| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹23,392.22Accepted-Finance 214 1 POONTHOTTA STREET SANKARNAGAR TIRUNELVELI 7 | TIRUNELVELI | TAMIL NADU | 627001 | ₹23,392.22 | 1st | Accepted-Finance 1sttender |
| 2 | 2nd₹25,577.50Accepted-Finance | ₹25,577.50 | 2nd | Accepted-Finance 2nd tender |
| Sl No | Description | Qty | Unit | M SIVAKUMAR L1 | SHREE SAI PARVATHY CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows filled up the earth well rammed and leveled of and the entire work completed in all respect. | 2,820 | Sqm | 6.25 ₹17,625 | 7 ₹19,740 |
| 2.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal 0/0 - 0/400 | 0.42 | Cum | 4,397 ₹1,846.74 | 4,400 ₹1,848 |
| 3.00 | 1/0 - 1/200 | 0.03 | Cum | 4,406 ₹132.18 | 4,450 ₹133.50 |
| 4.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal including cost of bitumen and all labour charges etc. complete 0/0 - 1/0 | 0.06 | Cum | 5,080 ₹304.80 | 5,100 ₹306 |
| 5.00 | Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | 10 | Sqm | 33.3 ₹333 | 35 ₹350 |
| 6.00 | Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. 0/0 - 1/0 | 9.5 | Sqm | 315 ₹2,992.50 | 320 ₹3,040 |
| 7.00 | 1/0 - 1/200 | 0.5 | Sqm | 316 ₹158 | 320 ₹160 |
Tender Value
₹30,000
Closing Date
5 Nov 2025, 3:00 pmClosed
Block Development Officer (B.Pt)
Block Development Office Nanguneri
Potholes Maintenance work and Renewal for Subramaniyapuram to Chithoor Road KM 0 0 2 350 in Eraippuvari Village Panchayat, Nanguneri Panchayat Union. R 103 PUR
2025_RDTN_619331_17
A2/3781/2025
Open Tender
Construction Works
80 days
Block Development Officer (B.Pt)
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
27 Dec 2025
1 Nov 2025
5 Nov 2025
1 Nov 2025
5 Nov 2025
1 Nov 2025
Amount
Clearing Scrub Jungle without alignment for the widening of the formation of the road cutting of trace up to 30mm girth products the cleaning are to be stocked in such a place as ordered by the departmental officer and the ground shall be left in a perfectly clean condition. All holes of hollows filled up the earth well rammed and leveled of and the entire work completed in all respect.
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal 0/0 - 0/400
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal including cost of bitumen and all labour charges etc. complete 0/0 - 1/0
Applying tack coat over BT surface (not treated with primer) using 3Kg of bituminous emulsion per 10 Sqm. including cost of bituminous emulsion which will be supplied departmentally at section stores and cost of which will be recovered at the rates as per special conditions appended herewith including conveyance of bituminous emulsion to actual work spot handling charges including labour charges for brushing, cleaning and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bituminous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Providing and laying open graded premix carpet of 20mm compacted thick using 0.18cum of 13.20mm IRC size HBG machine crushed chips and 0.09 cum of 11.20mm IRC HBG machine crushed chips with 14.60Kg of bitumen for 10 Sqm. of premix carpet including laying of seal coat 'A' over the premix carpet using 0.09 cum of 6.70mm IRC size HBG machine crushed chips with 9.80Kg of bitumen per 10 Sqm. including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling separately as per MOST specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant, power roller 80-100KN capacity and all other tools and plants employed therefor etc.com. 0/0 - 1/0
SHREE SAI PARVATHY CONSTRUCTION (BID ID -1503224)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_740566.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid