Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.7 LAdmitted-Finance | +15.00% | ₹28.7 L | L1 | Admitted-Finance |
Updated dates
Tender Value
₹25 L
EMD Value
₹50,000
Closing Date
22 Apr 2026, 6:00 pmClosed
Executive Engineer
UIT, PALI
CONSTRUCTION OF SLUICE GATE AT AKELI FEEDER, JAIPUR BYPASS, PALI
2026_UITPL_551397_1
03/2026-27
Open Tender
Civil Works
45 days
PALI
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Yes
SECRETARY UIT/MD RISL
₹50,000
Yes
24 Apr 2026
11 Apr 2026
23 Apr 2026
11 Apr 2026
22 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Cleaning and removal of earth, silt, sludge, kankar, boulder, building material and garbage in existing nallah/drains including construction of bye pass arrangement to byepass water with 1.5m lift from ground level and lead upto 50 m including foul & saturated condition where pumping out or bailing out of water is required, including shoring, shuttering where required and dewatering. Making access for disposal and dressing disposal side as per the directed of the Engineer.For depth above 1.50 m and upto 3.00 m | - | Cum | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like. | - | Kilo Litre | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (b) Hard/dense soil | - | cum | - | - | BI01010001010000000000000515BI0100001115 |
| 4 | Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto (c) 40 mm | 1 | cum | - | - | BI01010001010000000000000515BI0100001116 |
| 5 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete.(b) In cement sand mortar 1:4 | - | cum | - | - | BI01010001010000000000000515BI0100001117 |
| 6 | Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for SUPER STRUCTURE including curing with all leads of all construction materials including curing etc. complete.(b) In cement sand mortar 1:4 | - | cum | - | - | BI01010001010000000000000515BI0100001118 |
| 7 | Providing and Laying in position of Cement concrete Nominal mix (1:2:4) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto | - | cum | - | - | BI01010001010000000000000515BI0100001119 |
| 8 | Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: (a) 20 mm | 1 | sqm | - | - | BI01010001010000000000000515BI0100001120 |
| 9 | Providing and laying cement concrete coping in (1:2:4) with maximum
size of crusher broken aggregate upto 20 mm including shuttering etc.
with all leads of material complete in all respect in thickness of: 75mm | - | Sqm | - | - | BI01010001010000000000000515BI0100001121 |
| 10 | Design, Drawing, fabrication, supply, erection and commissioning of Trestle assy/ Railing decking/Trash rack/Structural steel hoist bridge/ structural steel hoist supporting structure for monorail / Catwalk bridge for connecting spillway piers for all type of sluice with embedded parts consisting of columns, beams, bracings, stiffeners, ties, chequered plate covering, hand railing, ladder etc., with all other accessories for operating gates, other structure including cost of all materials, machinery, labour, tools and tackles, cutting, aligning, anchoring, welding, finishing, cleaning, applying two coats of zinc chromate red oxide primer and three coats of approved synthetic enamel paint etc., complete as per specifications and approved drawings, including packing & forwarding, transportation charges for structural steel components and other
materials. | - | tonne | - | - | BI01010001010000000000000515BI0100001122 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.50 MB
RTPPAnxureAtoD.pdf
Tender Documents • 0.09 MB
Condition.pdf
Tender Documents • 0.50 MB
AGREEMENT.pdf
Tender Documents • 2.67 MB
BOQ_982583.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid