| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 CrAdmitted-Finance | ₹1.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹19.7 L (18.8%)Admitted-Finance | ₹1.2 Cr+₹19.7 L (18.8%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹23.5 L (22.4%)Admitted-Finance CMS ATS GSO KALPAKKAM 603 102 CHENGALPATTU DISTRICT TAMIL NADU | CHENGALPATTU | TAMIL NADU | 603102 | ₹1.3 Cr+₹23.5 L (22.4%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. Ashok constructions L3 | G SUBRAMANIAN SONS L2 | A.BASHKAR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Clearing light jungle area, bulb weeds, grass including cutting all unwanted plants, branches, twigs, wild growth etc. complete, and disposing the same 100metres away manually or burning them without disturbing other areas etc., complete all as directed by the Engineer-in-Charge. Contractor must be informed to Engineer-in-charge and prior permission shall be obtained from him for burning the wild growth. | 3,550 | Sq.m | 12 ₹42,600 | 10 ₹35,500 | 6 ₹21,300 Lowest |
| 2.00 | Earth work excavation for by mechanical means (Hydraulic excavator) or manual means for foundations, substructures, plant beam, cess pits and all kinds of foundation etc. in all types of soil like hard gravel soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (disposed soil to be leveled by breaking clods, if any and neatly dressed and levelled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge.All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | 490 | Cu.m | 400 ₹1,96,000 | 400 ₹1,96,000 | 300 ₹1,47,000 Lowest |
| 3.00 | Providing and laying plain cement concrete 1:4.5:8 using 25mm maximum size graded aggregate including machanical mixing, transporting and placing in required position, ramming, compaction, leveling, shuttering, curing, dewatering if any, complete all as per specifications for levelling courses in foundation for walls, footing, floor drains, etc as directed by engineer incharge complete all as per specification. | 80 | Cu.m | 8,050 ₹6,44,000 | 6,500 ₹5,20,000 Lowest | 7,400 ₹5,92,000 |
| 4.00 | Manufacturing, supplying, hoisting and fixing in position at all lifts, precast units of various patterns and sizes for precast plain solid units, slabs, exhaust fan moulds etc., in reinforced cement concrete of 1:1.5:3, using 20mm and below machine crushed graded stone aggregate including weigh batching, mechanical mixing, casting, vibrating, finishing of exposed faces, curing, necessary formwork & moulds, transporting and placing at all lifts, preparation of connections, grouting with cement mortar/cement grout wherever needed excluding steel reinforcement complete all as per drawing, specification and as directed by Engineer-in-Charge. | 160 | Cu.m | 12,500 ₹20,00,000 | 12,000 ₹19,20,000 | 11,900 ₹19,04,000 Lowest |
| 5.00 | Providing, straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement TMT bars of Fe500D grade steel conforming to IS:1786 'SAIL or VIZAG or approved equivalent make' and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks in cement mortar 1:2 and binding wire complete all as per specification and as directed by Engineer-in-Charge at all lifts.
Note: The rate shall be including the cost of reinforcement steel. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see Clause 11 of Section VIII, General Information for Guidance of Tenderers. | 13 | MT | 1,10,000 ₹14,30,000 | 1,00,000 ₹13,00,000 Lowest | 1,13,000 ₹14,69,000 |
| 6.00 | Providing and laying plain cement concrete 1:2:4 using 20mm maximum size graded aggregates including mechanical mixing, transporting and placing in required position, ramming, compaction, leveling, curing, shuttering, dewatering if any, complete all as per specification for leveling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. | 35 | Cu.m | 6,500 ₹2,27,500 Lowest | 6,500 ₹2,27,500 Lowest | 7,900 ₹2,76,500 |
| 7.00 | Providing and constructing random rubble masonry in cement morter 1:6 using hard granite stones obtained from approved quarry with bond stones at 2.00 metres apart for storm water drain walls, including sizing of stones if required, raking out joints, curing etc., complete all as per drawing, specifications and as directed by Engineer-in-charge at all lifts. | 260 | Cu.m | 7,000 ₹18,20,000 | 6,500 ₹16,90,000 | 6,275 ₹16,31,500 Lowest |
| 8.00 | Providing and forming dry stone pitching of 230mm thick over the filled earth surface including laying to the required grade and slope, packing and filling the intersects with broken stone and gravel, watering, compaction etc., complete in all respects all as per specification and as directed by the Engineer-in-Charge. | 5,850 | Sq.m | 1,000 ₹58,50,000 | 1,030 ₹60,25,500 | 630 ₹36,85,500 Lowest |
| 9.00 | Providing plastering to the external surfaces of brickwork/concrete at all elevations in cement mortar 1:5, 20mm thick in two coats including hacking of concrete surfaces with pointed tool, scaffolding, finishing, curing, forming grooves wherever necessary, all as per specifications. | 80 | Sq.m | 550 ₹44,000 | 550 ₹44,000 | 375 ₹30,000 Lowest |
| 10.00 | Supplying and filling the selected earth from outside of DAE installation (with a lead of 28 kilometres) including excavation from borrow pits if any required. Filling in layer of not more than 150mm thick, each layer well rammed and consolidated by mechanical roller including water consolidation etc. levelling, dressing the top surface to the required level, comlying with standard specification and as directed by the Engineer-in-charge. Proper trip sheet recordsshall be maintained for bringing the earth through DAE main gate with security stamp duly signed by Departmental Engineer. | 100 | Cu.m | 1,310 ₹1,31,000 | 1,300 ₹1,30,000 | 884 ₹88,400 Lowest |
Tender Value
₹1.2 Cr
EMD Value
₹2.4 L
Closing Date
4 May 2026, 3:00 pmClosed
General Manager, INRP(K)
Office of GM, 608 Building, BARC, Kalpakkam
Slope Protection work for Road Embankment on East and South side of NSDF-II site at BARCF, Kalpakkam
2026_BARC_905696_1
BARCF/INR-PRJ/CI/TR/14/2026
Open Tender
Civil Works
Item Rate
300 days
INRPK/NRB/BARC/Kalpakkam
Please refer tender documents
8 documents required · 8 mandatory
₹0
₹2.4 L
21 May 2026
20 Apr 2026
5 May 2026
20 Apr 2026
4 May 2026
20 Apr 2026
20 Apr 2026 - 29 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing light jungle area, bulb weeds, grass including cutting all unwanted plants, branches, twigs, wild growth etc. complete, and disposing the same 100metres away manually or burning them without disturbing other areas etc., complete all as directed by the Engineer-in-Charge. Contractor must be informed to Engineer-in-charge and prior permission shall be obtained from him for burning the wild growth. | - | Sq.m | - | - |
| 2 | Earth work excavation for by mechanical means (Hydraulic excavator) or manual means for foundations, substructures, plant beam, cess pits and all kinds of foundation etc. in all types of soil like hard gravel soil, sandy soil for the following depth from average ground level upto the required founding level, line and grades in both dry and wet conditions including shoring, strutting, bailing out of water if necessary, levelling and ramming the bottom of trenches, dressing of sides, stacking the excavated materials away from the edge of trenches, refilling the sides of foundation as required with selected excavated earth and depositing / disposing the surplus excavated earth (disposed soil to be leveled by breaking clods, if any and neatly dressed and levelled) within the lead specified below all complete as per specifications and as directed by the Engineer-in-charge.All kinds of soil with depth upto 1.5m below average Ground level and disposing surplus excavated earth upto a lead of 50 metres. | - | Cu.m | - | - |
| 3 | Providing and laying plain cement concrete 1:4.5:8 using 25mm maximum size graded aggregate including machanical mixing, transporting and placing in required position, ramming, compaction, leveling, shuttering, curing, dewatering if any, complete all as per specifications for levelling courses in foundation for walls, footing, floor drains, etc as directed by engineer incharge complete all as per specification. | - | Cu.m | - | - |
| 4 | Manufacturing, supplying, hoisting and fixing in position at all lifts, precast units of various patterns and sizes for precast plain solid units, slabs, exhaust fan moulds etc., in reinforced cement concrete of 1:1.5:3, using 20mm and below machine crushed graded stone aggregate including weigh batching, mechanical mixing, casting, vibrating, finishing of exposed faces, curing, necessary formwork & moulds, transporting and placing at all lifts, preparation of connections, grouting with cement mortar/cement grout wherever needed excluding steel reinforcement complete all as per drawing, specification and as directed by Engineer-in-Charge. | - | Cu.m | - | - |
| 5 | Providing, straightening, decoiling wherever necessary bending, cutting, binding and fixing in position steel reinforcement TMT bars of Fe500D grade steel conforming to IS:1786 'SAIL or VIZAG or approved equivalent make' and tying with approved annealed binding wire of 1.6mm dia in all reinforced cement concrete work at all lifts, including cost of supplying and fixing the spacer/cover blocks in cement mortar 1:2 and binding wire complete all as per specification and as directed by Engineer-in-Charge at all lifts.
Note: The rate shall be including the cost of reinforcement steel. The reinforcement steel will be procured from dealers with a test certificate as approved by the department. For further details please see Clause 11 of Section VIII, General Information for Guidance of Tenderers. | - | MT | - | - |
| 6 | Providing and laying plain cement concrete 1:2:4 using 20mm maximum size graded aggregates including mechanical mixing, transporting and placing in required position, ramming, compaction, leveling, curing, shuttering, dewatering if any, complete all as per specification for leveling courses in foundation for walls, footings, floor drains etc., encasing pipes and other required works directed by Engineer-in-Charge complete all as per specifications. | - | Cu.m | - | - |
| 7 | Providing and constructing random rubble masonry in cement morter 1:6 using hard granite stones obtained from approved quarry with bond stones at 2.00 metres apart for storm water drain walls, including sizing of stones if required, raking out joints, curing etc., complete all as per drawing, specifications and as directed by Engineer-in-charge at all lifts. | - | Cu.m | - | - |
| 8 | Providing and forming dry stone pitching of 230mm thick over the filled earth surface including laying to the required grade and slope, packing and filling the intersects with broken stone and gravel, watering, compaction etc., complete in all respects all as per specification and as directed by the Engineer-in-Charge. | - | Sq.m | - | - |
| 9 | Providing plastering to the external surfaces of brickwork/concrete at all elevations in cement mortar 1:5, 20mm thick in two coats including hacking of concrete surfaces with pointed tool, scaffolding, finishing, curing, forming grooves wherever necessary, all as per specifications. | - | Sq.m | - | - |
| 10 | Supplying and filling the selected earth from outside of DAE installation (with a lead of 28 kilometres) including excavation from borrow pits if any required. Filling in layer of not more than 150mm thick, each layer well rammed and consolidated by mechanical roller including water consolidation etc. levelling, dressing the top surface to the required level, comlying with standard specification and as directed by the Engineer-in-charge. Proper trip sheet recordsshall be maintained for bringing the earth through DAE main gate with security stamp duly signed by Departmental Engineer. | - | Cu.m | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 11.88 MB
BOQ_951980.xls
BOQ • 0.32 MB
tenderdoc.pdf
Tender Documents • 35.94 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .