| 1 | L1₹40.9 LAccepted-Finance | ₹40.9 L | L1 | Accepted-Finance Lowest |
| 2 | L2₹42.4 L+₹1.5 L (3.63%)Rejected-Finance | ₹42.4 L+₹1.5 L (3.63%) | L2 | Rejected-Finance Not Lowest |
| 3 | L3₹44.0 L+₹3.1 L (7.49%)Rejected-Finance | ₹44.0 L+₹3.1 L (7.49%) | L3 | Rejected-Finance Not Lowest |
| 4 | L4₹46.4 L+₹5.5 L (13.5%)Rejected-Finance | ₹46.4 L+₹5.5 L (13.5%) | L4 | Rejected-Finance Not Lowest |
| 5 | L5₹46.9 L+₹6.0 L (14.6%)Rejected-Finance HOUSE NO 2 4 136 LINGREDDY MANSION BLOCK NO IV OPP HANUMAN TEMPLE TADBUND SECUNDERABAD 500009 | SECUNDERABAD | HYDERABAD | TELANGANA | 500009 | ₹46.9 L+₹6.0 L (14.6%) | L5 | Rejected-Finance Not Lowest |
| Sl No | Description | Qty | Unit | S.S.ENGINEERING CORPORATION L2 | CHITRA ENGINEERING CORPORATION L1 | omsai thermax engineers L5 | SUN LIGHT HOUSE L6 | UNITY ENGINEERING TRADERS L3 | Indu Electricals L8 | SRI SAI ENTERPRISES L4 | vvcenterprises L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Leak testing of the AC plant with nitrogen (N2) pressure after evacuating of the existing gas from the system into empty cylinder by separating the entire system, like compressors, evaporator, condensers, cooling coil and refrigerant lines and rectifying the leakage including cutting welding brazing etc and replacing of 'O' ring, washers, gaskets etc flushing out the Nitrogen and vaccumising, recharging the taken out refrigerant gas including testing complete all as directed to AC plants of capacity 2 x 11 TR AC plant at CAD CAM | 2 | Each Job | 4,150 ₹8,300 | 4,000 ₹8,000 Lowest | 4,750 ₹9,500 | 4,900 ₹9,800 | 4,250 ₹8,500 | 5,000 ₹10,000 | 4,515 ₹9,030 | 5,000 ₹10,000 |
| 1.01 | All as per item No. 1.00 here-in-before but of capacity 3 x 11 TR Central AC plant at Creep Lab | 2 | Each Job | 4,250 ₹8,500 | 4,000 ₹8,000 Lowest | 5,000 ₹10,000 | 5,150 ₹10,300 | 4,300 ₹8,600 | 5,000 ₹10,000 | 4,755 ₹9,510 | 5,250 ₹10,500 |
| 1.02 | All as per item No. 1.00 here-in-before but of capacity 3 x 30 TR AC plant at ETC | 2 | Each Job | 5,750 ₹11,500 | 5,500 ₹11,000 Lowest | 7,000 ₹14,000 | 7,250 ₹14,500 | 5,900 ₹11,800 | 7,200 ₹14,400 | 6,125 ₹12,250 | 7,500 ₹15,000 |
| 1.03 | All as per item No. 1.00 here-in-before but of capacity 3 x 52 TR AC plant at AMG | 2 | Each Job | 6,500 ₹13,000 | 6,000 ₹12,000 Lowest | 7,500 ₹15,000 | 7,650 ₹15,300 | 6,600 ₹13,200 | 7,300 ₹14,600 | 6,755 ₹13,510 | 7,700 ₹15,400 |
| 1.04 | All as per item No. 1.00 here-in-before but of capacity 3 x 93TR AC plant at TIC.Note :- One condenser/Chiller unit shall be measured as one job for the purpose of payment. | 2 | Each Job | 7,250 ₹14,500 | 7,000 ₹14,000 Lowest | 8,500 ₹17,000 | 8,750 ₹17,500 | 8,000 ₹16,000 | 9,200 ₹18,400 | 8,255 ₹16,510 | 9,000 ₹18,000 |
| 2.00 | Supply only refrigerant gas R-22 complete all as directed | 280 | Kg | 825 ₹2,31,000 | 800 ₹2,24,000 Lowest | 875 ₹2,45,000 | 890 ₹2,49,200 | 850 ₹2,38,000 | 900 ₹2,52,000 | 866 ₹2,42,480 | 900 ₹2,52,000 |
| 2.01 | Supply only refrigerant gas R-407c complete all as directed. | 280 | Kg | 825 ₹2,31,000 | 800 ₹2,24,000 Lowest | 875 ₹2,45,000 | 890 ₹2,49,200 | 850 ₹2,38,000 | 920 ₹2,57,600 | 869 ₹2,43,320 | 900 ₹2,52,000 |
| 2.02 | Supply only refrigerant gas R-410 complete all as directed. | 70 | Kg | 825 ₹57,750 | 800 ₹56,000 Lowest | 875 ₹61,250 | 890 ₹62,300 | 850 ₹59,500 | 915 ₹64,050 | 878 ₹61,460 | 950 ₹66,500 |
| 2.03 | Supply only refrigerant gas R-134a complete all as directed.Make Srl No 2 to 2.03 Mefron/Fluron/Freon | 180 | Kg | 875 ₹1,57,500 | 850 ₹1,53,000 Lowest | 950 ₹1,71,000 | 968 ₹1,74,240 | 900 ₹1,62,000 | 965 ₹1,73,700 | 955 ₹1,71,900 | 970 ₹1,74,600 |
| 2.04 | Supply and filling/topping up/ charging of Refrigerent gas R-32 for Package VRF type ACs complete all as directed. | 90 | KG | 965 ₹86,850 | 950 ₹85,500 Lowest | 1,025 ₹92,250 | 1,035 ₹93,150 | 1,000 ₹90,000 | 1,000 ₹90,000 | 1,015 ₹91,350 | 1,050 ₹94,500 |
Tender Value
₹48 L
EMD Value
₹96,000
Closing Date
8 Aug 2026, 6:00 pmClosed
GE I R and D Kanchanbagh
GE I R and D Kanchanbagh Kanchanbagh Post Hyderabad 500058
REPAIR/MAINTENANCE OF CENTRAL/PACKAGE TYPE AC PLANTS AND SUMMER APPLIANCES AT AMCC BLDG, DMRL/ATC AREA UNDER GE (I) RND KANCHANBAGH, HYDERABAD
2026_MES_779550_1
8226
Open Tender
Civil Works
Item Rate
270 days
GE I R and D Kanchanbagh
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE I R and D Kanchanbagh
₹96,000
Yes
22 Aug 2026
18 Jul 2026
11 Aug 2026
18 Jul 2026
8 Aug 2026
1 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Leak testing of the AC plant with nitrogen (N2) pressure after evacuating of the existing gas from the system into empty cylinder by separating the entire system, like compressors, evaporator, condensers, cooling coil and refrigerant lines and rectifying the leakage including cutting welding brazing etc and replacing of 'O' ring, washers, gaskets etc flushing out the Nitrogen and vaccumising, recharging the taken out refrigerant gas including testing complete all as directed to AC plants of capacity 2 x 11 TR AC plant at CAD CAM | 2 | Each Job | - | - |
| 1.01 | All as per item No. 1.00 here-in-before but of capacity 3 x 11 TR Central AC plant at Creep Lab | 2 | Each Job | - | - |
| 1.02 | All as per item No. 1.00 here-in-before but of capacity 3 x 30 TR AC plant at ETC | 2 | Each Job | - | - |
| 1.03 | All as per item No. 1.00 here-in-before but of capacity 3 x 52 TR AC plant at AMG | 2 | Each Job | - | - |
| 1.04 | All as per item No. 1.00 here-in-before but of capacity 3 x 93TR AC plant at TIC.Note :- One condenser/Chiller unit shall be measured as one job for the purpose of payment. | 2 | Each Job | - | - |
| 2 | Supply only refrigerant gas R-22 complete all as directed | 280 | Kg | - | - |
| 2.01 | Supply only refrigerant gas R-407c complete all as directed. | 280 | Kg | - | - |
| 2.02 | Supply only refrigerant gas R-410 complete all as directed. | 70 | Kg | - | - |
| 2.03 | Supply only refrigerant gas R-134a complete all as directed.Make Srl No 2 to 2.03 Mefron/Fluron/Freon | 180 | Kg | - | - |
| 2.04 | Supply and filling/topping up/ charging of Refrigerent gas R-32 for Package VRF type ACs complete all as directed. | 90 | KG | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_873153.xls
BOQ • 0.37 MB
Tenderdocument.pdf
Tender Documents • 1.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .