| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 LAccepted-AOC ROOM NO 220 2ND FLOOR DEVGIRI BUILDING NO 65 B LALLU BHAI COMPOUND MANKHURD MUMBAI 400043 | MUMBAI SUBURBAN | MAHARASHTRA | 400043 | L1 | Accepted-AOC AOC | |
| 2 | L2₹36.2 L+₹38,766 (1.08%)Rejected-Finance 00 C O PARMOD SINGH BAKTA BARHI CHINTAMAN SITAMARHI BIHAR 843315 | SITAMARHI | BIHAR | 843315 | L2 | Rejected-Finance Not L1 | |
| 3 | L3₹37.9 L+₹2.0 L (5.69%)Rejected-Finance 38 30 92 SAI NAGAR MARRIPALEM VISAKHAPATNAM 530 018 | VISAKHAPATANAM | ANDHRA PRADESH | 530018 | L3 | Rejected-Finance Not L1 | |
| 4 | L4₹40.3 L+₹4.5 L (12.5%)Rejected-Finance ATLANTIS A2 1501 PLOT NO 05 SECTOR 11 NEAR CLOUD 36 GHANSOLI NAVI MUMBAI 400 701 E 97 CWE SUBS BHANDUP | THANE | MAHARASHTRA | 400701 | L4 | Rejected-Finance Not L1 | |
| 5 | L5₹40.4 L+₹4.6 L (12.8%)Rejected-Finance SHOP NO 4 SUN STAR CHS LTD PLOT NO 309 SECTOR 21 NERUL EAST NAVI MUMBAI 400 706 | THANE | MAHARASHTRA | 400706 | L5 | Rejected-Finance Not L1 |
| Sl No | Description | Qty | Unit | RAJENDRA CONSTRUCTION L12 | PRIME ENGINEERS L4 | Parmatma Enterprises L5 | M/s Shree Construction Co L8 | sahajanand const co. L11 | mp construction co L1 | M/s Mukesh Engineers L7 | Anjali Constructions L3 | Chaudhary Enterprises L10 | M/S KHUSHI ENTERPRISES L2 | M/s Mohd Altaf Hanif Qureshi L9 | A M ENTERPRISES L6 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | M & L Rendering 10 mm thick on fair faces of brick work or concrete surfaces using CM 1:6, finished the surface even and smooth with sagol finish including all necessary scaffolding as required incl taking down cement or cement lime plaster of any description on brick or stone walls, including raking out joints, hacking for keys, scrubbing down with water all as specified and as directed. | 150 | Sqm | 300 ₹45,000 | 252 ₹37,800 | 225 ₹33,750 | 300 ₹45,000 | 250 ₹37,500 | 200 ₹30,000 Lowest | 200 ₹30,000 Lowest | 250 ₹37,500 | 300 ₹45,000 | 350 ₹52,500 | 300 ₹45,000 | 200 ₹30,000 Lowest |
| 2.00 | M & L Rendering 5 mm thick on fair faces of concrete surfaces using CM 1:3, finished the surface even and smooth in ceiling including all necessary scaffolding as required incl taking down cement or cement lime plaster of any description on brick or stone walls, including raking out joints, hacking for keys, scrubbing down with water all as specified and as directed. | 120 | Sqm | 300 ₹36,000 | 252 ₹30,240 | 150 ₹18,000 | 250 ₹30,000 | 200 ₹24,000 | 100 ₹12,000 Lowest | 160 ₹19,200 | 200 ₹24,000 | 200 ₹24,000 | 350 ₹42,000 | 250 ₹30,000 | 200 ₹24,000 |
| 3.00 | M&L for 20mm thick polymer modified ready mix cement based plaster in two layers (12 + 8 mm) on the wall surfaces, top layer of 8 mm mixed with liquid water proofing compound in the proportion as per manufacturer’s instructions and including finishing the surfaces of the top layer even and smooth, including scaffolding as required complete all as specified and directed,
Make: Easy plast from M/s wall plast or chemplast or Readiplast from ultratech.
Notes : (i) The thickness of plaster specified above is the minimum thickness and the quoted rates shall also be deemed to include for provision of dubbing of the surfaces with the ready mix plaster and nothing extra shall be payable on this account. (ii) WPC shall be paid for separately. | 300 | Sqm | 400 ₹1,20,000 | 272 ₹81,600 | 420 ₹1,26,000 | 400 ₹1,20,000 | 450 ₹1,35,000 | 280 ₹84,000 | 230 ₹69,000 Lowest | 320 ₹96,000 | 650 ₹1,95,000 | 350 ₹1,05,000 | 350 ₹1,05,000 | 300 ₹90,000 |
| 4.00 | Supply only water proofing compound | 60 | Kg | 70 ₹4,200 | 77 ₹4,620 | 90 ₹5,400 | 45 ₹2,700 | 35 ₹2,100 | 34 ₹2,040 | 60 ₹3,600 | 10 ₹600 Lowest | 55 ₹3,300 | 38 ₹2,280 | 40 ₹2,400 | 40 ₹2,400 |
| 5.00 | Chipping, removing carefully loose/damaged concrete incl plastering (total thickness upto 60mm ) from RCC surfaces of columns, beams,Chajas, soffits of slabs etc by low impact Hammer/Breakar without damaging the structure & cleaning the surfaces with wire brush etc and disposal of debris out side MOD land, complete all as specified and directed.
Note: Hard concrete shall not be removed by force. (upto 12.0m height of bldg or 5 storey bldg) | 400 | Sqm | 301 ₹1,20,400 | 51 ₹20,400 | 60 ₹24,000 | 50 ₹20,000 | 50 ₹20,000 | 12 ₹4,800 Lowest | 40 ₹16,000 | 20 ₹8,000 | 75 ₹30,000 | 25 ₹10,000 | 30 ₹12,000 | 35 ₹14,000 |
| 6.00 | M&L for cleaning existing reinforcement with wire/ rotary wire brush to a shining bright finish, making the surfaces free from loose material, dirt etc complete and applying two coats of alkaline rust converting primer conforming to ASTM-B-117 of make. "Feovert" of "Krishna Conchem" OR "Roff Rust Cleaner' of 'Pidilite' OR 'Shali Rustoff' of 'STP Ltd', on rebars with time interval of 1 hour between the coats, complete all as specified and directed. [Note :- Mode of measurement: superficial area covered between the end to end reinforcement bars (i.e., concrete area excluding all side covers) will be measured.] | 400 | Sqm | 100 ₹40,000 | 151 ₹60,400 | 90 ₹36,000 | 80 ₹32,000 | 120 ₹48,000 | 15 ₹6,000 Lowest | 60 ₹24,000 | 30 ₹12,000 | 90 ₹36,000 | 25 ₹10,000 | 50 ₹20,000 | 40 ₹16,000 |
| 7.00 | M&L for Anticorrosive Treatment to Reinforcement using IPNET-RB of M/s Krishna Conchem or Epoxy Zinc Primer of M/s. Dr. Fixit by application on exposed reinforcement in two coats with time interval of minimum 4 hours between each coat. The application shall be done by brush after cleaning/wire brushing to the exposed steel surfaces complete all as specified and directed.
Note :- Mode of measurement: superficial area covered between the end to end reinforcement bars (i.e., concrete area excluding all side covers) will be measured. | 400 | Sqm | 150 ₹60,000 | 151 ₹60,400 | 90 ₹36,000 | 110 ₹44,000 | 120 ₹48,000 | 15 ₹6,000 Lowest | 60 ₹24,000 | 80 ₹32,000 | 90 ₹36,000 | 25 ₹10,000 | 80 ₹32,000 | 90 ₹36,000 |
| 8.00 | M&L for Epoxy bond coat of Make Fosroc (NITOBOND-EP) OR EPOXY BONDING AGENT of Dr. Fixit OR equivalent of M/s. Krishna Conchem as approved by GE over exposed concrete surfaces prior to application of any type of mortar to ensure bond between old concrete & new concrete by brush application complete all as specified and directed. | 400 | Sqm | 160 ₹64,000 | 252 ₹1,00,800 | 90 ₹36,000 | 150 ₹60,000 | 125 ₹50,000 | 15 ₹6,000 Lowest | 60 ₹24,000 | 140 ₹56,000 | 125 ₹50,000 | 50 ₹20,000 | 150 ₹60,000 | 200 ₹80,000 |
| 9.00 | M&L for building up the profile of structural members by using polymer modified mortar from M/s. Krishna Conchem (Molith-PMM) OR Polymer mortar HB of Dr Fixit, upto 20mm thickness while the bonding agent is still tacking, including levelling, profiling etc, complete all as specified and directed. (upto 12.0m height of bldg or 5 storey bldg) | 200 | Sqm | 351 ₹70,200 | 393 ₹78,600 | 400 ₹80,000 | 450 ₹90,000 | 350 ₹70,000 | 280 ₹56,000 | 230 ₹46,000 | 180 ₹36,000 Lowest | 550 ₹1,10,000 | 350 ₹70,000 | 340 ₹68,000 | 250 ₹50,000 |
| 10.00 | M&L for building up the profile of structural members by using polymer modified mortar from M/s. Krishna Conchem (Molith-PMM) OR Polymer mortar HB of Dr Fixit while the bonding agent is still tacking, exceeding 20mm thickness and not exceeding 40mm thickness in two layers, each layer not exceeding 20mm, including levelling, profiling etc, complete all as specified and directed. (upto 12.0m height of bldg or 5 storey bldg) | 200 | Sqm | 451 ₹90,200 | 595 ₹1,19,000 | 450 ₹90,000 | 550 ₹1,10,000 | 400 ₹80,000 | 400 ₹80,000 | 260 ₹52,000 Lowest | 280 ₹56,000 | 650 ₹1,30,000 | 350 ₹70,000 | 430 ₹86,000 | 300 ₹60,000 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
23 May 2026, 6:00 pmClosed
GE (NW) Mankhurd
GE (NW) Mankhurd
REPAIRS TO ROOF LEAKAGE SEEPAGE WORKS AT CERTAIN BLDG NAD, CABS, NOFRA NSB UNDER GE (NW) MANKHURD.
2026_MES_762913_1
8553/E8
Open Tender
Civil Works
Item Rate
270 days
GE (NW) Mankhurd
As per tender document
8 documents required · 8 mandatory
₹500
GE (NW) Mankhurd
₹1 L
Yes
14 Jul 2026
30 Apr 2026
25 May 2026
30 Apr 2026
23 May 2026
16 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | M & L Rendering 10 mm thick on fair faces of brick work or concrete surfaces using CM 1:6, finished the surface even and smooth with sagol finish including all necessary scaffolding as required incl taking down cement or cement lime plaster of any description on brick or stone walls, including raking out joints, hacking for keys, scrubbing down with water all as specified and as directed. | 150 | Sqm | - | - |
| 2 | M & L Rendering 5 mm thick on fair faces of concrete surfaces using CM 1:3, finished the surface even and smooth in ceiling including all necessary scaffolding as required incl taking down cement or cement lime plaster of any description on brick or stone walls, including raking out joints, hacking for keys, scrubbing down with water all as specified and as directed. | 120 | Sqm | - | - |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
8553TENDERPAGES.pdf
Tender Documents • 0.98 MB
BOQ_854571.xls
BOQ • 0.43 MB
8553Corrigendum.pdf
PDF • 0.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .