| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹6.6 LAdmitted-Fee/PreQual/Technical/Finance AT PO TARIKUND RAGHUNATHPUR DIST JAGATSINGHAPUR | RAGHUNATHPUR | JAGATSINGHAPUR | ODISHA | -27.00% | ₹6.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.8 LAdmitted-Fee/PreQual/Technical/Finance | -25.50% | ₹6.8 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.0 LAdmitted-Fee/PreQual/Technical/Finance AT KANTABALLAVPUR PO JAGATSINGHPUR DIST JAGATSINGHPUR PIN 754103 | JAGATSINGHPUR | JAGATSINGHPUR | ODISHA | 754103 | -22.40% | ₹7.0 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.2 LAdmitted-Fee/PreQual/Technical/Finance | -21.00% | ₹7.2 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹7.3 LAdmitted-Fee/PreQual/Technical/Finance | -20.00% | ₹7.3 L | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹9.1 L
EMD Value
₹9,100
Closing Date
2 Jun 2026, 5:30 pmClosed
Block Development Officer
O/o the Panchayat Samiti, Raghunathpur
Construction of Office Building of Tarikunda PACS under Raghunathpur Block
2026_PRBRP_129462_1
NOTICE NO.BDO-TPS-02 OF 2026-27
Open Tender
Civil Works - Buildings
Percentage
240 days
Raghunathur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹9,100
Yes
11 Jun 2026
19 May 2026
3 Jun 2026
19 May 2026
2 Jun 2026
19 May 2026
19 May 2026 - 28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation of foundation in all kinds of soil including dressing and levelling the foundation bed and depositing the excavated materials clear of work site with all leads, lifts, delifts and dewatering & shoring including removing bushes, stumps and any other foreign materials from the working area as well as from the foundation trenches with cost of all labour, T&P, hire and running charges of all machineries, labour cess etc. complete in all respects as per specification and direction of the Engineer-in-Charge. | - | One Cum | - | - |
| 0_) | Filling in foundation & plinth with sand well watered to saturated condition in 23.20cm thick layers wtih watering & ramming including all cost, carriage, royalty, taxes of materials with all labour charges cess etc. complete as per the direction of the Engineer-in-Charge. | - | One Cum | - | - |
| 0_) | Filling in foundation trenches and plinth with excavated earth including laying the earth in layers not exceeding 23.5 cm thick with watering and ramming etc. complete as per the direction of the Engineer-in-Charge. | - | One Cum | - | - |
| 0_) | Cement Concrete (1:3:6) with 40mm size hard granite crusher broken metal confirming to relevant BIS specifications with all cost, conveyance, royalty of all materials T&P, cess including scaffolding, walkways & properly mixing, hoisting & placing concrete to desired workability & curing for recommended period etc. complete as per the direction of the Engineer-in-Charge. | - | One Cum | - | - |
| 0_) | Flyash brick masonry in cement mortar (1:6) in foundation & plinth using Flyash bricks of 23x11x8cm size having a crushing strength of not less than 75 kg./sq.cm including splays cutting, circular moulding, chamfering and cur belling, watering and curing etc. complete including cost, conveyance, royalty, taxes of all the materials required for the work with all labour, T&P and cess etc. complete in all respect as per specification and direction of the Engineer-in-charge. | - | One Cum | - | - |
| 0_) | Providing R.C.C work of M-20 grade with 20mm and downgraded clean hard crusher broken granite chips of approved quality from approved quarry including hoisting, lowering and laying concrete with necessary slope and smoothness to receive tar felting or terracing, watering and curing for four weeks,excluding centring, shuttering and finishing the exposed surface and ceiling smooth to receive white washing or painting providing grooves or beads and fan hooks as per requirement in ceiling where necessary, cost of water, including cost, conveyance, royalty taxes of all the materials and labour, T&P and cess etc. complete in all respect but excluding cost of M.S rods or Tor steel and binding wire 18 to 20 gauge and labour charges for straightening, cutting, bending and binding and tying the grills and placing in proper position as per specification and direction of the Engineer-in-charge. (Column Base) | - | One Cum | - | - |
| 0.9_) | Plinth beam | - | One Cum | - | - |
| 0.0_) | Columns and Beams | - | One Cum | - | - |
| 0.9_) | Lintel | - | One Cum | - | - |
| 0.0_) | Roof Slab / Chajja | - | One Cum | - | - |
stage.html
html • 0.03 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BID1.pdf
Tender Documents • 19.72 MB
BOQ_591864.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].