| 1 | L1₹55.4 LAccepted-AOC 9TH FLOOR UNIT 901 904 ECOSTATION PLOT 07 BLOCK BP SECTOR V BIDHANNAGAR SALTLAKE NORTH 24 PARGANAS WEST BENGAL | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹70.2 L+₹14.8 L (26.6%)Rejected-Finance 1 R N MUKHERJEE ROAD KOLKATA WEST BENGAL 700001 | KOLKATA | WEST BENGAL | 700001 | L2 | Rejected-Finance L2 Bidder | |
| 3 | L3₹77.9 L+₹22.5 L (40.5%)Rejected-Finance AHMEDABAD GUJARAT 380025 | 380025 | L3 | Rejected-Finance L3 Bidder |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
29 Jun 2021, 12:00 pmClosed
MANAGER PURCHASE
Plot 5 Block BP Sector V Salt Lake City Kolkata 700091
Repairing replacement and installation of Server System Network Infrastructure Active and Passive Wi-Fi System Router Firewall and IP Telephone system at different SSH
2021_WTL_333021_1
WTL/SSH/RR/21-22/006
Open Tender
Project Work
Item Rate
70 days
As per Tender
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,000
₹1 L
On-Line Meeting
14 Jul 2021
14 Jun 2021
1 Jul 2021
14 Jun 2021
29 Jun 2021
25 Jun 2021
21 Jun 2021
Amount
2 nos Motherboard not working - Asansol SSH - Cisco Server UCS C220 M4
4 nos IP Phone not working - Asansol SSH - Cisco IP phone CP-3905
6nos Cisco AP not working - Asansol SSH - Cisco AP AIR-CAP17021-D-K9
UTM not working properly - Asansol SSH - UTM-5516
VC system not working - Asansol SSH - Cisco
RAID CARD ISSUE, 600 GB SAS HDD Problem, NO POST (Ram issue) - Diamond Harbour SSH - Cisco Server UCSC220 M4
IP Phone CP-3905 - Diamond Harbour SSH - Cisco IP phone CP-3905
RAID card problem/RAM issue/ HDD problem - Seerampur SSH - Cisco Server UCS C220M4
VC System not working properly - Seerampur SSH - Csico VC system TTC7-21
UTM power issue - Seerampur SSH - UTM-5516
8 nos IP Not Working - Arambagh SSH - CP- 3905
2x nos 16 GB Server RAM Problem, 1nos HDD problem , Cisco IP EPABAX CUCM server problem - Arambagh SSH - Cisco Server UCS C220M4
AP Not working - Arambagh SSH - Cisco AP AIR-CT2504-15-K9
Power Issue - Arambagh SSH - UTM-5516
4nos Switch Some port are not working, power issue 2nos switch - Kalna SSH - Cisco WS-C2960X24PS-L
RAM problem 1 nos server & HDD formatting required - Kalna SSH - UCS C220 M4
6nos IP phone not working - Kalna SSH - Cisco IP phone CP-3905
Server Montherboard and Power Supply not working properly - Domkol - Cisco Server UCS C220M4
Switch ports are not working - Domkol - Cisco WS-C2960X24PS-L
Phone are not working - Domkol - Cisco IP Phone CP-3905
AP not working - Domkol - AIR-CAP17021-D-K9
Router power issue - Domkol - Router-2921-K9
AP not working - MR Bangur SSH - AIR-CAP17021-D-K9
3 nos switch not working - MR Bangur SSH - Cisco WS-C2960X24PS-L
4 nos IP phone not working - MR Bangur SSH - CP-3905
CUCM server not working properly - MR Bangur SSH - Cisco server UCS C220M4
6nos switch some port are not working - Raghunathpur SSH - Cisco WS-C2960X24PS-L
2nos HDD not detected & RAM issue 2no - Raghunathpur SSH - Cisco server UCS C220 M4
5nos IP Phone not working - Raghunathpur SSH - Cisco IP Phone CP-3905
Server SMPS problem, Mother board issue & 2 nos 16 GB RAM not detected - Egra - Cisco Server UCS C220 M4
3 nos switch problem - Egra - Cisco WS-C2960X24PS-L
5 nos IP phone power issue - Egra - Cisco IP Phone CP-3905
VC not working - Egra - Cisco VC TTC7-21
6 nos Switch not working - Debra SSH - Switch DGS-1016A
2 nos server SAS HDD problem, 4nos RAM not working - Debra SSH - HP ProLiant DL380 Gen9
AP Not working - Debra SSH - AP ATS 4011
Power Issue & SFP port not working - Raigaunj SSH - Switch DES-1210-28P
Server HDD problem,3nos 16 GB RAM problemServer HDD problem,3nos 16 GB RAM problem - Raigaunj SSH - HP ProLiant DL380 Gen9
AP Not working - Raigaunj SSH - AP ATS 4011
6 nos telephone not working - Raigaunj SSH - Digital Phone handset & Beetel - C-11 phone
1no Motherboard Problem, 1no HDD not detected, OS Issue - Suri SSH - HP ProLiant DL380 Gen9
Switch not working - Suri SSH - DES-1210-28
3nos AP not working - Suri SSH - ATS4011 AP
Not working - Suri SSH - Router- DIR615
RAD Card issue, Motherboard issue - Nayagram SSH - HP ProLiant DL380 Gen9
core router SMPS not working - Nayagram SSH - Router- DIR615
Switch not working, - Nayagram SSH - Switch- DGS3620-28SC
Switch not working, - Nayagram SSH - Switch DGS-1016A
AP controller not working properly - Nayagram SSH - ATS AP 4011
2nos Switch DGS-1210-28 5nos port not working , replacement required - Metiabruz - Switch DGS-1210-28
2nos Switch Cisco SG-500-28 not working Repairing required, 3nos Cisco SG- 300 - Metiabruz - Switch Cisco SG-500-28 & SG 300 switch
Dell server POWER EDGE-T430 SMPS & HDD required - Metiabruz - Dell server POWER EDGE-T430
Active components all are Working but 20 I/O Box need to be replaced along with structure Cabling. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Barjora (5th Floor) - Passive Component
Active components all are Working but 5 jack panel and 15 nos of i/O Box are not working.. They need to be replaced. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Jhargram (5th Floor) - Passive Component
Active components all are Working but Fiber cut is there. Need to OTDR testing and splicing required. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Jangipur (5th Floor) - Passive Component
Active components all are Working. 25 LAN point are not working. Structure cabling required. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Baruipur (6th Floor) - Passive Component
Active components all are Working. 55 nos I/O Box are faulty and 4 racks need to be replace along with 10 patch panel. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Balurghat (10th Floor) - Passive Component
Active components all are Working. 1st Floor to 3rd Floor connectivity required. Both fiber and Copper. 12 nos I/O ports are not working. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Ghatal (5th Floor) - Passive Component
Active components all are Working but 2 rack need to be replace. 30 I/O box need to be repair and 2 No Jack panel need to be replaced. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Chachol (5th Floor) - Passive Component
Active components all are Working but 15 I/O Box need to be replaced along with structure Cabling. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Bolpur (5th Floor) - Passive Component
Active components all are Working but 28 I/O Box need to be replaced along with structure Cabling. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Falakata (5th Floor) - Passive Component
Active components all are Working but 20 I/O Box need to be replaced along with structure Cabling. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Sagardhighi (5th Floor) - Passive Component
Active components all are Working but 22 I/O Box need to be replaced along with structure Cabling. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Belda (5th Floor) - Passive Component
Active components all are Working but 31 I/O Box need to be replaced along with structure cabling. Repairing required & repairing ( Copper & Fiber) including installation from the floor wise department work for entire LAN materials, Dismantling of existing LAN equipment, LAN Installation & Integration , existing cable check-up and dressing, Rack Dressing with all connectors and termination of the data & voice port - Salboni (5th Floor) - Passive Component
Diamond Infotech Pvt Ltd
Arvind Limited (Telecom Division)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .