| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.6 CrAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹17.1 Cr+₹47.3 L (2.84%)Accepted-Finance IIIRD B2 FLAT NO 8 IIND FLOOR NEHRU NAGAR GZB 201001 U P | GHAZIABAD | GHAZIABAD | UTTAR PRADESH | 201001 | L2 | Accepted-Finance L2 | |
| 3 | L3₹17.7 Cr+₹1.1 Cr (6.34%)Accepted-Finance | L3 | Accepted-Finance L3 | |
| 4 | Rejected-Technical BARPETA | BARPETA | ASSAM | 781301 | - | Rejected-Technical Technically Non-Responsive | |
| 5 | Rejected-Technical | - | Rejected-Technical Technically Non-Responsive |
Tender Value
₹16.8 Cr
EMD Value
₹33.7 L
Closing Date
2 Dec 2024, 5:00 pmClosed
General Manager (P)
General Manager (P) National Highways and Infrastructure Development Corporation Limited. Regional Office, 2nd Floor, Agnishanti Business Park, Opp. AGP Office GNB Road, Ambari, Guwahati- 781001
One Time Improvement of Tulungia - Jogighopa section of NH-17 (Old-NH-31B) from Km 1.297 to Km 1.673, Km 11.415 to Km 18.321 and Km.19.36 to Km.19.69 (Length- 7.612 kms) in the State of Assam in FY-24-25.
2024_NHIDC_834970_1
RO/BNG/Tul-Jog/OTI/24-25/1
Open Tender
Civil Works
Item Rate
270 days
Assam
Please refer Tender Documents
5 documents required · 5 mandatory
₹11,800
NHIDCL
₹33.7 L
NHIDCL, RO Guwahati
23 Dec 2024
14 Nov 2024
3 Dec 2024
14 Nov 2024
2 Dec 2024
14 Nov 2024
14 Nov 2024 - 19 Nov 2024
20 Nov 2024
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materisla up to lead of 1000 meters, stacking serviceable and unservieable materials seperatey.)
II. By Mechanical Mean
A. Bituminous Base Course | 2,326 | Cum | 100 | ₹2,32,600 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), (Including cost of testing of materials at site and laboratory as directed by the deptt.)
(a) from Private Land | 3,890 | Cum | 100 | ₹3,89,000 |
| - | Granular Sub-base with Close Graded Material (Table:- 400-1)
A. Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per cl. 401 (with an initial lead of 5 Km.) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
(i.) for grading-I Material | 3,890.4 | Cum | 10 | ₹38,904 |
| - | Tack coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt,) as per clause 503 of Ministry of Road Transport and Highways specifications for Road and Bridge works(Fifth RevIsion)
(II) With Bitumen emulsion CSS-1, (IS:8887-2004)
(a) Normal bituminous surface (For DBM) | 77,520 | SQM | 10 | ₹7,75,200 |
| - | Tack coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt,) as per clause 503 of Ministry of Road Transport and Highways specifications for Road and Bridge works(Fifth RevIsion)
(II) With Bitumen emulsion CSS-1, (IS:8887-2004)
(a) Normal bituminous surface (For BC) | 77,520 | SQM | 10 | ₹7,75,200 |
| - | Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix and filler transporting the hot miox to work site,laying with a hydrostatic paver finisher with sensor control to the reqd. grade, lavel and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoSRT&H cl. no. 507. complete in all respect. (inclusive of lead from quarry to site and carriage of mixed material. )( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(a) With hydrated lime/cement as filler ( refer table 500-9 of MoSRT&H specification) (I) with 60/7O or VG-3O grade bitumen
(ii) for GradingII(19 mm nominal size) | 4,651 | CUM | 10 | ₹46,510 |
| - | Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average
output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 Yo of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the requir.ed grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 509 complete in all respects) (including carriage from quarry to site and carriage of mixed material)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
A. With hydrated lime/cement as filler (ref er table 5OO-9 of MoRT&H
specification).
(I) with 6O17O or VG-3O grade bitumen
ii) for Grading-Il (13 mm nominal size) | 3,100.8 | CUM | 10 | ₹31,008 |
| - | Road Marking with Hot Applied Thermoplastic Compound with Reflectorising Glass Beads on Bituminous Surface
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes and conforming to the Mort&H specifications | 4,236.6 | SQM | 10 | ₹42,366 |
| - | Providing and fixing marker with Micro Prismatic lens in both direction having thermoplastic body adhering to the specification and guidelines of MoRT&H fixed to the road surface using the adhesives and the procedures recommended by the manufacturers with three mos replacement warranty and free maintenance | 3,575 | Nos. | 10 | ₹35,750 |
| - | Providing Sparkle Solar Road Studs, manufacturted by Tata B.P Solar India Ltd. Of size (125mmx125mm), 90mm height (from bottom of shank to the top of stud ) with detachable battery , m6LEDs-three on each side for Bi-directional studs/3 LEDs on one side for unidirectional studs, ultra brig LEDin amber and red colour, weight r stud 700+25 gs, flash rate of 50-65 times per minute completely water resistant and weather proof with replament warranty and free maintenance for one year from the date of installation of stud on oad-(installation shuyld be made usingadhesives and procedures erecommended by manufacturer under the suprevision of their competent technician)
(a.) Bi-directional Stud | 100 | Nos. | 10 | ₹1,000 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tenderdocument.pdf
Tender Documents • 0.96 MB
BOQ.xls
BOQ • 0.34 MB
Tenderdocument_2.pdf
Tender Documents • 3.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .