| 1 | L1₹4.9 LAccepted-AOC NEAR CHOUPAL VILLAGE KONDAL HATHIN PALWAL 121103 | HATHIN | PALWAL | HARYANA | 121103 | ₹4.9 L | L1 | Accepted-AOC AOC |
| 2 | L2₹5.1 LRejected-Finance | ₹5.1 L | L2 | Rejected-Finance Reject due to higher rate quoted |
| 3 | L3₹5.4 LRejected-Finance HNO 2240 HUDA SECTOR 2 PALWAL HARYANA 121102 | PALWAL | PALWAL | HARYANA | 121102 | ₹5.4 L | L3 | Rejected-Finance Reject due to higher rate quoted |
| Sl No | Description | Qty | Unit | The Swami Dayal Baba Coop L and C Society Ltd L2 | THE SOMSHARADARYA COOP L AND C SOCIETY LTD L1 | The VIRAJ COOPERATIVE LABOUR AND CONSTRUCTION SOCIETY LTD PALWAL L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply and fixing of good Earth (including royalty) by mechanical transport up to a lead cum of taken also including ramming and watering of the earth in layers etc. Complete | 93.84 | cum | 504 ₹47,295.36 | 504 ₹47,295.36 | 504 ₹47,295.36 |
Tender Value
₹4.9 L
EMD Value
₹10,000
Closing Date
26 Feb 2026, 5:00 pmClosed
SATPAL
Municipal Council Hodal
Repairs and Maintenance of Road/Drain in ward no. 10 MC Hodal
2026_HRY_504089_1
20262BAEEBA4 8359 4530 BF28 6F6C24D7414C329ULB
Open Tender
Civil Works
165 days
Hodel
2 documents required · 2 mandatory
₹1,000
₹10,000
Yes
16 Mar 2026
20 Feb 2026
27 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
Supply and fixing of good Earth (including royalty) by mechanical transport up to a lead cum of taken also including ramming and watering of the earth in layers etc. Complete
Percentage BoQ
BoQ_Ver3.0
Bidder Name :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[17.15.1]Granular Sub-Base with Coarse Graded Material - Grading-I or II or III (Table:- 400-2) Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.of MORTandH specifications 1. Grading I material [Through Rate]
[17.22.1]Water Bound Macadam Gr I 1. Water Bound Macadam Grading I (without screenings for low volume roads (undesignated) Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density complete as per technical clause 404 of MORT&H specifications [Through Rate]
[17.5.3]Compacting Original Ground 3. Compaction of Earthwork Compaction of & preparation of sub grade including loosening, levelling of earth 225 mm thick top layer, rough dressing of soil, final dressing of earth to give level, camber, watering, rolling with road roller, compacting the bed to achieve minimum dry density as given in the Table 3000-2 as per technical clause 305 of MORT&H specifications [Through Rate]
[17.69.2]Interlocking Concrete Block Pavement 2. Providing and Laying 80 mm thick ISI marked Interlocking Paver Blocks conforming to IS 15658:2006/IRC SP 63: 2004 of all shapes and colours in design mix cement M 40 over the bed of 30 mm thick fine sand complete in all respect. [Through Rate]
[21.53]Constructing standard drain type I drain moulded and laid over lime concrete foundation rendered and finished smooth with 6 mm thick rendering concrete to be of 1.3.6 parts by volume of cement sand stone bajri and rendering to be 1:1 cement sand mortar [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.33.3]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 3. Cold twisted bars [Through Rate]
[7.21.2]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement mortar 1:6 (1 cement : 6 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_582787.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid