DDC Mandi Parishad Jhansi
Kisan mandi bhawan kanpur road jhansi
maintenance work of Rura Addu to Piyaniranjanpur Undeer KUMS Orai
2026_RKUMP_1147571_1
etender-2026 dt 124 12-05-2026
Open Tender
Civil Works - Roads
Percentage
180 days
Orai
Please refer Tender documents.
2 documents required · 2 mandatory
₹9,690
DDC Mandi Parishad
₹4.7 L
ddc rkump jhansi
2 Jun 2026
21 May 2026
29 May 2026
21 May 2026
29 May 2026
21 May 2026
21 May 2026 - 29 May 2026
28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embankment in Back cotton soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. (Excluding royality) SI No. 253 | 915.6 | CUM | 105 | ₹96,138 |
| 2 | Providing, laying, spreading and compacting 45-63mm gauge stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3-wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber, applying and brooming requiste type of screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading II as per technical specification clause | 27 | CUM | 3,162.7 | ₹85,392.9 |
| 3 | Providing, laying, spreading and compacting 22.4-53mm gauge stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3-wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber, applying and brooming requiste type of screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading III as per technical specification clause | 344.68 | CUM | 3,185.6 | ₹10,98,012.61 |
| 4 | Providing and Applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of raod surface any spraying primer at the rate 0.70 kg/Sqm using mechanical means. As per M.O.R.T.&H. specification clause 5.1 SI No -502 | 6,240 | SQM | 53.8 | ₹3,35,712 |
| 5 | Providing and Applying tack coat with Bitumen VG-10 using Pressiure distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 III | 7,755 | SQM | 24.2 | ₹1,87,671 |
| 6 | Providing and laying 20 mm thick open-graded premix carpet using Bitumen VG-10 composed of 13.2 mm to 5.6 mm aggregates to required line, grade and evel II serve as per MORD Specific 508 Clause by HMP | 7,755 | SQM | 201.7 | ₹15,64,183.5 |
| 7 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 | 7,755 | SQM | 72.01 | ₹5,58,437.55 |
| 8 | Brick edging on both sides of the road with M-150 class bricks 8 cm (3") wide and 12 cm. 4.5" deep laid with mud mortar including labour and supply of bricks finished to required template and proper alignment and also including dressing and rammingg the excavated earth as directed by Enineer-in-charge. S.I. No. 765 & analysis | 0.7 | KM | 68,250 | ₹47,775 |
| 9 | Supply and fixing of Road Sign Board of approved drawing and design including cost of all materials, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-charge. | 1 | No | 5,000 | ₹5,000 |
| 10 | Maintenance of First year (0.00% of Total Amount of Premixing etc. work) from Item no 01 to 17 | 39,78,322.56 | Job | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.96 MB
BOQ_2157330.xls
BOQ • 0.29 MB
T-2RuraAddu2.pdf
Tender Documents • 6.15 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .