Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹31.1 L
EMD Value
₹31,100
Closing Date
27 Jul 2020, 5:00 pmClosed
XEN
Jal Shakti PHE Division Doda
Providing laying and fitting of G.I/ HDPE pipes for Stabilization of Existing Gravity Main and Raising of Head for WSS Itwas Jodhpur under State Capex.
2020_PHE_100385_2
e-NIT No. EE/JSD/D/02 of 07/2020
Open Tender
Civil Works
Item Wise
30 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
Yes
XEN
₹31,100
Yes
7 Aug 2020
14 Jul 2020
28 Jul 2020
14 Jul 2020
27 Jul 2020
14 Jul 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables, etc. (Not exceeding 1.5mtr in width) and for shafts, wells, cesspits and the like not exceeding 10sqm on plan, depth up to 1.5mtr including disposal of excavated earth up to 1mtr from cutting edge disposed earth is to be leveled and neatly dressed in all kind of soil 70% and ordinary rock 30%.
Providing and Fixing GI/HDPE pipes complete with GI Fittings excluding trenches and refilling etc. (external work). a) G.I Pipes 80mmØ
b) HDPE Pipes 90mmØ
c) HDPE Pipes 63mmØ
Providing and fixing G.I. Union in HDPE pipe including cutting and threading the pipe and making long screws etc. Complete (new work) a) G.I. Pipes 80mmØ
b) G.I. Pipes 50mmØ
Filling of available excavated earth in trenches, plinth, and side of foundation etc. lead up to 50mtr lift up to 1.5mtr.
Demolishing cement concrete manually /by mechanical means including disposal of material with in 50 meters lead 1:3:6 or richer mix.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering – All work up to plinth level 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushed.
Carriage of Sand & stone aggregate 20mm nominal size from source to road side of work at an average distance 35.00Km by Mechanical Transport.
Carriage of Sand & stone aggregate 20mm nominal size from road side to site of work at an average distance 01 Km by Head Load.
AL KHALIFA GROUP OF CONSTRUCTION
UNIVERSAL GROUP OF ENGINEERS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .