| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.4 LAccepted-Finance NO 42 ADAPPANVAYAL 3RD STREET PUDUKOTTAI 622002 | PUDUKKOTTAI | TAMIL NADU | 622002 | L1 | Accepted-Finance Low rate quoted | |
| 2 | L2₹31.2 L−₹12,228.34 (0.39%)Rejected-Finance | L2 | Rejected-Finance High rate quoted | |
| 3 | L3₹31.4 L+₹3,476.28 (0.11%)Rejected-Finance 2 138 MUTHALIYAR STREET VADAKKUPATTU AMODR TIRUVALLUR | TIRUVALLUR | TIRUVALLUR | TAMIL NADU | 601204 | L3 | Rejected-Finance High rate quoted | |
| 4 | L4₹33.2 L+₹1.9 L (5.96%)Rejected-Finance 1 1 PANJETTY PANJETTY POST TIRUVALLUR TAMIL NADU 601204 | THIRUVALLUR | TAMIL NADU | 601204 | L4 | Rejected-Finance High rate quoted |
Tender Value
Refer Docs
EMD Value
₹79,693
Closing Date
27 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Block development officer
Sholavaram block office
Nerkundram Panchayat AGAMT below 10 percentage works
2022_RDTN_273527_1
3534/2022/A7
Open Tender
Civil Works
Works
90 days
Sholavaram block office
As per documents
4 documents required · 4 mandatory
₹0
₹79,693
Yes
27 Dec 2022
19 Dec 2022
27 Dec 2022
19 Dec 2022
27 Dec 2022
19 Dec 2022
Amount
1.IMPROVEMENTS TO PALLASOORAPATTU KULAM (MAIN POND, BABY POND, STEPS, REVETMENT, INLET AND OUTLET)
Clearing the Light jungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries and tippers for formation of bund in layes of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum Moidture Content) and compaction of each layer to 95% proctor dendity through deployment of appropriate compaction eqipement (+8-10T Power Roller / Vibtratory Power Roller / Short width +-0.90m with drum) power roller or vibratory power roller / fuel operated or elect operated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per spectification.
Construction of Revertment work
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
supplying and Erection cenetering for sides and soffiots including necessary supports and strutting as directed by the departmental officers
Cement Concrete 1:3:6 ( One Cement Three sand and Six Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
Plain Cement Concrete 1:2:4 ( One Cement Two sand and Four Hard Broken stone) using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
Gravel backing for revetments including all labour charges etc complete
Rough stone dry packing including cost and conveyance of all labour charges etc complete
Pointing the rough stone dry packing with cement mortar 1:3 mix including all charges
R.R.Masonry in CM 1:5 using rough stones
2.IMPROVEMENTS TO METTUSOORAPATTU PUTHELI KULAM (MAIN POND, BABY POND, STEPS, REVETMENT, INLET AND OUTLET)
Clearing the Light jungle with uprooting and disposing of the same as directed by the Engineer in charge of the works as per technical (A8)
Earth Work in all soils expected hard rock requiring blastering and conveying by earth by deploying earth moving machineries and tippers for formation of bund in layes of suitable thickness benching of slopes prior to placement od earth fill breaking clods watering to OMC (Optimum Moidture Content) and compaction of each layer to 95% proctor dendity through deployment of appropriate compaction eqipement (+8-10T Power Roller / Vibtratory Power Roller / Short width +-0.90m with drum) power roller or vibratory power roller / fuel operated or elect operated plade compactor ensuring compaction of dedigned bund section including side slopes" complete as per spectification.
Construction of Revertment work
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
supplying and Erection cenetering for sides and soffiots including necessary supports and strutting as directed by the departmental officers
Cement Concrete 1:3:6 ( One Cement Three sand and Six Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
Plain Cement Concrete 1:2:4 ( One Cement Two sand and Four Hard Broken stone) using 20 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete
Gravel backing for revetments including all labour charges etc complete
Rough stone dry packing including cost and conveyance of all labour charges etc complete
Pointing the rough stone dry packing with cement mortar 1:3 mix including all charges
R.R.Masonry in CM 1:5 using rough stones
3. PROVIDING CEMENT CONCRETE ROAD AT NERKUNDRAM VILLAGE PERUMAL KOIL 2ND CROSS STREET
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
Cement Concrete 1:2:4 using 20 mm ISS HBG metal includig cost and conveyance etc complete
Towards centering charges for all labour charges etc.,
Supplying and fixing of Bitumen pad for exapansion joints
4. PROVIDING CEMENT CONCRETE ROAD AT METTUSOORAPATTU PERUMAL KOIL BACK SIDE STREET
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
Cement Concrete 1:2:4 using 20 mm ISS HBG metal includig cost and conveyance etc complete
Towards centering charges for all labour charges etc.,
Supplying and fixing of Bitumen pad for exapansion joints
5. PROVIDING CEMENT CONCRETE ROAD AT PERUMAL KOIL STREET
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
Cement Concrete 1:2:4 using 20 mm ISS HBG metal includig cost and conveyance etc complete
Towards centering charges for all labour charges etc.,
Supplying and fixing of Bitumen pad for exapansion joints
6. PROVIDING CEMENT CONCRETE ROAD AT ALLIMEDU VILLAGE 1ST AND 2ND STREET
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Supplying and filling in foundation and basement with good sand in layers not more 15cm thick including ramming , watering and compacting etc., completed
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, etc
Cement Concrete 1:2:4 using 20 mm ISS HBG metal includig cost and conveyance etc complete
Towards centering charges for all labour charges etc.,
Supplying and fixing of Bitumen pad for exapansion joints
7. IMPROVEMENTS TO SEKANJERI BG (COMPOUND WALL )
Earth work Excavation in all classes of soils except hard rock in Hard Ordinary soil with initial lead and lift including all other charges and labour charges etc,.
Filling with sand for foundation and basement filling including cost and conveyance and all labour charges and materials charges etc..
C.C 1:4:8 Mix Using 40mm ISS HBG Metal including cost and conveyance and all materials and all labour charges etc,.Completed.
Supply and Fabrication of steel including cost and conveyance of all materials to site and all labour charges for placing in position etc,..completed..
Supply and errecting for centering including cost and conveyance and labour charges with materials charges with MS sheet completed
Below
Above
RCC 1:1.5:3 Mix using 20mm HBG metal including cost and conveyance and all labour charges and materials charges completed..
Brick work in CM 1:5 mix using country Bricks including cost and conveyance of all materials to site mixing, placing,curing and all labour charges etc,..
Plastering in CM 1:5 Mix using 12mm thick including cost and conveyance and all lab our charges and materials charges completed..
Painting two coats with Exterior/interior first quality Emulsion of approved colour over one coat of primer including cost and conveyance and all lab our charges and materials charges completed..
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
M RAJAGOPAL
V ANANDHAN
BALAJI ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .