Loading…
Loading…
| # | Company | Offered Item |
|---|---|---|
| 1 | Comprehensive Running and maintenance of sewage treatment plant 200 KLD capacity with MBBR/FBBR system during 2022-2024 for IMU HQ Uthandi Chennai. | Comprehensive Running and maintenance of sewage treatment plant 200 KLD capacity with MBBR/FBBR system during 2022-2024 for IMU HQ Uthandi Chennai. |
| 2 | Comprehensive Running and maintenance of sewage treatment plant 200 KLD capacity with MBBR/FBBR system during 2022-2024 for IMU HQ Uthandi Chennai. | Comprehensive Running and maintenance of sewage treatment plant 200 KLD capacity with MBBR/FBBR system during 2022-2024 for IMU HQ Uthandi Chennai. |
| 3 | Comprehensive Running and maintenance of sewage treatment plant 200 KLD capacity with MBBR/FBBR system during 2022-2024 for IMU HQ Uthandi Chennai. | Comprehensive Running and maintenance of sewage treatment plant 200 KLD capacity with MBBR/FBBR system during 2022-2024 for IMU HQ Uthandi Chennai. |
| Sl No | Description | Qty | Unit | Eco Protection Engineers Pvt Ltd | Enviro Chem Engineers and Consultants India Pvt Ltd | Global Tech Services |
|---|---|---|---|---|---|---|
| - | Comprehensive Running and maintenance of sewage treament two lakh litres capacity (Extended aeration/activated sludge process) for 24.00 hrs per day by engaging qualified plant operator in 3 shifts (each 8 hours per day) using chemicals like Sodium hypocholorite, Bioculture,Consumables required for maintenance as directed by the Engineer-in-Charge.The treated sewage shall have the following standards: BOD : Lessthan20mg/lit
COD :Lessthan100mg/lit
Suspended Solids :Lessthan100mg/lit
PH : 6.50-7.50
The treated effluent shall be within BIS limits and shall be reused for horticultural purposes/flushing water or recharged to ground water after treatment and chlorination. Frequency of testing shall be at an equal intervals of 2 months.(The quoted rate is inclusive of electrical and mechanical repairs, cost of all materials including spare parts, replacement, winding etc., to sewage pumps, motors, airetors, panel board, cable, replacement of filter media etc. ) | - | Per month | 0 - | 0 - | 0 - |
Tender Value
₹23.5 L
EMD Value
₹47,011
Closing Date
6 Apr 2022, 11:00 amClosed
EE-CHENNAI-II
SHASTRI BHAWAN CHENNAI
Comprehensive Running and maintenance of sewage treatment plant 200 KLD capacity with MBBR/FBBR system during 2022-2024 for IMU HQ Uthandi Chennai.
2957
47/EE/ C2D/2021-2022/CHENNAI
OPEN
Repair and Maintenance
NCB
24 months
Chennai, Tamil Nadu
8 documents required · 8 mandatory
₹47,011
Not Applicable
6 Apr 2022
29 Mar 2022
6 Apr 2022
6 Apr 2022
31 Mar 2022
stage.html
html • 0.08 MB
boq_comp_chart.xls
xls
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Listofapprovedmaterials2020.pdf
document • 17.90 MB
Tenderdocument47IMUSTP.pdf
document • 1.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .