Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.0 LAdmitted-Fee/PreQual/Technical/Finance | ₹6.0 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | K.Ravi L1 | Vijayakumar L2 |
|---|---|---|---|---|---|
| 1.00Construction of New Mini CSC PUM School For Boys at Chinnakallupalli in Chinnakallupalli Package 01 Jolarpet Block | |||||
| 2.00 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation | 32.54 | cum | 100 ₹3,254 Lowest | 300 ₹9,762 |
| 3.00 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specification | 0.86 | cum | 1,100.9 ₹946.77 Lowest | 2,000.9 ₹1,720.77 |
| 4.00 | Collection and supply of Gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specification | 2.31 | cum | 222 ₹512.82 Lowest | 300 ₹693 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 6.09 | cum | 5,700.99 ₹34,719.03 Lowest | 6,700.99 ₹40,809.03 |
| 6.00 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 14.87 | cum | 6,000 ₹89,220 Lowest | 6,800.9 ₹1,01,129.38 |
| 7.00 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete | 21 | cum | 300 ₹6,300 Lowest | 400 ₹8,400 |
| 8.00 | Columns | 28.79 | sqm | 1,095 ₹31,525.05 Lowest | 1,095 ₹31,525.05 Lowest |
| 9.00 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | 0.69 | MT | 91,700.2 ₹63,273.14 Lowest | 91,700.2 ₹63,273.14 Lowest |
| 10.00 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. | 7.28 | cum | 9,000 ₹65,520 Lowest | 9,000 ₹65,520 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
20 Aug 2026, 3:00 pmClosed
Block Development Officer (V.P)
Jolarpet Block
Construction of New Mini CSC PUM School For Boys at Chinnakallupalli in Chinnakallupalli Package 01 Jolarpet Block
2026_RDTN_691766_1
B7/1728/2026
Open Tender
Civil Works
Item Rate
180 days
Jolarpet Block
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹12,000
21 Aug 2026
6 Aug 2026
21 Aug 2026
6 Aug 2026
20 Aug 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New Mini CSC PUM School For Boys at Chinnakallupalli in Chinnakallupalli Package 01 Jolarpet Block | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation | 32.54 | cum | - | - |
| 3 | Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specification | 0.86 | cum | - | - |
| 4 | Collection and supply of Gravel and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specification | 2.31 | cum | - | - |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete for foundation | 6.09 | cum | - | - |
| 6 | Brick work in cement mortar 1:5 mix using country bricks including cost and conveyance of all materials to site and all labour charges etc complete. | 14.87 | cum | - | - |
| 7 | Supplying and errection of centering for sides and soffits with M.S.sheet and country wood props including hire charges for materials and all labour charges etc complete | 21 | cum | - | - |
| 8 | Columns | 28.79 | sqm | - | - |
| 9 | Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works | 0.69 | MT | - | - |
| 10 | Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, finishing and curing etc complete. | 7.28 | cum | - | - |
stage.html
html • 0.02 MB
finance_831776.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.16 MB
Tendernotice_2.pdf
PDF • 1.17 MB
BOQ_831776.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].