by truck mounted trailors to dispose off contaminated water and cost of the same shall deemed to be included in quoted rates.
(ii) HIGH PRESSURE CLEANING AND SCRUBBING : Cleaning of walls, ceiling and floor by high pressure water jet mixed with detergent / cleaning agent appropriate for tank cleaning having rotary as well as flat jets for effective cleaning of the nooks, walls and corners and then scrubbing By stain (if required).
(iii) VACUUM CLEANING: Wet and dry vacuum cleaning for moping of all dirt particles and residual sludge present in the sumps by industrial vacuum cleaner.
(iv) Necessary T & P shall be arranged by the contractor by his own arrangement. | 1 | Each | - | - |
| 2 | Dismantling floor, hearth or wall tiling including cement mortar bedding (but not backing), removing serviceable tiles to store and rubbish off the premises complete all as specified and directed by Engr-in-charge | 576 | Sqm | - | - |
| 3 | Material and Labour for applying chemical compound with dispersing agents Removing (and not damaging the beneath brick or RCC surface) old existing unserviceable concrete, cement plaster, loose / unsound weaken cement of any description and in any position from existing external / internal surfaces of walls, or any surface average depth 5-25mm (Approx height/depth 4.5 m from natural ground level) with concrete removing agent(except for zinc and galvanised metal) and clean the treated surface immediately after removal treatment, and removal up to the approval municipal dumping grounds specified by the local bodies outside the premises including cutting of all edges, making square shoulders of the cavities, roughening the smooth surfaces, scrapping out / removing corrosion all loose / scale/ rust etc from the visible unplastered surface | 420 | Sqm | - | - |
| 4 | Material and Labour for cutting 'U' shaped grove carefully by diamond cutter, breaker etc without damaging the structure in RCC members i.e. internal surface, of size approx 37mm (depth) x 25mm (width) along the constructions joints and other surfaces as directed and filling the 'U' grove with Patch N plug of or equivalents in make AQUACREAT and PIDILITE over and including application of crystalline concrete slurry @ 0.04 kg/RM in the grove by brush application and allow to dry for 10 minutes as per manufacturers instructions complete all as specified and directed.
Notes :- (a) Cost of providing scaffolding shall deemed to be included in quoted rates.
(b) Structural treatment to be executed through authorised applicator of manufacturer as approved by GE. | 70 | RM | - | - |
| 5 | Material and Labour for preparation of surface and applying 12.5mm thick fully consolidated rapid setting cementitious material with setting time 10 mins max @ 25kg/1.05 sqm by low pressure spray equipment or with trowel for patching and resurfacing of deteriorated concrete to produce superior bond low shrinkage, chemical durability and high strength mixed with water at site as per manufacture instructions/ specifications, initial setting time 3.25 hrs and final setting time 5.00 hrs with compressive strength 53 MPA in 28 days, as per manufacture instructions complete all as specified and directed by Engr-in-charge. Notes :- (a) Cost of providing scaffolding shall deemed to be included in quoted rates. (b) Structural treatment to be executed through authorised applicator of manufacturer as approved by GE. | 20 | Sqm | - | - |
| 6 | Providing, mixing & applying two component epoxy resin concrete bonding coat on prepared RCC surfaces prior to application of any type of repair mortar or micro concrete to bonding old and new cementitious substrates as per manufacturer's specification including cleaning of surface to remove all dirt, dust or any other impurities, etc. including necessary scaffolding work, all complete as specified and directed. The product should comply with ASTM C 881 Type II Grade 2 Class B+C. Make :- TM bond EP of Thermax or Equivalent as approved by GE | 420 | Sqm | - | - |
| 7 | Material and Labour for Clean existing reinforcement with wire/ rotary wire brush, making the surfaces free from loose material dirt etc. complete and applying two coats of alkaline rust converting primer FEOVERT of Krishna Conchem or Roff rust cleaner of Piddilite or Dr. Fixit Rust removal or ShaliRust of STP Ltd. on the rebars, including cleaning the reinforcement, wirebrushing to remove loose rust spalls, wash the rebars with clean water within 3 min and wipe it dry. | 420 | Sqm | - | - |
| 8 | Material and Labour for applying two coats of Epoxy based Zinc primer in a span of four hours over the treated rebars and allow to dry for six hours. The application shall be by brush. Epoxy primer for steel of make / brand - Corroseal-ZR of Krishna Conchem or Dr. Fixit Epoxy zinc primer | 420 | Sqm | - | - |
| 9 | Material and Labour for high strength epoxy resin based Injection Grouting, Automatic NRV packers in all surfaces from all access side Distance of injections will be 500 mm c/c in matrix pattern until is submerged in dampness of chemical. Injection grouting shall be using two component grouting polymer having low viscosity, high molecular weight, thermosetting to reach very deep pores, voids, cracks and honeycomb in the concrete, specific gravity of which shall be 0.95, pH of 2-4,viscosity of 20-25 sec by B/4 ford cup and having curing time of 30-90 minutes area by suitable gun/pump at required pressure (100 bar to 150 Bar), including cutting of nipples after curing etc and sealing the nozzles with epoxy putty and preparing the surface to match with the existing surfaces complete all as specified and directed.
Make :- Carlisle Syntec/Thermax Ltd,/Kryton Build Mat Pvt Ltd/SNI Infratech Pvt. Ltd or equivalent as approved by GE | 150 | Each | - | - |
| 10 | Material and Labour for welded MS wire mesh weighing not less than 1 kg/sqm on the prepared surface which should be cleaned and should be removed from dirt, fungus and all foreign material complete all as specified and directed | 420 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
Tenderpages.pdf
Tender Documents • 1.86 MB
BOQ_857090.xls
BOQ • 0.39 MB
SOC.pdf
Additional Documents • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .