| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.6 LAdmitted-Finance | ₹5.6 L | L1 | Admitted-Finance |
| 2 | L2₹6.2 LAdmitted-Finance | ₹6.2 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S AJAY TOMAR CONTRACTOR L2 | ASHUTOSH ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00Following work need to done on below given 220KV S/C 220KV Nara-Roorkee line. 1. Replacement of Tower No. 160 SA+0 by Construction of new Foundation on war foot basis. | |||||
| 2.00 | Check survey & final peg marking on proposed route and prepration of final profile. | 1 | Job | 12,500 ₹12,500 | 10,000 ₹10,000 Lowest |
| 3.00 | Cost of excavation of 220 KV tower foundation pits including all earth work, back filling watering and leveling. | 111.63 | CUM | 350 ₹39,070.5 | 300 ₹33,489 Lowest |
| 4.00 | Setting of stubs including all foundation work but excluding cost of concreting and excavation (Rate per location) for 220 KV DA+0 tower | 1 | Job | 3,150 ₹3,150 | 3,000 ₹3,000 Lowest |
| 5.00Cost of Concreting for 220 KV D/C DA+0 tower foundation including cost of cement coarse sand, stone grid, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars | |||||
| 6.00 | 1:2:4 (RCC) | 17.01 | CUM | 9,850 ₹1,67,548.5 | 9,500 ₹1,61,595 Lowest |
| 7.00 | 1:3:6 (PCC) | 1.52 | CUM | 9,200 ₹13,984 | 9,000 ₹13,680 Lowest |
| 8.00 | Installation of steel reinforcement bars in RCC foundation including cost of cutting, welding, binding ng and placing them in foundation pits. | 0.07 | MT | 76,500 ₹5,202 | 75,000 ₹5,100 Lowest |
| 9.00 | Erection of super structure of 220 KV SC towers and their extensions whenever required including all work above ground level excluding hoisting of insulator, hardware and accessories but including fitting of number, phase plates, bird guard and fixing & punching for 220KV SC line. | 4.63 | MT | 8,600 ₹39,818 | 8,000 ₹37,040 Lowest |
| 10.00 | Lowering down the zebra conductor including de-hoisting of all the necessary hardwares & accessories between section to section tower of all the three power conductors. | 1 | Job | 87,000 ₹87,000 | 80,000 ₹80,000 Lowest |
Tender Value
₹4.1 L
EMD Value
₹5,000
Closing Date
27 Jun 2026, 12:00 pmClosed
SE ETC MUZAFFARNAGAR
NEAR 132 KV SUB STATION BHOPA ROAD MUZAFFARNAGAR
REPLACEMENT OF 01 NO. 220 KV TOWERS OF 220 KV NARA ROORKEE LINE UNDER ETD MUZAFFARNAGAR
2026_UPTCL_1162239_1
ETC MU T 02 2026 27 Short Term Tender
Open Tender
Electrical Works
Item Wise
15 days
MUZAFFARNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
EE ETD MUZAFFARNAGAR
₹5,000
29 Jun 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
27 Jun 2026
19 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Following work need to done on below given 220KV S/C 220KV Nara-Roorkee line.
1. Replacement of Tower No. 160 SA+0 by Construction of new Foundation on war foot basis. | - | - | - | - |
| 2 | Check survey & final peg marking on proposed route and prepration of final profile. | 1 | Job | 1.25 | ₹1.25 |
| 3 | Cost of excavation of 220 KV tower foundation pits including all earth work, back filling watering and leveling. | 111.63 | CUM | - | - |
| 4 | Setting of stubs including all foundation work but excluding cost of concreting and excavation (Rate per location) for 220 KV DA+0 tower | 1 | Job | 100 | ₹100 |
| 5 | Cost of Concreting for 220 KV D/C DA+0 tower foundation including cost of cement coarse sand, stone grid, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars | - | - | - | - |
| 6 | 1:2:4 (RCC) | 17.01 | CUM | 10 | ₹170.1 |
| 7 | 1:3:6 (PCC) | 1.52 | CUM | 11 | ₹16.72 |
| 8 | Installation of steel reinforcement bars in RCC foundation including cost of cutting, welding, binding ng and placing them in foundation pits. | - | MT | 1 | - |
| 9 | Erection of super structure of 220 KV SC towers and their extensions whenever required including all work above ground level excluding hoisting of insulator, hardware and accessories but including fitting of number, phase plates, bird guard and fixing & punching for 220KV SC line. | 4.63 | MT | 1 | ₹4.63 |
| 10 | Lowering down the zebra conductor including de-hoisting of all the necessary hardwares & accessories between section to section tower of all the three power conductors. | 1 | Job | 1 | ₹1 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tenderdoc02.pdf
Tender Documents • 0.54 MB
BOQ_2178468.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].