| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.9 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹9.0 L+₹8,590.75 (0.97%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹9.1 L+₹18,505.11 (2.08%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is third lowest | |
| 4 | L4₹10.0 L+₹1.1 L (12.1%)Accepted-Finance | L4 | Accepted-Finance Rate quoted is second highest | |
| 5 | L5₹11.6 L+₹2.7 L (30.4%)Accepted-Finance | L5 | Accepted-Finance Rate quoted is highest |
Tender Value
₹13.4 L
EMD Value
₹14,000
Closing Date
30 May 2022, 4:00 pmClosed
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
CONSTRUCTION OF 02NO 132KV BAY AT 132KV S/S GOSHAINGHPUR and 01NO 132KV BAY AT 132KV S/S KADIPUR FOR STRINGING OF SECOND CIRCUIT ON 132KV NEW TANDA-GOSHAINGHPUR -KADIPUR LINE UNDER ETD, SULTANPUR.
2022_UPTCL_699336_1
T. No. 09/ETCS/2022-23
Open Tender
Electrical Works
Item Wise
30 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,652
SE ETC Sultanpur
₹14,000
1 Jun 2022
13 May 2022
31 May 2022
13 May 2022
30 May 2022
13 May 2022
13 May 2022 - 30 May 2022
Amount
Shorting Stacking & Loading of lattice type structure ATMS-02 set, BTM-02set, AXM-04 set BCT-12set,ALP-10set,BBL-04set & BTI-02set from EFU Nani Pryagraj on truck /pickup
Carrige of above lattice type structure ATMS-02 set, BTM-02set, AXM-04 set BCT-12set,ALP-10set,BBL-04set & BTI-02set from EFU Nani Pryagraj and carriage up to 132KV S/S Goshainghpur Sultanpur ( Rate Rs.15 /per KM i.e 175KM X Rs. 15=2625) by truck /pickup
Unloading Shorting & Stacking of lattice type structure ATMS-02 set, BTM-02set, AXM-04 set BCT-12set,ALP-10set,BBL-04set & BTI-02 set at 132KV S/S Goshainghpur Sultanpur.
Shorting Stacking & Loading of lattice type structure AKR-02 set, BKR-02set, ABR-04 set, AXM-01set, DKR-02set BCT-06set,ALP-05 set,BBL-02set & BTI-01set from EFU Nani Pryagraj on truck /pickup
Carrige of above lattice type structure AKR-02 set, BKR-02set, ABR-04 set, AXM-01set, DKR-02set BCT-06set,ALP-05 set,BBL-02set & BTI-01set from EFU Nani Pryagraj and carriage up to 132KV S/S Kadipur Sultanpur ( Rate Rs.15/per KM i.e 160KM X Rs. 15=2400) by truck /pickup
Unloading Shorting & Stacking of lattice type structure AKR-02 set, BKR-02set, ABR-04 set, AXM-01set, DKR-02set BCT-06set,ALP-05 set,BBL-02set & BTI-01set from EFU Nani Pryagraj and carriage up to 132KV S/S Kadipur Sultanpur
Erection of Main & Auxiliary Structure for 132 KV Bus extension/ new equipment for new 132 KV Bay including shifting of material Store to site, erection as per drawing using necessary nut-bolts & washers and fabricating/ modifying holes etc if required. (for 02 No 132 KV bay at 132KV S/S Goshinghpur & 01 No 132KV bay at 132KV S/S Kadipur
i. BCT for 145KV CT 09 Set ii. BCT for 145KV PT 09 Set iii. ALP for 120 KV LA 09 Set iv. ALP for 145 KV BPI 06 Set v. BBL for 145KV Line isolator 03 Set vi. BBL for 145KV Bus isolator 03 Set vii. BTI for 145KV Tendom Isolator 03 Set viii. ATMS 02 Set ix. BTM 02 Set x. AXM 05 Set xi. AKR 02 Set xii. BKR 02 Set xiii. DKR 02 Set xiv. ABR 04 Set
Complete erection of following equipments as per instruction manual of various equipments and technical specifications including shifting of material / equipment from storage place to erection site with proper alignment, leveling etc. including all other associated work to complete the job satisfactorily. (for 02 No 132 KV bay at 132KV S/S Goshainghpur & 01 No 132KV bay at 132KV S/S Kadipur
145 KV SF6 Circuit Breakers
145 KV Current Transformers Ratio ( 400-200/1A)
Junction box for 145KV CT
145 KV Potential Transformers
Junction box for 145KV PT
145 KV Line Isolators with earth switch MOTORISED/Manual
145 KV Bus Isolators without earth switch MOTORISED/Manual
145 KV Tendom Isolators without earth switch MOTORISED/Manual
145 KV Post Insulators for support
120 KV Surge Arrestors
Erection of Simplex type Control & Relay Panels as per Technical Specification of SAS for 132KV Feeder Panel including shifting from store to control room at 132KV S/S Goshainghpur
Erection of Control & Relay Panels as per Technical Specification of NON SAS for 132KV Feeder Panel including shifting from store to control room at 132KV S/S Kadipur
Laying of following sizes of 1.1 KV Copper Control Cable in the cable trench from control & relay panel to various equipments/ marshalling boxes/ Junction Box etc in switchyard as per cable schedule along with its saddling at every 1000 mm distance with Alu. saddles of size 25x3 mm size including carriage of cable drums from store to laying site and all other associated works to complete the job satisfactorily as per technical specification and shifting back balance material to the store after completion of the work. ( for 02 No 132 KV bay at 132KV S/S Goshainghpur & 01 No 132KV bay at 132KV S/S Kadipur
2 core * 2.5 sq. mm.
4 core * 2.5 sq. mm.
6 core * 2.5 sq. mm.
10 core * 2.5 sq. mm.
Termination of Control Cable including cost of cable glands, lugs and ferrules complete and both end as per site and panel requirement for SAS 132 KV Feeder . Including supply of faruls & cable gland also cuuting drilling welding in panels. ( for 02 No 132 KV bay at 132KV S/S Goshainghpur & 01 No 132KV bay at 132KV S/S Kadipur
Stringing of following Bus 03 Phase with specified ACSR Single Moose Conductor, Tension Fittings, Suspension Fitting and P.G. Clamp to complete the work as per technical specification (including cost of hoisting of insulator, cutting of conductor and shifting of all material from store to site ( for 02 No 132 KV bay at 132KV S/S Goshainghpur & 01 No 132KV bay at 132KV S/S Kadipur
132 KV Main Bus –I
132 KV Transfer Bus
Jumpering of various equipments in 132 KV Bays with specified Clamps and ACSR Panther Conductors from Line to LA, PT,CT Line, Bus& Tendom Isolators up to bus main & transfer bus of all three phases ( for 02 No 132 KV bay at 132KV S/S Goshainghpur & 01 No 132KV bay at 132KV S/S Kadipur
Delta Earthing of 120KV LA as per technical spexcfication to complete job satisfactory (Material provided by department)
Earthing of equipments and structures by 50x6 mm size of M.S. Flat including digging of earth, cutting, bending, welding and painting of M.S. Flat by bus green paint (M.S. Flat will be provided by the department).
Laying of earth mat in whole switchyard on 6 mtr grid in length and width dimension of switch yard help of 40mm dia MS. Rod
Fabrication of 3 M. long, 40 mm diameter electrode with following M.S. Rod having 150 mm long conical shape and then its piercing vertically inside the ground with top 500 mm below ground level and its welding with earth mat excluding the cost of M.S. Bar.
HARE KRISHNA ENERGY PROJECTS
SHIVAM ENGINEERS
M/s S.S. Refregeration
M/s Janta Charan
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .