| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.8 CrAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹27.0 Cr+₹38.4 L (1.44%)Rejected-Finance | L2 | Rejected-Finance Among the three bidders, this bidder has quoted the Highest Value. | |
| 3 | L3₹27.3 Cr+₹62.2 L (2.34%)Rejected-Finance | L3 | Rejected-Finance Among the three bidders, this bidder has quoted the Highest Value. |
| Sl No | Description | Qty | Unit | A MURUGAN L2 | M/s.PPS Construction L1 | K Logamalaik Kannan L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all classes of soils and depositing on bank, with all leads and lifts as per SS20B, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF ABUTMENT& PIERS as per Section 300 of MORT&H Specifications(Fifth Revision). | 4,697.98 | Cubic meter | 502 ₹23,58,385.96 | 491 ₹23,06,708.18 Lowest | 506 ₹23,77,177.88 |
| 2.00Earth work excavation in rock not requiring blasting (SDR, Kankar and Soft Rock) and depositing on bank, with all leads and lifts, including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF ABUTMENTS AND PIERS as per Section 300 of MORT&H Specifications(Fifth Revision). | ||||||
| 2.01 | Depth 0.0 -2.0m | 1,107.85 | Cubic meter | 596 ₹6,60,278.6 | 588 ₹6,51,415.8 Lowest | 602 ₹6,66,925.7 |
| 2.02 | Depth 2.0 -3.0m | 366.76 | Cubic meter | 608 ₹2,22,990.08 | 600 ₹2,20,056 Lowest | 614 ₹2,25,190.64 |
| 2.03 | Depth 3.0 -4.0m | 123.31 | Cubic meter | 620 ₹76,452.2 | 612 ₹75,465.72 Lowest | 626 ₹77,192.06 |
| 2.04 | Depth 4.0 -5.0m | 73.44 | Cubic meter | 632 ₹46,414.08 | 623 ₹45,753.12 Lowest | 638 ₹46,854.72 |
| 2.05 | Depth 5.0 -6.0m | 41.13 | Cubic meter | 644 ₹26,487.72 | 635 ₹26,117.55 Lowest | 650 ₹26,734.5 |
| 3.00 | Plain Cement Concrete of Grade M-10, Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELING COURSE UNDER FOOTINGS | 122.65 | Cubic meter | 6,092 ₹7,47,183.8 | 6,006 ₹7,36,635.9 Lowest | 6,145 ₹7,53,684.25 |
| 4.00 | Cement Concrete M15, (Nominal mix 1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying,compacting, curing concrete hire charges for Tools and Plants including all other incidental charges, such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for Filling the trenches around footing as per cl.707.4.6 of IRC 78:2014 | 1,095.58 | Cubic meter | 6,858 ₹75,13,487.64 | 6,761 ₹74,07,216.38 Lowest | 6,918 ₹75,79,222.44 |
| 5.00 | Vibrated reinforced cement concrete M35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tool and plants including all other incidental charges etc., complete for TWIN COLUMN PIERS AND ABUTMENT- 1500mm dia as per Sections 1500,1700&2200 of MORT&H Specifications(Fifth Revision)-Below sill level | 719.99 | Cubic meter | 11,235 ₹80,89,087.65 | 11,077 ₹79,75,329.23 Lowest | 11,334 ₹81,60,366.66 |
Tender Value
₹23.8 Cr
EMD Value
₹12.1 L
Closing Date
25 Nov 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, WRD.,
O/o Superintending Engineer, WRD., Palar Basin Circle, Chennai.
Construction of High Level Bridge across Adyar River to connect the OTA Campus Situated on both side of the River in Manapakkam Village In Alandur Taluk of Chennai District.
2024_WRD_496430_1
eTender Notice No.03 PBC/2024 25/Dt.09.10.2024
Open Tender
Civil Works - Bridges
Lump-sum
547 days
Alandur
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹12.1 L
25 Mar 2025
25 Oct 2024
26 Nov 2024
25 Oct 2024
25 Nov 2024
28 Oct 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in all classes of soils and depositing on bank, with all leads and lifts as per SS20B, Including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF ABUTMENT& PIERS as per Section 300 of MORT&H Specifications(Fifth Revision). | 4,697.98 | Cubic meter | - | - |
| 2Earth work excavation in rock not requiring blasting (SDR, Kankar and Soft Rock) and depositing on bank, with all leads and lifts, including cost of all labour, equipments and all other incidental charges such as bailing out water, providing and maintaining necessary cofferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps and other deleterious matter and obstructions, trimming bottom of excavation backfilling and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification, for FOUNDATION OF ABUTMENTS AND PIERS as per Section 300 of MORT&H Specifications(Fifth Revision). | |||||
| 2.01 | Depth 0.0 -2.0m | 1,107.85 | Cubic meter | - | - |
| 2.02 | Depth 2.0 -3.0m | 366.76 | Cubic meter | - | - |
| 2.03 | Depth 3.0 -4.0m | 123.31 | Cubic meter | - | - |
| 2.04 | Depth 4.0 -5.0m | 73.44 | Cubic meter | - | - |
| 2.05 | Depth 5.0 -6.0m | 41.13 | Cubic meter | - | - |
| 3 | Plain Cement Concrete of Grade M-10, Nominal Mix, using 40mm ISS HBG metal including cost and conveyance of all materials to site including cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, Tools and Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for LEVELING COURSE UNDER FOOTINGS | 122.65 | Cubic meter | - | - |
| 4 | Cement Concrete M15, (Nominal mix 1:2:4) using 40mm ISS HBG metal including cost and conveyance of all materials to site and cost of cement at site including soft water, labour charges for mixing, transporting, laying,compacting, curing concrete hire charges for Tools and Plants including all other incidental charges, such as bailing out water, maintaining of protective bunds, cofferdams, shoring, strutting etc; complete as per relevant standard specification, etc, complete as per relevant standard specification for Filling the trenches around footing as per cl.707.4.6 of IRC 78:2014 | 1,095.58 | Cubic meter | - | - |
| 5 | Vibrated reinforced cement concrete M35 (Design mix) using 20mm ISS HBG graded metal including cost and conveyance of all materials to site and cost of cement at site but excluding cost and fabrication of steel but including cost of form work, labour charges for mixing, transporting, laying, curing concrete, working at heights, potable water, hire charges for tool and plants including all other incidental charges etc., complete for TWIN COLUMN PIERS AND ABUTMENT- 1500mm dia as per Sections 1500,1700&2200 of MORT&H Specifications(Fifth Revision)-Below sill level | 719.99 | Cubic meter | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_589888.xls
BOQ Document • 0.32 MB
155100345.pdf
Tender Document • 0.41 MB
PQ_OTA_Officer.pdf
Tender Document • 0.75 MB
PB_OTA_Officer.pdf
Tender Document • 2.31 MB
155100347.html
Tender Document • 0.06 MB
155173538.pdf
Tender Document • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .