| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹2.0 LAdmitted-Finance | L2 | Admitted-Finance | |
| 2 | L3₹2.1 LAdmitted-Finance | L3 | Admitted-Finance | |
| 3 | L4₹2.2 LAdmitted-Finance | L4 | Admitted-Finance | |
| 4 | L5₹2.3 LAdmitted-Finance | L5 | Admitted-Finance | |
| 5 | L6₹2.4 LAdmitted-Finance | L6 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MEHROZA BANOO L4 | MOhd Rafi L5 | Mansoor Ahmad L2 | SAFEENA BEGUM L6 | Irshad Ahmed L3 | IRSHAD AHMED L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil. | 203 | Cum | 200 ₹40,600 | 100 ₹20,300 Lowest | 170.7 ₹34,652.1 | 323.36 ₹65,641.1 | 100 ₹20,300 Lowest | 180 ₹36,540 |
| 2.00 | Dry random rubble masonry with hard stone in foundation and plinth With bond stone. | 18 | Cum | 600 ₹10,800 | 1,000 ₹18,000 | 680.7 ₹12,252.6 | 2,100 ₹37,800 | 150 ₹2,700 Lowest | 400 ₹7,200 |
| 3.00 | Dry stone pitching, 225mm thick, including cost of stones and preparation of surface | 131.97 | Sqm | 600 ₹79,182 | 110 ₹14,516.7 Lowest | 170.7 ₹22,527.28 | 450 ₹59,386.5 | 120 ₹15,836.4 | 150 ₹19,795.5 |
| 4.00 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil. | 1,301.12 | Sqm | 40 ₹52,044.8 | 17 ₹22,119.04 Lowest | 55.7 ₹72,472.38 | 20 ₹26,022.4 | 100 ₹1,30,112 | 60 ₹78,067.2 |
| 5.00 | Extraction , transportation and Labour of Wood for making Wooden Foot Bridge of Span 20 ft complete job as per directed by the site incharge 71.1123 Cft a) Engage 4 Carpenter for 5 days for making 2 foot bridge of Span 30 ft | 20 | No | 50 ₹1,000 Lowest | 650 ₹13,000 | 1,850.7 ₹37,014 | 700 ₹14,000 | 600 ₹12,000 | 950 ₹19,000 |
| 6.00 | b) Engage 4 Labour for 5 days for making 2 foot bridge of Span 30 ft | 20 | No | 50 ₹1,000 Lowest | 650 ₹13,000 | 210.7 ₹4,214 | 400 ₹8,000 | 600 ₹12,000 | 200 ₹4,000 |
| 7.00 | Providing and fixing of Nails | 6 | Kg | 100 ₹600 | 1,450 ₹8,700 | 90.7 ₹544.2 Lowest | 100 ₹600 | 150 ₹900 | 180 ₹1,080 |
| 8.00 | Extraction , transportation and Labour of Wood for making & Fixing of Wooden Sign boards 1'x1.5' on different areas including painting and writing | 8 | No | 400 ₹3,200 Lowest | 1,150 ₹9,200 | 680.7 ₹5,445.6 | 600 ₹4,800 | 600 ₹4,800 | 600 ₹4,800 |
| 9.00 | Extraction , transportation and Labur of Wood for making & Fixing of Wooden Sign boards 3'x2' on different areas including painting and writingas per desired by site incharge | 8 | No | 600 ₹4,800 | 1,400 ₹11,200 | 203.7 ₹1,629.6 | 700 ₹5,600 | 600 ₹4,800 | 180 ₹1,440 Lowest |
| 10.00 | Carriage of materials from source to site of work by M.T. A) Stone av. HL 400 mtr | 47.7 | Cum | 500 ₹23,850 | 2,000 ₹95,400 | 190.7 ₹9,096.39 | 300 ₹14,310 | 80 ₹3,816 Lowest | 400 ₹19,080 |
Tender Value
₹3.0 L
EMD Value
₹8,858
Closing Date
30 Sept 2025, 4:00 pmClosed
Wildlife Warden Chenab Divisio,Kishtwar.
Kishtwar
Maintenance of Inspection path Path Clearing Widening Surface Preperation Drainage works Safety Barriers Signage Installation at Nanth Under Mitigation Plan of KHANP Wildlife Chenab Division Kishtwar for the Year 2025 26
2025_FD_289402_1
NIT 13 of 2025-26 Inspection path Nanth
Open Tender
Civil Works
Item Wise
60 days
Nanth, Dachhan
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Wildlife Warden Chenab Divisio,Kishtwar.
₹8,858
6 Oct 2025
23 Sept 2025
1 Oct 2025
23 Sept 2025
30 Sept 2025
23 Sept 2025
Amount
Excavation work in excavation by manual means for foundations, drains, pipes, cables etc. (not exceeding 1.5m in width) and for shafts wells cesspits and the like not exceeding 10 sqm on plan, depth upto 1.5 M including the disposal of excavated earth upto 1 M from the cutting edge, disposed earth to be levelled and neatly dressed in all kinds of soil.
Dry random rubble masonry with hard stone in foundation and plinth With bond stone.
Dry stone pitching, 225mm thick, including cost of stones and preparation of surface
Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50 m and lift upto1.5 m in -All kinds of soil.
Extraction , transportation and Labour of Wood for making Wooden Foot Bridge of Span 20 ft complete job as per directed by the site incharge 71.1123 Cft a) Engage 4 Carpenter for 5 days for making 2 foot bridge of Span 30 ft
b) Engage 4 Labour for 5 days for making 2 foot bridge of Span 30 ft
Providing and fixing of Nails
Extraction , transportation and Labour of Wood for making & Fixing of Wooden Sign boards 1'x1.5' on different areas including painting and writing
Extraction , transportation and Labur of Wood for making & Fixing of Wooden Sign boards 3'x2' on different areas including painting and writingas per desired by site incharge
Carriage of materials from source to site of work by M.T. A) Stone av. HL 400 mtr
Mansoor Ahmad (BID ID -2553980)
Irshad Ahmed (BID ID -2550861)
MEHROZA BANOO (BID ID -2555629)
MOhd Rafi (BID ID -2559058)
SAFEENA BEGUM (BID ID -2551391)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .