| 1 | L1₹19.8 LAccepted-Finance 1897 TS NO 6 5 VELLIANGKATTU RAMASAMY GOWNDER LAY OUT 60 FEET ROAD TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | L1 | Accepted-Finance Low | |
| 2 | L2₹21.3 L+₹1.5 L (7.63%)Accepted-Finance | L2 | Accepted-Finance High |
| Sl No | Description | Qty | Unit | K MAHADEVAN | SENTHILKUMAR |
|---|---|---|---|---|---|
| 1.00 | Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20A | 52.43 | Cum | 14,418.25 ₹17,013.54 | 13,736.66 ₹16,209.26 Lowest |
| 2.00 | Supplying and Filling foundation and basement with M sand in layers not more than 15cm Thick well ramed, watered and compacted Complete complying with stanard specification. | 17.48 | Cum | 34,173.4 ₹40,324.61 | 30,677.4 ₹36,199.33 Lowest |
| 3.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., | 17.48 | Cum | 1,02,258 ₹1,20,664.44 | 95,877.8 ₹1,13,135.8 Lowest |
| 4.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 136.47 | Cum | 3,75,292.5 ₹4,42,845.15 | 3,44,040.87 ₹4,05,968.23 Lowest |
| 5.00 | Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete | 39.01 | Cum | 2,82,822.5 ₹3,33,730.55 | 2,68,856.92 ₹3,17,251.17 Lowest |
| 6.00 | Supply & Erecting centring for Sides & Soffits of CC Pavement Including cost & conveyance of all Materials and all Labour charges In Sqm | 339.24 | Sqm | 2,03,544 ₹2,40,181.92 | 1,85,564.28 ₹2,18,965.85 Lowest |
| 7.00 | Providing and laying of Interlocking concrete Block (Surface Textured ) Pavements having thickness 80mm and compacted over a thin bedding sand layer of 30mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads -2014 and Technical specification clause 1504, including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete. | 909.78 | Sqm | 7,73,313 ₹9,12,509.34 | 7,20,545.76 ₹8,50,244 Lowest |
| 8.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS | 26.21 | Cum | 17,036.5 ₹20,103.07 | 15,726 ₹18,556.68 Lowest |
Tender Value
₹20 L
Closing Date
15 Oct 2025, 3:00 pmClosed
BDO BP
KNR Union at Padappai
Providing Paver Block Pavement to Periyar Colony Nehru Street and Periyar Nagar 8th Cross Street at Nandambakkam Panchayat, Kundrathur Panchayat Union, Kancheepuram District Under 15th CFC DP Scheme Funds of the Year 2025-26
2025_RDTN_612242_1
DRDAKPM No. 330 / 2025 / DP1 / KNR 2 / Dated 22.08.2025
Open Tender
Civil Works - Others
Works
120 days
Nandambakkam
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
16 Oct 2025
8 Oct 2025
15 Oct 2025
8 Oct 2025
15 Oct 2025
8 Oct 2025
Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales,murram, gravel, stoney earth and earth mixed with small size boulders SS.20A
Supplying and Filling foundation and basement with M sand in layers not more than 15cm Thick well ramed, watered and compacted Complete complying with stanard specification.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick.,
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Cement concrete 1 : 2 : 4 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete
Supply & Erecting centring for Sides & Soffits of CC Pavement Including cost & conveyance of all Materials and all Labour charges In Sqm
Providing and laying of Interlocking concrete Block (Surface Textured ) Pavements having thickness 80mm and compacted over a thin bedding sand layer of 30mm thickness and joints shall be filled by fine sand of specified grading as per table 1500.6 of Specification of Rural roads -2014 and Technical specification clause 1504, including cost and conveyance of all materials and labour charges for laying the Paver Block compacting, and curing etc.complete.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_731569.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .