| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹134.2 CrAdmitted-Finance | -5.00% | ₹134.2 Cr | L1 | Admitted-Finance |
| 2 | L1₹134.2 CrAdmitted-Finance | -5.00% | ₹134.2 Cr | L1 | Admitted-Finance |
| 3 | L1₹134.2 CrAdmitted-Finance | -5.00% | ₹134.2 Cr | L1 | Admitted-Finance |
| 4 | L1₹134.2 CrAdmitted-Finance | -5.00% | ₹134.2 Cr | L1 | Admitted-Finance |
| 5 | L1₹134.2 CrAdmitted-Finance | -5.00% | ₹134.2 Cr | L1 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
9 Apr 2026, 3:00 pmClosed
GM C and P
Pride Purple Coronet, 2nd Floor, Baner Road, Baner, Pune - 411045
Tender for Item Rate Contract for a period of 1-year for laying of underground PE pipeline and aboveground GI / Cu installation for CGD Network of MNGL for Pune GA
2026_MNGL_273859_1
MNGL/CP/2026-27/02
Open Tender
Miscellaneous Works
365 days
Pune
As per tender terms and Conditions
17 documents required · 17 mandatory
₹0
₹2 L
Yes
Online/VC
23 Apr 2026
2 Apr 2026
10 Apr 2026
2 Apr 2026
9 Apr 2026
2 Apr 2026
3 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | 1.1 ) MDPE Laying in any surface (including hard rock) | - | - | - | - | item1 |
| 2 | Excluding supply of all MDPE pipes (PE 80/100,SDR11), but Including supply of Bends, Couplers, End caps, Tees, PE Reducer, CS to PE Fitting, Saddle Tapping, Warning mat etc. as required to complete the job. (Particular job specification.)
"Receiving and taking-over" as defined in the specification, handling, loading, transportation and unloading of Owner supplied MDPE line pipes (PE80/100, SDR11) of all sizes (as free issue items) from Owner's designated place(s) of issue to Contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover, including supply of accessories of all sizes & thickness like Bends, Couplers, End caps, Tee, PE Reducer, CS to PE Fittings, Saddle Tapping, Warning Mat etc. | - | - | - | - | item2 |
| 3 | Stringing/ uncoiling of the MDPE line pipe on the pipeline Right-of-Use, laying/ installation of MDPE line pipe (alongwith installation of required accessories as mentioned above) of following sizes, including executing all works; fabrication, access for construction; supply of all materials (except Owner supplied materials), consumables, labour and other incidental works and handing over the same after return of the surplus pipes to the Owner's designated stockyard(s); carrying out all temporary, ancillary, auxiliary works required to make the MDPE pipeline ready for commissioning as per drawings, specifications, scope of work indicated in PJS and other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: | - | - | - | - | item3 |
| 4 | Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits to determine the underground utilities/ services etc., restoration of the abandoned trial pits to original condition. Grading the ROU, barricading the work area as per local authorities norms & to satisfaction of EIC, installation of safety signs, trenching to required depth, repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner/other utility agencies). Uncoiling/ stringing of pipes, clamping, jointing of the pipe ends/ fittings/ valves by qualified personnel using approved electro-fusion techniques as per specification. | - | - | - | - | item4 |
| 5 | Excavation of trench and Lowering the pipeline in trench to required depths, placement of HDPE warning grid mat over the pipeline along the complete route, padding around pipeline with suitable approved soil, backfilling with available excavated material after screening, compaction with jumping jack compactor and water at subsequent layers of 150mm above warning mat. All tiles/slabs/curb stones etc removed during excavation shall be placed properly. Roads, pavements, footpaths etc. to be made motorable wherever pipeline is laid.
MDPE Pipe shall be laid in such a way so that top cover of MDPE Pipe is 1.0 mtr. However in case if additional depth (up to 1.5 mtr) required due to any reason shall be coverd in this SOR. | - | - | - | - | item5 |
| 6 | Installation and electro-fusion jointing of valves wherever required and as directed by Engineer-in-charge. Restoration of area to original condition, including cleaning the area of all unserviceable materials, debris, excess earth near trenches to the designated disposal area as per the specifications, instruction of Owner/Engineer-in-charge and to the satisfaction of local authorities.
Restoration of all surrounding ground features to that existing before as detailed out in the specifications and as directed by Engineer-in-charge which would include replanting of any uprooted trees etc. Pneumatic testing, purging with nitrogen and commissioning as per specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per the instructions of the Engineer-in-charge. | - | - | - | - | item6 |
| 7 | Maintaining the completed pipelines/ installation for any defect, failures during defect liability period (i.e. 12 months from date of completion of work). Handing over the completed works to MNGL for their operation/ use, returning of all free issue surplus material to MNGL stores, reconciliation of free issue material area wise and obtaining "no objection certificate" from MNGL/Consultant. | - | - | - | - | item7 |
| 8 | Preparation and submission of Daily progress report, Laying Graphs/ PE/ GI line cards.
On completion of gas charging of pipelines. Preparation and submission of As-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract. | - | - | - | - | item8 |
| 9 | Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to MNGL. | - | - | - | - | item9 |
| 10 | Supply and installation of GI sleeve(21/2" and 3" as instructed by EIC) with concrete mix (Pedestal) and filling it with sand, sealing the annuals, Inserting of MDPE pipe in Hume pipe for road crossing, supply of soft soil if required for padding comes under this SOR is in the contractor's scope. Breaking through any obstructions and their subsequent restoration, as per specifications and instructions of the Engineer-in-charge is included in this SOR item.Liasioning and Follow-up for permission with all the concerned customer, society members, chairmans etc. is the Contractor's scope. | - | - | - | - | item10 |
stage.html
html • 0.25 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.19 MB
Drawings.pdf
Tender Documents • 11.46 MB
Tender_02.pdf
Tender Documents • 2.53 MB
List.pdf
Other Document • 0.10 MB
BOQ_319741.xls
BOQ • 0.50 MB
Download all tender documents and submit your bid