Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.5 LAccepted-Finance | 1 | Accepted-Finance As Per Financial | |
| 2 | 2₹4.7 L+₹24,068.80 (5.36%)Rejected-Finance GIJROLI DY LIKELY RELATED TO THE WORK LOCATION MENTIONED SPECIFIC ADDRESS NOT PROVIDED FOR THE CONTRACTOR | DAMAN | THE DADRA AND NAGAR HAVELI AND DAMAN AND DIU | 396210 | 2 | Rejected-Finance As Per Financial | |
| 3 | Rejected-Technical | - | Rejected-Technical AS PER TECHNICAL |
| Sl No | Description | Qty | Unit | MANVENDRA PRATAP SINGH CONTRACTOR AND SUPPLIER L2 | M/S TANVI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | Silt clearance/trench digging including lift up to 1.50m and lead up to 6m Including cost of driver/assistant driver, POL, maintenance of machines.contractor profit taxes etc butexcluding leveling dressing & compaction by hydraulic excavator/JCB/equivalent capacity 25 cum/hour ic. 1000/25.(Rs.1000 per hour) | 6,634 | Cum | 45 ₹2,98,530 | 42 ₹2,78,628 Lowest |
| 2.00 | Scrapping internal section of existing channel I/c bed & slope with silt up to 05 cm | 24,118 | Sqm | 4.45 ₹1,07,325.1 | 4.35 ₹1,04,913.3 Lowest |
| 3.00 | Clearing thick bushes and thorny jungle without uprooting | 12,700 | Sqm | 4.5 ₹57,150 | 4.35 ₹55,245 Lowest |
| 4.00 | VRB or Bridge Cleaning | 15 | No. | 650 ₹9,750 Lowest | 660 ₹9,900 |
Tender Value
₹4.8 L
EMD Value
₹54,400
Closing Date
24 Sept 2026, 12:00 pmClosed
EXECUTIVE ENGINEER
IRRIGATION DIVISION HATHRAS
SILT CLEARANCE and SCRAPING OF GONDA DY FROM KM. 0.00 TO KM. 13.000
2026_UPIDC_1186756_3
04/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
21 days
HATHRAS
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,016
₹54,400
7 Oct 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
24 Sept 2026
17 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Silt clearance/trench digging including lift up to 1.50m and lead up to 6m Including cost of driver/assistant driver, POL, maintenance of machines.contractor profit taxes etc butexcluding leveling dressing & compaction by hydraulic excavator/JCB/equivalent capacity 25 cum/hour ic. 1000/25.(Rs.1000 per hour) | 6,634 | Cum | 1.25 | ₹8,292.5 |
| 2 | Scrapping internal section of existing channel I/c bed & slope with silt up to 05 cm | 24,118 | Sqm | 1.25 | ₹30,147.5 |
| 3 | Clearing thick bushes and thorny jungle without uprooting | 12,700 | Sqm | 1.25 | ₹15,875 |
| 4 | VRB or Bridge Cleaning | 15 | No. | 1.25 | ₹18.75 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.75 MB
NITSILT.pdf
Tender Documents • 3.73 MB
BOQ_2234123.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .