Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance S O TSERING WANGDUS R O CHARASA NUBRA | LEH LADAKH | LADAKH | 194101 | L1 | Accepted-Finance Admitted | |
| 2 | L2₹2.9 L+₹32,437.50 (12.5%)Accepted-Finance | L2 | Accepted-Finance Admitted | |
| 3 | L3₹3.0 L+₹38,822.60 (15.0%)Accepted-Finance | L3 | Accepted-Finance Admitted |
Tender Value
Refer Docs
EMD Value
₹6,300
Closing Date
7 Oct 2022, 4:00 pmClosed
Divisional Forest Officer, Leh
Divisional Forest Office, Forest Division Leh Fort Road UT of Ladakh
Construction of retaining wall and ground leveling at Panamik B.O/ Guard Hut of Nubra Forest Range for the year 2022-23 (Construction of B.O/Guard Hut, SDP Ongoing Scheme) size 1 (16.00x12.00)
2022_FEE_7905_1
E-Tender (50) of FDL 2022-23
Open Tender
Civil Works - Others
Works
60 days
Nubra
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Divisional Forest Officer, Leh
₹6,300
8 Feb 2023
1 Oct 2022
8 Oct 2022
1 Oct 2022
7 Oct 2022
1 Oct 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)over areas (exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m All kind of soil area=2x120.00x30.00x(0.6+2.00)/2+9000.00cfts or 254.7 cum
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with :Cement mortar 1:6 (1 cement : 6 coarse sand) 2x120.00x1.6x2.3=810.00cfts 2x30.00x1.6x2.3/2=101.25 cfts T=911.25 or 25.78 cum
providing and laying in position cement concrete of specified grade including of centering and shuttering all work up to plinth level 1:3:6(1 cement : 3 fine sand : 6 graded stone aggregate 20 mm nominal size) 1. Crushed 4x120.00x1.6x0.3=180.00cfts 4x30x1.6x0.3=45.00cfts Total=225.00cfts or 6.36 cum
Filling available exacavted earth (excluding rock) in trenches, plinth, sides of foundations etc in layers not exceeding 20cm in depth, consildating each deposited layer by ramming and watering, lead up to 1.5 mt Area=2x120.00x30.00x0.9=5400.00cfts or 152.82 cum
Carriage of materials from various sources to site of work by M.T includimg loading,un loading and stacking Cement 150kms
Carriage of materials from various sources to site of work by M.T includimg loading,un loading and stacking sand and stone aggregate 05kms
Carriage of materials from various sources to site of work by M.T includimg loading,un loading and stacking stone 15kms
tsering motup
M/S STANZIN RABSTAN
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .