| Sl No | Description | Qty | Unit | K Ganesan L2 | SAMBASIVAN CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.001.Construction of Multipurpose Building @ Pillaikothur H/O Kamandoddi.Estimate Amount: Rs.10.90 Lakhs | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 31.57 | Cum | 264.31 ₹8,344.27 | 263.52 ₹8,319.33 |
| 3.00 | Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete | 7.73 | Cum | 5,341.66 ₹41,291.03 | 5,325.67 ₹41,167.43 |
| 4.00 | Filling basement with conveyed earth layers of not more than 15cm thick well rammed watered and compacted complying with standard specification etc.. Complete | 16.2 | Cum | 121.23 ₹1,963.93 | 120.87 ₹1,958.09 |
| 5.00 | Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete. | 18.45 | Cum | 6,094.97 ₹1.1 L | 6,076.72 ₹1.1 L |
| 6.00Supplying and errecting shuttering including necessary support for plane surface including all R.C.C Works etc., Complete. | |||||
| 7.00 | Centering below ground level | 24.77 | Sqm | 548.6 ₹13,588.82 | 546.95 ₹13,547.95 |
| 8.00 | Rate for Column Post,Roof Slab,Lintel Beam | 97.79 | Sqm | 1,097.19 ₹1.1 L | 1,093.9 ₹1.1 L |
| 9.00 | Rate for Sunshade | 8.41 | Sqm | 1,097.19 ₹9,227.37 | 1,093.9 ₹9,199.70 |
| 10.00 | Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor. | 1.93 | mt | 92,042.22 ₹1.8 L | 91,766.64 ₹1.8 L |
Tender Value
₹10.9 L
EMD Value
₹11,000
Closing Date
25 Nov 2025, 3:00 pmClosed
The Block Developement Officer (V.P) Shoolagiri
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under the Scheme Mines and Minerals_2023_24 Construction of Multipurpose Building at Pillaikothur in Kamandoddi Panchayat Package No_2025_26_SGI_80
2025_RDTN_625736_1
Rocno_1907_2025_E2
Open Tender
Civil Works
The Block Development Office Shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹11,000
Yes
The Block Development Office Shoolagiri
16 Mar 2026
22 Nov 2025
25 Nov 2025
22 Nov 2025
25 Nov 2025
22 Nov 2025
24 Nov 2025
Amount
1.Construction of Multipurpose Building @ Pillaikothur H/O Kamandoddi.Estimate Amount: Rs.10.90 Lakhs
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement Concrete in 1 : 4 : 8 mix using 40 mm metal including cost and conveyance of all materials to site and labour charges etc complete
Filling basement with conveyed earth layers of not more than 15cm thick well rammed watered and compacted complying with standard specification etc.. Complete
Brick work in cement Mortor 1:5 (One cement and five sand) using second class Bricks of size 23 x 11.5 x 7.5 cms for the following including mixing mortar and all other labour charges etc complete.
Supplying and errecting shuttering including necessary support for plane surface including all R.C.C Works etc., Complete.
Centering below ground level
Rate for Column Post,Roof Slab,Lintel Beam
Rate for Sunshade
Supplying, fabricating and placing in position inild steel or ribbed tor steel and all reinforced cement Concrete works as per the design given including cost of steel and binding wire in all floors etc complete complying with Standard (MS rods or RTS rods) which will be supplied departmentally at section stores and cost will be recovered at issue rate. The binding wire shall be supplied by the Contractor.
R.C.C. 1:1.5:3-using 20mm ISS HBGS metal including cost and conveyance of materials and labour charges etc. complete
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc.. complete complying with standard specifications and as directed by the Departmental Officers. [The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty should be got approved by the Executive Engineer before use on work.
Plastering with CM 1:3, 10mm thick.over the cement concrete for floor finish including curing etc., complete complying with standard specifications and as directed by the departmental officers. Rate for 10m2.
Paving the Top of roof with Solar reflective ceramic tiles of size 305 x 305 x 7mm thick of approved quality and colour laid in Cement mortar 1:3 (One cement and three M.Sand) 12mm thick and pointed with tile grout (Nitotile Grout or equivalent) and cement in the ratio of 1:3 for joint, curing etc., complete complying with standard specification and as directed by the departmental officers. (The make and brand of the tiles should be got approved by the Executive Engineer before use on works)
Flooring with following ceramic tiles of size 305 x 305 x 6 mm laid over 20 mm thick cement mortar 1:3 (One Cement and Three M.Sand) base mortar over the existing slab / floor including cutting the tiles to the required size with special cutter wherever necessary, laying in position and pointing with white cement mixed with colouring pigment at the rate of 0.3 Kg. / sq.m. etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Plastering with C. M 1:5 mix, 12 mm thick including cost and conveyance of all materials to site and labour charges etc complete.
Providing the following thickness of Granolithic pattern floor finish with Plain Cement concrete 1 : 2 : 4 mix using 10-12mm ISS HBG metal and the top rubed smooth etc., complete complying with standard specification as directed. i. 20mm thick for Resid
Supplying and Fixing of Steel Door 1.20mx2.10m including all charges etc.. Complete
Supplying and Fixing of Steel Window 1.20mx1.30m including all charges etc.. Complete
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic enamel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Supplying and Fixing of PVC Rain Water Down Fall Pipe 110mm Dia including all charges etc.. Complete
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work).
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Electrical Arrangements
Light Point SD.NO.25
Plug Point SD.No.12
TNEB Meter Board SD.No.126
Service Pipe SD.No.73
Service Wire SD.No.68
Tube Light SD.No.88
Ceiling Fan SD.No.110
Providing Rain Water Harvesting Structure
Provision For Writing Name Board Charges
Provision Photo Charges
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K Ganesan (BID ID -1519756)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.58 MB
PB80.pdf
Tender Documents • 0.75 MB
TB80.pdf
Tender Documents • 0.80 MB
BOQ_748249.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid