Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 690 MELA STREET AGARAM ALAGAPURAM PO ANDIMADAM TK ARIYALUR DIST 608901 | ANDIMADAM | ARIYALUR | TAMIL NADU | 608901 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
4 Aug 2022, 3:00 pmClosed
Project Director
DRDA, Ariyalur
Providing New Borewell with 10HP Motor at Pappakudi Irular Street Hab of Pappakudi Panchayat Package No TN 30-01 in Jayankondam Block in Ariyalur District for the year 2021-22under convergence plan (15th Finance Commission District Panchayat Fund)
2022_RDTN_242316_1
A12/3213/2022, Dated.11.07.2022
Open Tender
Civil Works - Water Works
Works
180 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹12,000
DRDA, Ariyalur
12 Aug 2022
18 Jul 2022
4 Aug 2022
18 Jul 2022
4 Aug 2022
18 Jul 2022
19 Jul 2022
Amount
Geo-physical survey charges including conveyance charges for Geo-physical instruments and other accessories
Drilling of Borewells anywhere in Tamilnadu including transportation from one place to another with in Tamilnadu in alluvial soil sedimentary strata of clay and sand stone shale pebbles boulders etc. By first taking a pilot bore of 140 mm/150mm dia and then enlarging to required dia direct or reverse rotary mud circulation method using rotary rigs, fuel, labour and drilling bentonite and water required for drilling at site (Site will be shown by the TWAD Board Officers) including construction of mud pit. Drilling of 140/150 mm pilot bore
Upto 60 m Depth ending below ground level
From 60 m upto 90 m Depth ending from ground level
From 90 m upto 120 m Depth ending from ground level
From 120 m upto 150 m Depth ending from ground level
From 150 m upto 180 m Depth ending from ground level
Reaming 200 mm dia pilot bore to 350mm dia bore as directed by the Departmental Officers
Upto 60 m depth ending below ground level
From 60 m depth and upto 90 mt depth ending below ground level
From 90 m upto 120 m depth ending below ground level
From 120 m upto 150 m depth ending below ground level
From 150 m upto 180 m depth ending below ground level
Reaming 300 mm dia pilot bore to 400mm/ 450mm dia bore as directed by the Departmental Officers
Upto 60 m depth ending below ground level
From 60 m depth and upto 90 mt depth ending below ground level
From 90 m upto 120 m depth ending below ground level
From 120 m upto 150 m depth ending below ground level
From 150 m upto 180 m depth ending below ground level
Supply & delivery of 200mm Dia PVC Plain Casing pipe (Medium depth) as per IS 12818 / 2010
Supply & delivery of 200mm Dia PVC Ribbed Screeen pipe as per IS 12818 / 2010
Supply & delivery of 200mm Dia OD PVC End Cap
Labour Charges for inserting 200mm mm dia (M.S. Casing pipes assembly with slots or with out slots) in the drilled hole including welding the joints etc., complete and supplying and packing the annular space with pebbles of size and quality as approved by the Departmental Officers
Charges for developing the Borewell with air compressor of 600 CFM capacity (Minimum 8 Hours) including transportation, labour and fuel charges for compressor as directed by Departmental Officers and conducting yield test by 'V' notch method
Supply and Delivery of 10.00 HP Submersible Pumpset suitable for Borewell conforming to I.S Specification having Duty of 100lpmx125m head
Supply and Delivery of Three Phase Panel Board with necessary fittings suitable for 10.00 HP Submersible Pumpset
Supply and Delivery of 4.00 Sq.mm PVC Insulated and Sheathed 3 Core Flat type Copper cable Conforming to IS 694/1990
Labour charges for the erection of submersible pumpset in borewell/openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days. Above 5.00 HP to 10.00 HP
Supply, Delivery and fixing of Bore cap using M.S. Flat of size 1 cm x 3 mm and M.S. sheet on top with bolting arrangements for securing the cap in position (8 " Casing Pipes)
Supply and Delivery of 63mm dia HDPE Pipe (PN10)
Supply and Delivery of following GI Pipes and Specials Conforming to relevent ISI Specifications
50 mm GI Flange set
32 mm GI Bend
32 mm GI Union
63 mm GI Coupling
40 mm MS Clampset
32 mm G.M Gate valve
50 mm G.M Non Return valve
50mm x 32mm GI Reducer
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RR CONSTRUCTION
SUSAIRAJ S
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .