| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹19.7 LAccepted-AOC | ₹19.7 L | L2 | Accepted-AOC Accepted |
| 2 | L1₹19.7 LRejected-AOC | ₹19.7 L | L1 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Krishnamurthi M L1 | NAVISRI & CO L2 |
|---|---|---|---|---|---|
| 1.001.Construction of Drain From Babu House to Venkatesh House @ Kannandahalli Village H/o Kannandahalli. Estimate Cost (19,88,000.00) | |||||
| 2.00 | Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete. | 330 | Cum | 164.73 ₹54,360.90 | 165.06 ₹54,469.80 |
| 3.00 | Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers. | 49.5 | Cum | 5,640.24 ₹2.8 L | 5,651.53 ₹2.8 L |
| 4.00 | Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers | 111.38 | Cum | 6,930.26 ₹7.7 L | 6,944.13 ₹7.7 L |
| 5.00 | Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge | 594 | Sqm | 547.06 ₹3.2 L | 548.16 ₹3.3 L |
| 6.00 | Salb | 34.8 | s | 1,094.12 ₹38,075.38 | 1,096.31 ₹38,151.59 |
| 7.00 | Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification. | 0.44 | mt | 91,785.01 ₹40,568.97 | 91,968.73 ₹40,650.18 |
| 8.00 | Rein forcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC work. | 6.81 | Cum | 9,358.97 ₹63,734.59 | 9,377.7 ₹63,862.14 |
| 9.00 | Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers. | 148.5 | Sqm | 591.03 ₹87,767.96 | 592.21 ₹87,943.19 |
| 10.00 | Provision for writing Name board | 1 | Nos | 4,496.4 ₹4,496.40 | 4,505.4 ₹4,505.40 |
Tender Value
₹19.9 L
EMD Value
₹20,000
Closing Date
13 Jan 2026, 3:00 pmClosed
Block Development Officer (BP)
BDO Office Mathur
Krishnagiri Dt Mathur Block UGF 2025-26 1 work of Construction of Drain From Babu House to Venkatesh House at Kannandahalli Village in Kannandahalli Panchayat Package No 2025-26 MTR 23
2026_RDTN_639711_1
RocNo2113_2025_A3dt_18_12_2025
Open Tender
Civil Works - Others
180 days
BDO Office Mathur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
Yes
BDO Office Mathur
6 Mar 2026
6 Jan 2026
13 Jan 2026
6 Jan 2026
13 Jan 2026
6 Jan 2026
7 Jan 2026
1.Construction of Drain From Babu House to Venkatesh House @ Kannandahalli Village H/o Kannandahalli. Estimate Cost (19,88,000.00)
Earth work excavation for foundation in all class of soils except hard rock requiring blasting including cost and conveyance of all etc.,complete.
Cement concrete 1:4:8 Using 40mm ISS size Hand Broken granite stone Jelly for Foundation and Flooring including labour charges for mixing concrete watering and laying the concrete in layers.
Plain Cement Concrete 1:2:4 (one cement, two M.Sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.
Rein forcement Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC work.
Plastering with Cement Mortar 1:4 (One Cement and Three M.Sand) 20mm thick mixed with water proofing compound conforming to BIS at 2% by weight of cement used including finsihing, curing, etc., complete in all floors complying with standard specification and as directed by the departmental officers.
Provision for writing Name board
Provision for Photographics charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
PB23.pdf
Tender Documents • 0.60 MB
TB23.pdf
Tender Documents • 0.65 MB
BOQ_765874.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid