Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.3 LRejected-Finance | ₹8.3 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C REVATHI L1 | R V CONSTRUCTIONS AND INFRA DEVELOPERS L2 |
|---|---|---|---|---|---|
| 1.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers.(p.no.29) 90mm HDPE Pipe 90mm HDPE Pipe | 1,410 | Rm | 304 ₹4.3 L | 304 ₹4.3 L |
| 2.00 | Earth work excavation and deposition on the bank with an initial lead and lift of 10 meters and initial lift of 2 meters in hard stiffy clay stiff black cotton hard red earth murram, gravelly soils(SS20B) etc., complete as per std., specification. | 1,410 | Rm | 193 ₹2.7 L | 195 ₹2.7 L |
| 3.00 | Lowering the following HDPE pipes and specials into trench and laying to proper grade and alignment complete as per standard specification by deparment officers etc.., HDPE Pipe 90mm | 1,410 | Rm | 18 ₹25,380 | 18 ₹25,380 |
| 4.00 | Jointing the HDPE pipes and specials and testing the required pressure with water etc.., Complete as per standard specification | 1,410 | Rm | 30 ₹42,300 | 30 ₹42,300 |
| 5.00 | Refilling the excavated earth in to the trenches after laying the P.V.C. pipe in to the trench including cost of all labour charges and all other incidental charges etc., complete. | 1,410 | Rm | 25 ₹35,250 | 25 ₹35,250 |
| 6.00 | Supplying and Delivery of the following sizes of HDPE Pipes PE-100 - PN8 conforming to IS-4984/1995, as specified to technical specifications in standard length including labour charges for loading, un-loading and staging at stock yard etc.., complete as per standard specification as directed by the Department Officers. 90 mm HDPE stup bend | 5 | Nos | 1,200 ₹6,000 | 1,200 ₹6,000 |
| 6.01 | 90 mm HDPE Elbow | 5 | Nos | 340 ₹1,700 | 340 ₹1,700 |
| 6.02 | 90 mm HDPE Flange set | 5 | Nos | 1,100 ₹5,500 | 1,100 ₹5,500 |
| 6.03 | 110 mm HDPE Tee | 5 | Nos | 815 ₹4,075 | 815 ₹4,075 |
| 6.04 | 110 x 90 mm HDPE Reducer | 5 | Nos | 300 ₹1,500 | 300 ₹1,500 |
Tender Value
₹9.9 L
EMD Value
₹9,950
Closing Date
22 Apr 2025, 3:00 pmClosed
Commissioner
The Commissioner, Hosur City Municipal Corporation
Laying Pipe Line at 1 to 15 in Hosur City Municipal Corporation
2025_MAWS_542498_7
000026/2025/E2/HOSUR CITY MUNICIPAL CORPORATION
Open Tender
Civil Works - Water Works
30 days
Hosur City Municipal Corporation
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,950
13 Apr 2026
9 Apr 2025
22 Apr 2025
9 Apr 2025
22 Apr 2025
9 Apr 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_646563.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.24 MB
Tendernotice_2.pdf
PDF • 0.97 MB
BOQ_646563.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid