Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAccepted-Finance VILL DHOLTUKARI P O P S HASNABAD DIST 24 PGS N PIN 743426 | 24 PARGANAS NORTH | WEST BENGAL | 743426 | L1 | Accepted-Finance 1st lowest bidder | |
| 2 | L2₹2.9 L+₹7,662 (2.67%)Rejected-Finance 4 A D N MUKHERJEE ROAD BALLY HOWRAH 711201 | BALLY | HOWRAH | WEST BENGAL | 711201 | L2 | Rejected-Finance 2nd lowest bidder | |
| 3 | L3₹3.0 L+₹13,917 (4.85%)Rejected-Finance 12 3 J P G H SAHA ROAD KOLKATA 700032 | KOLKATA | KOLKATA | WEST BENGAL | 700032 | L3 | Rejected-Finance 3rd lowest bidder |
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
28 Oct 2026, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE(BR V)
22 SURYA SEN STREET KOL-12
REPAIRING OF STONE SETS FOOTPATH AT RAJA WOODMUNT ST AND SURROUNDING AREAS IN WARD NO.-042
2026_KMC_1044593_1
KMC/EE(C)/Br-V/042/07/26-27
Open Tender
CIVIL WORKS
Percentage
60 days
WARD-42
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹5,800
30 Oct 2026
6 Oct 2026
30 Oct 2026
6 Oct 2026
28 Oct 2026
6 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 105 | MTR | 8.17 | ₹857.85 |
| 2 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 105 | MTR | 18.24 | ₹1,915.2 |
| 3 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 39.42 | %M3 | 119.27 | ₹4,701.62 |
| 4 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion | 2.36 | M3 | 4,572 | ₹10,789.92 |
| 5 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 4. Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) (B) Do - by fine sand(5th Corrigenda & addenda dated 16.04.2019) | 25.78 | %M3 | 1,317.14 | ₹33,955.87 |
| 6 | MATERIALS AND LABOUR 1. Building (B) Labour Rates Per Diem : 3)Mazdoor (Male). Note: (I)The above rates of labour are exclusive of 10% contractors profit and 1% Labour welfare cess which would be admissible to the Contractors, but contractual percentage will not be applicable. (II) The workersemployed on high rise building or any structure over 30 ft in height and also workers engaged in Tunnel shall be paid 20% extra wages. | 38 | EA | 245 | ₹9,310 |
| 7 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 222.16 | SQM | 24 | ₹5,331.84 |
| 8 | ORDINARY CEMENT CONCRETE ( MIX 1:1.5:3 ) WITH GRADED STONE CHIPS ( 20 MM NOMINAL SIZE) EXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY, IN GROUND FLOOR AS PER RELEVANT IS CODES (BASED ON PWD SCHEDULE OF RATES, W.E.F. 01.11.2017 WITH CORRIGENDA DT.04.06.2018) | 22.22 | M3 | 6,216 | ₹1,38,114.24 |
| 9 | BUILDING WORKS. (T)MISCELLANEOUS WORKS: A. SPECIAL WORKS. II. COMPOUND DEVELOPMENT: 18) Stone set pavement with the joints set close in cement mortar (1:6) excluding the cost of stone sets but including the cost of carriage thereof within a lead of 150 m. (i) When laid with a cushion of sand below (including cost thereof). (a) 100 mm thick pavement | 222.13 | SQM | 59 | ₹13,105.67 |
| 10 | Raising manhole cover and frame with CBW (1:4), 250mm thick up to 100mm high with 20mm thick sand and cement plaster including finishing with neat cement after cutting the asphaltum pavement and taking out and re-fixing the existing manhole cover and frame with cement concrete (1:1.5:3) with stone chips all round the frame surface including removal of surplus spoils. | 9 | EA | 1,793.55 | ₹16,141.95 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.83 MB
Tendernotice_4.pdf
PDF • 0.82 MB
BOQ_2561841.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .