Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.4 L
EMD Value
₹4,720
Closing Date
24 Apr 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXEN ID Kulgam
Office of EXEN ID Kulgam
Construction of lining wall on Sarbuji Canal near breached spot u/s Muje Kadal including silt clearance d/s brick kiln at village Udhipora Bhatpora.
2022_IFC_166266_13
enit03of2022-23
Open Tender
Civil Works
Item Rate
10 days
Kulgam
Construction of lining wall on Sarbuji Canal near breached spot u/s Muje Kadal including silt clearance d/s brick kiln at village Udhipora Bhatpora.
7 documents required · 7 mandatory
₹200
Executive Engineer Irrigation Division Kulgam
₹4,720
25 Apr 2022
9 Apr 2022
25 Apr 2022
9 Apr 2022
24 Apr 2022
9 Apr 2022
90 days
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10m2 on plan) including disposal of excavated earth lead upto25 meters and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
a. Supply of stone boulders (nallah) nominal size 225mm (stack measurements reduced by 15%)
b. Dumping stone excluding cost of stones in Horizontal on level.
Providing and laying in position specified grade of cement concrete including curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:3:6 (1 Cement :3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Centering and shuttering including strutting, propping etc. and removal of form work for retaining walls return walls, walls of any thickness including strutting,propping etc and :
Filling available excavated earth (excluding Rock) in trenches plinth sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering lead upto 50 m and lift upto 1.5 m.
Silt clearance from canals. Inclusive of initial lead and lift (50m and 1.5m respectively)Wet. .
Carriage of materials by mechanical transport from source to actual site of work and Head load. a) Sand and aggregate average lead 8.0 kms by MT
b) Stones for an avg. lead 07 kms by M.T
c) Cement for an avg. lead 17 kms by M.T
Farooq Ahmad Lone
RASHID WANI
stage.html
html • 0.02 MB
finance_385678.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .