Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.9 LAccepted-AOC | ₹25.9 L Quoted ₹25.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹25.9 L+₹6,063.33 (0.23%)Rejected-Finance | ₹25.9 L+₹6,063.33 (0.23%) | L2 | Rejected-Finance HIGH RATE |
Tender Value
₹30.6 L
EMD Value
₹61,000
Closing Date
25 May 2026, 12:00 pmClosed
EE RED BALRAMPUR
EE RED BALRAMPUR
Interlocking work from Mankapur Road of Gram Panchayat- Banghusra from Aajaram Pandav house to Sahajram Verma house
2026_REDUP_1135619_18
951/NOTICE/2025-26 DATE 07-03-2026
Open Tender
Civil Works
Percentage
180 days
EE RED BALRAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹860
Yes
₹61,000
Yes
14 Sept 2026
5 May 2026
25 May 2026
5 May 2026
25 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil in foundation as per SI no.251 | 62.43 | Cum | 118.75 | ₹7,413.56 |
| 2 | pcc in (1:6:12) with 40mm brick ballast ,f sand &cement as par si no | 2.13 | CUM | 3,752.5 | ₹7,992.83 |
| 3 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. | 223.66 | Cum | 4,499.87 | ₹10,06,440.92 |
| 4 | Class M-150 Brick work in Cement and Coarse sand Morter In 1:4 in Foundation Including Supply Of All Material Up to Proper Completion Of works As per SI.No. 305 | 70.89 | Cum | 5,320 | ₹3,77,134.8 |
| 5 | Providing and laying factory made chamfered edge Cement Concretepaver blocks in footpath, parks, lawns, drive ways or light trafficparking etc, of required strength, thickness & size/ shape, made bytable vibratory method using PU mould, laid in required colour &pattern over 50mm thick compacted bed of sand, compacting andproper embedding/laying of inter locking paver blocks into the sandbedding layer through vibratory compaction by using plate vibrator, filling | 1,333.5 | SQM | 812.25 | ₹10,83,135.38 |
| 6 | struck pointing in (1:2) with cement &f sand sand mortor incliding all material si no 574 | 14.62 | SQM | 142.5 | ₹2,083.35 |
| 7 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone
aggregate 20 mm nominal size SOR 279 B | 6.04 | Cum | 8,027.5 | ₹48,486.1 |
| 8 | finishing wall with WATER PROOF CEMENTSI NO.660 | 14.62 | SQM | 53.2 | ₹777.78 |
| 9 | supply &laying of 600mm NP3 hume pipe | 7.5 | RM | 2,103.3 | ₹15,774.75 |
| 10 | E/W in Filling in embankment in ordinary soil.e As si.no.253+4KMExtra cartage | 353.93 | Cum | 104.5 | ₹36,985.69 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.18 MB
BOQ_2139462.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .