Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹33.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹35.4 L+₹1.9 L (5.62%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹38.5 L+₹5.0 L (15.0%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹40.3 L+₹6.8 L (20.3%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹40.7 L+₹7.2 L (21.5%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹41.4 L
EMD Value
₹82,800
Closing Date
6 Nov 2026, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer RnB DIVISION SUMBAL
Sumbal Sonawari
Construction/Development of Ziyarat Fakir-lassa-Baba Trehgam.
2026_PWDJK_329937_1
NIT NO 86 OF 2026-27/SUMBAL DIVISION
Open Tender
Civil Works
Percentage
90 days
Sumbal Sonawari
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Executive Engineer RnB Division Sumbal
₹82,800
7 Nov 2026
31 Oct 2026
7 Nov 2026
31 Oct 2026
6 Nov 2026
31 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Lavatory Block:
Earth work in excavation over areas (Exceeding 30cm in depth 1.5m in width) including disposal of excavated earth to be leveled and neatly dressed up to a lead of 50m in all kinds of soil Including dewatering complete job. | 68.78 | Cum | 256.85 | ₹17,666.14 |
| 2 | Providing and laying of soling stone size over on level (hand packed) watering ramming complete under raft and flooring.. | 17.1 | Cum | 1,000 | ₹17,100 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level. M-7.5 1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate) 40mm nominal size crushed in foundation and under flooring. | 5.74 | Cum | 5,202.9 | ₹29,864.65 |
| 4 | Providing and laying in position specified grade of Reinforced cement concrete M15 (1 : 2 : 4) excluding the cost of centering, shuttering, finishing and reinforcement.All works upto plinth level including carriage complete. | 6.88 | Cum | 7,104.35 | ₹48,877.93 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – all works upto plinth level: M-15 1:2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20 mm nominal size crushed ) | 27.26 | Cum | 6,591.25 | ₹1,79,677.48 |
| 6 | Brick work with common burnt clay (non modular) bricks class designation 75 in superstructure above plinth level upto floor five level including curing in 1:6 cement mortar | 40.44 | Cum | 7,571.55 | ₹3,06,193.48 |
| 7 | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 31.14 | Cum | 1,455.65 | ₹45,328.94 |
| 8 | Providing and fixing of wood work in frames of doors & windows, clestory windows & other frames, wrought framed & fixed in position with hold fast lugs or with dash fasteners of required dia & length of Imported wood. | 0.92 | Cum | 58,000 | ₹53,360 |
| 9 | Providing and fixing panelled or panelled and glazed shutters for doors, windows and clerestory windows, fixing with butt hinges of required size with necessary screws, excluding panelling or panelling and glazing, all complete as per direction of Engineer-in-charge. Foreign wood( 30 mm thick sqm) | 30.12 | Sqm | 2,400 | ₹72,288 |
| 10 | Providing and fixing panelling or panelling and glazing in panelled or panelled and glazed shutters for doors, windows and clerestory windows (Area of opening for panel inserts excluding portion inside grooves or rebates to be measured). Panelling for panelled or panelled and glazed shutters 25 mm to 40 mm thick. Foreign wood | 18.12 | Sqm | 1,900 | ₹34,428 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.14 MB
BOQ_1118586.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .