Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹3.0 LAccepted-AOC | ₹3.0 L | 1st | Accepted-AOC Win in lottery |
| 2 | 1st₹3.0 LRejected-AOC | ₹3.0 L | 1st | Rejected-AOC Reject in lottery |
| 3 | 1st₹3.0 LRejected-AOC AT POLORAJPUR PO SURANGI PS JARADA DIST GANJAM PIN 761037 | GANJAM | ODISHA | 761037 | ₹3.0 L | 1st | Rejected-AOC Reject in lottery |
| 4 | 1st₹3.0 LRejected-AOC | ₹3.0 L | 1st | Rejected-AOC Reject in lottery |
| 5 | 1st₹3.0 LRejected-AOC AT JAGANNATHPUR PO TURUBUDI PS JARADA DIST GANJAM PIN 761209 | GANJAM | ODISHA | 761209 | ₹3.0 L | 1st | Rejected-AOC Reject in lottery |
Tender Value
₹3.6 L
EMD Value
₹3,600
Closing Date
29 Dec 2025, 4:00 pmClosed
Superintending Engineer Ganjam Rand B Division No
Office of the Superintending Engineer Ganjam R and B Division No I berhampur
Annual repair of Tahasil office building such as providing painting works etc at Chikiti
2025_EICCL_123744_1
SE R and B Divn NoI Bam 43/2025-26
Open Tender
Civil Works - Buildings
365 days
Ganjam
2 documents required · 2 mandatory
₹2,000
₹3,600
Yes
19 Mar 2026
23 Dec 2025
30 Dec 2025
23 Dec 2025
29 Dec 2025
23 Dec 2025
23 Dec 2025 - 29 Dec 2025
Removing old lime or cement plaster from walls including racking joints 12 mm. deep and removing debries within 50 meters lead.
Earth work in ordinary soil within 50m. Initial lead and 1.5m. Initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the Engineer-in-charge.
Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge
Cement concrete of proportion (1:3:6) in foundation and floors using 4cm size clean hard black crusher broken granite stone metal of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15 cm. (6") thick to the required level ramming, watering, curing etc. complete including cost, conveyance, royalties of all materials with all labour and T&P required for the work etc. complete in all respect and as per the direction of the Engineer-in-charge.
Fly Ash Brick masonry in C.M. (1:6) using 9" size in Foundation & Plinth using of 23cmx11cmx8cm size brick having a crushing strength of not less than 75 kg per Sq.cm including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, royalties of all materials, labour with T&P etc. complete in all respect as directed by the Engineer-in-charge.
Fly Ash Brick masonry in C.M. (1:6) using 9" size in Super structure using of 23cmx11cmx8cm size brick having a crushing strength of not less than 75 kg per Sq.cm including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, royalties of all materials, labour with T&P etc. complete in all respect
Providing 12 mm thick cement plaster with cement mortar of mix (1:6) with screened and washed sharp sand for mortar and finished smooth to the rough surface of walls in all heights after racking out joints including watering and curing, rounding of corners, providing grooves where ever necessary with cost, conveyance, royalties of all materials with cost of all labour,labour cess, T&P, and scaffolding required for the work etc. complete in all respect
R.C.C. work of proportion M-20 grade having minimum compressive strength in work test of 200 Kg/Cm2 at 28 days using 20 mm and down graded size black hard crusher broken granite stone chips of approved quality and from approved quarry including hoisting lowering and laying concrete and compacting by using vibrators watering, curing for 28 days, centring & shuttering and finishing the exposed surface smooth providing grooves or beads where necessary in all floors including cost, conveyance, royalties and taxes of all materials , cost of all labour with cost of all T&P required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or steel & binding wires and labour charges for strengthening, cutting, bending grills and placing in proper position etc complete as per direction of Engineer-in-Charge
Cutting, straightening coiled or bent up M.S. Rod or tor steel of SAIL/ TATA / RINL (VIZAG) make including bending, binding, welding and joining if necessary and tying the grills and placing in position as required for R.C.C. Work and for providing fan hooks as required, hoisting, lowering, laying including cost, conveyances, taxes of M.S. Rod or tor steel and binding wires of 18 to 20 gauge and labour required for the work for bending, binding and tying the grills in all floors (Linear measurement will be taken and quantity will be calculated basing on the standard weight of B.I.S. for M.S. Rods or tor steel only. Wastage if any, including weight of binding wire will not be considered for measurement) etc. complete as per specification & direction of Engineer-in-charge.
Providing, fitting, fixing up partition walling OEL aluminium anodized section No. 9210 and 9207 as single groove and double groove respectively as horizontal and vertical member and OEL section 4660 as Tapered clip for fixing up ACP Board and Glass and jointing angle No. 1855 including all fitting ,cost of all materials, taxes, labour, T&P etc. complete as per direction of Engineer in Charge.
Supplying, fitting, fixing up window (sliding type) made up aluminium Section 9778 as windows frame, section No. 4095,4096 and 9777, 3994 as shutter frame with 5mm thick black glass as panel fitted with rubber beading including locking arrangement including all fitting including cost of materials , all texes labour, T&P excluding cost of glass etc. complete as per direction of Engineer- in-charge.
Painting two coats with plastic emulsion paint to make an even finished surface in all floors and heights to wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffolding, staging charges with cost, conveyance, taxes of all materials, cost of all labour, T&P etc. complete as per the direction of the Engineer-in-charge
Enamel Painting two coats with any approved paints of approved colour, shade over new wood & Iron work including sand papering, polishing the surface, cost, conveyances, taxes of all materials and cost of all labour with T&P etc, complete as per specification & direction of Engineer-in-charge.
Painting 2 (two) coats with any approved weather coat over a coat of primer with brush to out wall surface after scraping & cleaning the surface including cost of paint, with cost, conveyance and cess, taxes of all materials and labour with T&P required for the work etc. complete in as per specification and direction of Engineer-in-Charge.
Finishing plastered surfaces with Acrylic wall putty (water based) of approved make and finishing the surface smooth and even by sand papering to receive paint in walls, at all heights with staging wherever necessary with cost, conveyance, taxes of all materials, cost of all labour, all T&P etc. required for the work complete in all respect as per the direction of the Engineer-in-charge.
Scarping old paint with scrapers , sand papering and washing with soap water or soda including scaffolding charges above 5m high and upto 8m height
Please Enable Macros to View BoQ information
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_573141.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 1.51 MB
Tendernotice_1.pdf
PDF • 0.60 MB
BOQ_573141.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid