Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.3 L+₹2,820 (0.34%)Rejected-Finance | ₹8.3 L+₹2,820 (0.34%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C REVATHI L1 | R V CONSTRUCTIONS AND INFRA DEVELOPERS L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe | 1,410 | Rm | 304 ₹4,28,640 Lowest | 304 ₹4,28,640 Lowest |
| 2.00 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. | 1,410 | Rm | 193 ₹2,72,130 Lowest | 195 ₹2,74,950 |
| 3.00 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm | 1,410 | Rm | 18 ₹25,380 Lowest | 18 ₹25,380 Lowest |
| 4.00 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification | 1,410 | Rm | 30 ₹42,300 Lowest | 30 ₹42,300 Lowest |
| 5.00 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. | 1,410 | Rm | 25 ₹35,250 Lowest | 25 ₹35,250 Lowest |
| 6.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend | 5 | Nos | 1,200 ₹6,000 Lowest | 1,200 ₹6,000 Lowest |
| 6.01 | 90 mm HDPE Elbow | 5 | Nos | 340 ₹1,700 Lowest | 340 ₹1,700 Lowest |
| 6.02 | 90 mm HDPE Flange set | 5 | Nos | 1,100 ₹5,500 Lowest | 1,100 ₹5,500 Lowest |
| 6.03 | 110 mm HDPE Tee | 5 | Nos | 815 ₹4,075 Lowest | 815 ₹4,075 Lowest |
| 6.04 | 110 x 90 mm HDPE Reducer | 5 | Nos | 300 ₹1,500 Lowest | 300 ₹1,500 Lowest |
Tender Value
₹9.9 L
EMD Value
₹9,950
Closing Date
22 Apr 2025, 3:00 pmClosed
Commissioner
The Commissioner, Hosur City Municipal Corporation
Laying Pipe Line at 1 to 15 in Hosur City Municipal Corporation
2025_MAWS_542498_7
000026/2025/E2/HOSUR CITY MUNICIPAL CORPORATION
Open Tender
Civil Works - Water Works
Works
30 days
Hosur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,950
13 Apr 2026
9 Apr 2025
22 Apr 2025
9 Apr 2025
22 Apr 2025
9 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_646563.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.24 MB
Tendernotice_2.pdf
PDF • 0.97 MB
BOQ_646563.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .