Tender Value
₹39.4 L
EMD Value
₹3.9 L
Closing Date
30 Apr 2026, 5:00 pmClosed
EO
Npp Banda
w.no. 31 Phyto Remidiation work
2026_DOLBU_1139189_10
74/NPP/2026-27/Dt 09-04-2026
Open Tender
Civil Works
Percentage
90 days
NPP BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,650
EO
₹3.9 L
15 Jun 2026
20 Apr 2026
2 May 2026
20 Apr 2026
30 Apr 2026
20 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Phyto work w.n. 31 | - | - | - | - |
| 2 | Excavation in foundation in ordinary soil(Loam clay or sand) including lift up to 1.5meter (5ft) and lead upto 30m (100ft) and including filling warening & rimming of excavated earth into the trenches or into the space between the building and the sides of SI No. 251 | - | cum | - | - |
| 3 | Sand fillling in plinth including supply of necessary quantity of sand from a distance not exceeding 8km. (5mile) from the site of work and including watering dressing etc. Rate to include cost of all materials, labour and T&P etc. required for proper completion of the work. SI. No. 255 | - | cum | - | - |
| 4 | Concrete with 4 cm. gauge stone ballast fine sand of 1.25fm and cement in proportion of 1:4:8 in foundation and under floors with ass labour for completion of work SI No. 281 | - | cum | - | - |
| 5 | Supply & Laying of Dry 40mm,20mm,10mm all mix grit in drain bed | - | cum | - | - |
| 6 | Random Course Rbble massonary in 1:4 Cement and fine sand mortar in foundation and plinth, including supply of all materials, labour & T&P etc. required for proper completion of the work. | - | cum | - | - |
| 7 | Raised pointing with cement and fine sand of 1.25 fineness modulus mortar on brick work in proportion of 1:2 including supply of all materials, labour and tools and plants etc. | - | sqm | - | - |
| 8 | Laying of P.C.C. 2cm. gauge approved ballast in proportion 1:2:4 (cement sand stone ballast) requird for proper completion of the work. SI No. 279B | - | cum | - | - |
| 9 | R.C.C. works cement appoved coatsesand and 2cm gauge approved stone ballast in the proportion 1:1.5:3 in wall,s and slab,s of drain excluding supply of reingrcement and its binding , but including its fixing and binding the same with 24 B.W.G.I. binding wire an including necessary cantering and shuttening etc. SI. No. 284 | - | cum | - | - |
| 10 | Steel Reinforcement for R.C.C work including straigthening , cutting , bending ,placing in position and binding all complete upto plinth level. DSR No. 5.2.2.1 | - | qtl | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_2127059.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .