| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.9 LAccepted-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹10.9 L | L1 | Accepted-Finance L1 |
| 2 | L2₹13.9 LAccepted-Finance GRAM KISHUNDASAPUR JANPAD AZAMGARH UTTAR PRADESH | AZAMGARH | AZAMGARH | UTTAR PRADESH | ₹13.9 L | L2 | Accepted-Finance L2 |
| 3 | L3₹15.1 LAccepted-Finance 52 H NEW COLONY ROBERTSGANJ SONBHADRA | SONBHADRA | UTTAR PRADESH | 231205 | ₹15.1 L | L3 | Accepted-Finance L3 |
| 4 | L4₹15.7 LAccepted-Finance 1 A K CONSTRUCTION KAKORI LUCKNOW KAKORI LUCKNOW UTTAR PRADESH 226101 | LUCKNOW | UTTAR PRADESH | 226101 | ₹15.7 L | L4 | Accepted-Finance L4 |
| Sl No | Description | Qty | Unit | a.k. construction L4 | M/S UDAY NARAYAN DEV PANDEY L3 | M/S BADRI SINGH L1 | M/S PRAGATI CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of soil for completing canal section including all lead & lift, labour and T&P etc. required for proper completion of work. | 360.11 | M3 | 95 ₹34,210.07 | 48.7 ₹17,537.16 | 40 ₹14,404.24 | 45 ₹16,204.77 |
| 2.00 | Earth work in excavation of mixed soil with lime stone, sand stone or other soft rock excavated by pick axe but not required blasting including all lead & lift, labour and T&P etc. required for proper completion of work. | 5,545.63 | M3 | 180 ₹10.0 L | 132.93 ₹7.4 L | 40 ₹2.2 L | 122 ₹6.8 L |
| 3.00 | Excavating other rocks by blasting removing muck and stacking including all lead ,lift, labour and T & P etc required for proper completion of work. | 1,296.38 | M3 | 300 ₹3.9 L | 424.1 ₹5.5 L | 500 ₹6.5 L | 392 ₹5.1 L |
| 4.00 | Earth work in filling by power transport for making embankment for the construction of canal section with lead upto 1.0 Km and lift including cost of soil, labour charges and T & P etc with vibro mechanical compaction to achieve min 95.0 % dry density along with proper dressing and watering to bring at O.M.C. required for proper completion of work . | 1,106.63 | M3 | 110 ₹1.2 L | 169 ₹1.9 L | 140 ₹1.5 L | 155 ₹1.7 L |
| 5.00 | Earth filling with useful quantity of excvavated ordinary soil earth in making canal section including cost of mechanical compaction ,lead upto 210 m, lift, labour and T&P and taxes etc required for proper completion of work. | 360.11 | M3 | 80 ₹28,808.48 | 63.7 ₹22,938.75 | 140 ₹50,414.84 | 58.5 ₹21,066.20 |
Tender Value
Refer Docs
EMD Value
₹47,000
Closing Date
15 May 2026, 3:00 pmClosed
Executive Engineer
Executive Engineer Kanhar Construction Division-2 Pipri Sonbhadra
Earthwork in Construction of Harnakachhar Minor from Km. 0.600 to Km 0.865
2026_UPIDC_1145188_1
01/EE/2026-27
Open Tender
Civil Works
60 days
Harnakachhar Duddhi Sonbhadra
Please refer Tender Document
2 documents required · 2 mandatory
₹1,180
₹47,000
6 Jun 2026
4 May 2026
15 May 2026
5 May 2026
15 May 2026
5 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation of soil for completing canal section including all lead & lift, labour and T&P etc. required for proper completion of work. | 360.11 | M3 | - | - | M3 |
| 2 | Earth work in excavation of mixed soil with lime stone, sand stone or other soft rock excavated by pick axe but not required blasting including all lead & lift, labour and T&P etc. required for proper completion of work. | 5,545.63 | M3 | - | - | - |
| 3 | Excavating other rocks by blasting removing muck and stacking including all lead ,lift, labour and T & P etc required for proper completion of work. | 1,296.38 | M3 | - | - | - |
| 4 | Earth work in filling by power transport for making embankment for the construction of canal section with lead upto 1.0 Km and lift including cost of soil, labour charges and T & P etc with vibro mechanical compaction to achieve min 95.0 % dry density along with proper dressing and watering to bring at O.M.C. required for proper completion of work . | 1,106.63 | M3 | - | - | - |
| 5 | Earth filling with useful quantity of excvavated ordinary soil earth in making canal section including cost of mechanical compaction ,lead upto 210 m, lift, labour and T&P and taxes etc required for proper completion of work. | 0.4 | M3 | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.05 MB
BOQ_2140502.xls
BOQ • 0.32 MB
Tenderdocument.pdf
Tender Documents • 0.95 MB
Download all tender documents and submit your bid