| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 CrAccepted-AOC | ₹3.4 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹3.5 Cr+₹6.7 L (1.96%)Rejected-AOC NO 622 VANNIYAR NAGAR ALAGAPURAM PERIYAPUDHUR SALEM 636016 | SALEM | SALEM | TAMIL NADU | 636016 | ₹3.5 Cr+₹6.7 L (1.96%) | L2 | Rejected-AOC other than L1 |
| 3 | L3₹3.5 Cr+₹10.0 L (2.94%)Rejected-AOC | ₹3.5 Cr+₹10.0 L (2.94%) | L3 | Rejected-AOC other than L1 |
Tender Value
₹3.3 Cr
EMD Value
₹1.8 L
Closing Date
10 Oct 2023, 3:00 pmClosed
Special Chief Engineer
OFFICE OF THE SUPERINTENDING ENGINEER PWD PLANNING AND DESIGN CIRCLE CHENNAI
CONSERVATION AND RESTORATION OF RESEARCH INSTITUTE HERITAGE BUILDING PHASE-I SOUTH WING IN TAMILNADU AGRICULTURAL UNIVERSITY AT COIMBATORE IN COIMBATORE DISTRICT
2023_PWD_361709_2
NIT No 04 / 4 of 2023
Open Tender
Civil Works - Buildings
Lump-sum
365 days
Coimbatore
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹1.8 L
Yes
5 Jan 2024
3 Oct 2023
11 Oct 2023
3 Oct 2023
10 Oct 2023
3 Oct 2023
Amount
Providing two legged scaffolding using 48.30mm dia heavy duty MS pipe over all height of 3.00m the distance between 2 legs being 1.25m and the spacing of the post being 2m in each rows and providing platform with C.W. planks using 40mm thick silver oak and 1.00m wide in complete form with horizontal bracings @ 1.50m c/c vertical direction and with cross bracings using same 48.30mm dia including cutting, threading assembly with red oxide primer, labour charges cost of specials such on large plate, shoe, carcher, coupling, bolt and nut transportation charges. The bottom of vertical post shall rest on 300x300x70mm 1:2:4 concrete base etc complete complying with standard specification and as directed by the departmental officers.
For Initial height of 3m
For every additional 2.5m height
Dismantling of Cracked Madras terrace roofing after giving proper centering to the ceiling for the safety of labourers and coveying the debris from inside to outside etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling of damaged and undulated flooring and conveying debries from all floors to ground level outside the mahal etc., complete complying with standard specification and as directed by the departmental officers.
Dismantling of brick jelly lime concrete flooring of any thickness and conveying by dolly and stacking the useful stone for reuse etc.,
Dismantling clearing away the damaged Brick Work in Lime Mortar of any thickness and carefully stacking materials useful for reuse etc., complete and as directed.
Dismantling clearing away the damaged One course of pressed tile roof finish in Cement Mortar and carefully stacking materials useful for reuse etc., complete and as directed.
Carefully removing the existing dead plastering from the ceiling/walls and raking out the brick joints etc., complete complying with standard specifications as directed by the departmental officers. The rate includes labour charges for imported specially skilled labours.
Relaying brick jelly lime concrete in pure lime 1:2 for Flooring well rammed etc., complete complying with standard specification.
Reconstruction of brick masonry wall with similar type of Brick work in lime mortar 1:2 (one lime two sand) using wire cut brick of size 9"x4"x3" (Specially manufacturing) for super structure in ground floor mortar mixed in the herbals executed as per traditional preparation and documented type construction such as arches and lintels etc., including erection of scaffolding curing complete complying with standard specification by the departmental officers.
For superstructure in First floor
Making, supplying and fixing of well seasoned best quality teak wood full length new members like beam , joist etc., in position for roofing portion or any other area , TW frames for doors and window including making necessary size holes in masonry to recieve the ends of wooden memnbers , all fixtures and fastenings with one coat of primer etc., as directed by the departmental officers. ( Items to include using a larger section of wood to get the mouldings and chamfers as per orginal design , sample to be shown to the Executive Engineer for approval before use on works.)
Redoing of Madras Terrace roof in all floors with one layer of brick on edge course laid as first layer over the existing Teakwood joists, Beams, I Sections, etc., which are placed at roof level in all floors using specially manufactured Terrace bricks for heritage works of size 150mm x 75mm x 25mm in lime mortar 1:1.5 (one lime and one and half sand). The second layer is laid with specially manufactured Terrace bricks for Heritage works of size 150mm x 75mm x 25mm in flat manner in lime mortar 1:2 ( one lime and t\wo sand) 20mm thick as base layer laid over the top of brick on edge course.
Racking out the brick joints to a depth of 5cm to 7 cm to remove the dead mortar in between the brick joints and cleaning the surface with coir brush and washed with pure water including erection and dismantling of scaffolding at every stage etc complete complying with standard specification and as directed by the departmental officers.
Grouting and stiching the wide cracks at roof (Madras Terrace Roof ) using lime mortar 1:2 with pot pieces for filling up the cracks and the voids, creivices and gap etc.shall be completely sealed with necessary grouting pump. This pressure pump is to be used after cleaning the cracks, washing etc., and then the cracks are grouted with lime mortar 1:2 and it is allowed to be cured till final setting of lime mortar before taking up further leak proof treatment work.
Pointing,grouting and filleting the brick joint of wall and arches with lime mortar 1:2 (one of lime and two of sand) using Pollachi lime in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Strengthening the existing walls by providing grouting by formation of two holes of size 1" with required intervals - depth of 300mm for an area of 1 sq.m and depending upon the site conditions injecting lime slurry consisting of lime mortar 1:2 (one lime and two of sand) using Pollachi lime in all floors added with grouting admixture by 2% weight of lime, by using required equipment and the rate includes the cost of all materials, labour charges etc., complete complying with standard specification and as directed by the departmental officers.
Replastering ( base plastering) the brick wall, pillars and arches of mahal building with lime mortar 1:2 ( one of lime and two of sand) to a thickness of 30 mm as per existing construction including erection & dismantling , curing etc.,complete complying with standard specification and as directed by the departmental officers.
Replastering the ceiling, etc., with Lime mortar 1:1.5 (one Lime and one and half sand), 20mm thick using Pollachi lime in all floors including labour charges, etc., complete complying with standard specifications as directed by the departmental officers.
Applying thin coat of hand grinded Lime mortar paste ( mix should be with 1 kg of jaggery , 1 kg of galnut , 30 nos. egg 0.5 kg of vajram , 3 kg of white cement, 0.5 kg of redoxide and 0.5 kg of yellow oxide for 10 sq.m area ) ( Theeravai) over the newly plastered surface as per the existing clues (including finishing the surface with smoothness) erection of scaffolding curing etc., complete complying with standard specification and as directed by the departmental officers.
Making , supplying and fixing of Teak wood Louvered panelled door shutter two leaves of door opening with bottom closed using 2/3 louvered at top+ 1/3 panelled at bottom of the door shutter using Teak wood styles and rails of thickness of 0.05m alround and centere and the panels should be covered with 50mm thick Teak wood planks and louvered planks of size 150mm x 20 mm thick, all are to be done in the existing clues the shutter should be fixed in position with necessary furniture fitting such as 6-Nos cost of Aluminium butt hinges 6” long, 4-Nos Aluminium tower bolt 3'-00”, Aluminium aldrop 10” with necessary screws and nails and painting the door shutter with one coat of primer etc., complete complying with standard specification and as directed by the departmental officers.
Easing and repairing hanging doors, window shutters and refixing the same after attending the petty repairs including fixing furniture fittings etc.,complete complying with standard specification and as directed by the departmental officers.
Renewing the damaged Teak wood panelled windows, ventilators with new teak wood panelled Window shutter including fixing in position with hinges but excluding cost of furniture fittings etc., complete complying as directed by the departmental officers as per standard specification.(0.60x1.30m).
Making, supplying and fixing of glazed ventilator with new Teak wood glazed ventilator of size 1.20x0.60m by using Teak wood scanting thickness of size 0.04m frames fixed with 4mm thick pin headed glass including labour for wrought put up and fixing the ventilator in position with necessary furniture fittings including finishing the Ventilator with one coat of primer and finishing neatly etc., complete complying with standard specifications and as directed by the departmental officers.
Paving the floor with best quality Heritage pattern Cement tile & Handmade tile of size 200 x 200 mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
White Washing inner wall with three coats of shell lime as directed by the deparmental officers. The rate inclusive of cost of materials and labour charges but excluding high scaffolding charages etc
Supplying and Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat of over wall surface ect., complete complying with standard specification. (The colour and shade of the Emulsion paint shall be got approved by the Executive Engineer before use of work).
Painting girder and MS plate with two coats of anticorrosive paint of apecial quality including cost of brushes, high scafoldingcharges. to give a wooden look like finish complying with standard specifications
Revarnishing the wood work with two coats of best melamine varnish of approved quality and brand including preparation of surface etc. The rate is inclusive cost of all materials, labour charges and finishing neatly etc., complete complying with standard specification and as directed by the departmental officers etc. complete.
Labour charge for removing painting in TW joist , beams , doors , windows etc., as per std specification
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Collecting the scattered debris from the campus and conveying away the same to outside by lorry to a lead of 10KM including loading and unloading charges and dumping in low places and leveling etc., complete.
Removing the existing vegetation growth in the building by the way of uprooting the plants manually and then drilling with power driller up to the root depth of plants to obtain a clean and neat drill so as to continuously inspect and remove left over roots of vegetation growth and to inject pesticides into the holes so as to prevent further growth of vegetation in the future to safeguard the country old heritage building etc. the cost including the cost of pesticides used, hire charges of injecting machine for injecting chemicals, cost of tools and all labour charges etc complete. the above works should be carried out as per the direction of the departmental officers and complying with standard specifications.
Small plant
Medium plant
Supplying material and labour charges for shade net for good protector of the building from heavy wind, birds, insect and alos reduces water evoporation and the size of t shde net shall be length as 50 m and breadth as 6m with green for protection of building etc as directed by the departmental officers
Supplying and fixing of hoisting machine by hire basis (including labour charges) for lifting of all materials from ground to terrace and shifting of damaged unused materials from terrace to gound floor with necessary rope, haisting platform, motor, controller as per site requirement days etc., the rate is inclusive of hire charges for machine, labour charges for operating the machine and daily bata and conveyance charges and dismantling and removing the same after completion of work etc complete with standard specification and as directed by the departmental officers.
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc. detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
Providing additional strutting to centering of RCC slabs of plain surface for every additional 1.0 metre height or part thereof but not less than 30 cm, over the initial 3.00 metre height from floor level using casurina props of 10cm to 13cm dia including cross bracing etc., complete complying with standard specification
Construction of mortar pit of size 0.90x0.45m with necessary earth work excavation of sand filling 15cm thick, PCC 1:5:10, 8cm thick brick partition wall 11.50cm thick to a height of 60cm with plastering 1:5, 12mm thick on both sides etc complying with standard specification and as directed by the departmental officers.
Providing pest control with antitermite treatement drilling holes at junction of walls with floors at 300mm intervals and injucting chemical emulsion on those with cement etc. making holes along the vertical surface out side the walls at 150mm intervals to the depth of 450mm pointing chemical emulsion into the holes and closing holes with chemical etc. spraying all surface of treatment is to be done as per IS code no:5313/ Part III 1981 with approved chemical.(The chemical is to be used on the work should be got approved by the Executive Engineer before use on work) etc complete complying with standard specification and as directed by the departmental officers.
Supplying and fixing in position best approved of BIS quality PVC rain water down fall pipes having a pressure of 4 kg. / sq.cm including cost of necessry PVC shoe, PVC bend, cast iron gratings of required diameter and special clamps, brass screws, nails, etc., and fixing of cast iron gratings at junction of parapet and the RCC roof slab including finishing neatly etc., complete. The rate shall be inclusive of cast of removable cast iron grating. The PVC pipe shall be fixed in wall with special type of "U" clamp at the centre of the pipe line in addition to those for more than 3.0 metre pipe length, etc., complete complying with standard specification.
160 mm dia
Terrace flooring with one course of pressed tiles 23x23x20 mm using Lime mortor 1:2 with crude oil , 10% by wieght of lime mortor and pointed with lime mortor 1:1.5etc, complete
Providing water membarane treatement to the leaky terrace using Synthetic Butadine Rubber sheet (SBR) including hacking the surfaces and roughening the old RCC roof surface with wire brushes and tools wherever necessary and theSynthetic Butadine Rubber sheet (SBR) has been laying before weathering course brick jelly concrete and with using necessary SBR adhesive to carefuly laying with proper joints ( the joints over lap to be not more than over lap 15cm to 20cm) etc, including labour for laying the sheets etc complete including curing and finishing neatly complying with standard specification and as directed by the departmental officers.
Exposed brick work Pointing with Lime flush pointing in stone and brick with 1:1.5 lime mix after making surface to be pointed free from dust and durt the pointing should be commpacted well making sure that the brick surface in elevation is clean from mortar marks etc complete complying with standard specification and as directed by the departmental officers.
SS Associates
DAMODHARAN JAGADEESH
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_446613.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .