Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance CPWD | CENTRAL | DELHI | 110007 | Admitted-Finance |
| 2 | Admitted-Finance 21 JHAMRI 151 JHAMRI JHAMRI ROHTAK HARYANA 124142 UDYAM HR 07 0030314 | JHAJJAR | HARYANA | 124142 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical GURU RAM DAS NAGAR SRI SAI VIHAR COLONY ALIGARH ALIGARH ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | Rejected-Technical Experience not as per tender specification |
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
25 Jan 2021, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE ETD-I Aligarh
132 KV S/S Sarsol GT Road Aligarh
Erection and cabling of new PT junction box in control room at 132 KV S/S Boner under ETD-I, Aligarh
2020_UPTCL_541267_1
TDA-17/2020-21
Open Tender
Electrical Works
Item Rate
30 days
Aligarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
EE ETD
₹1,000
28 Jan 2021
26 Dec 2020
25 Jan 2021
26 Dec 2020
25 Jan 2021
26 Dec 2020
120 days
Amount
Erection of new PTJB (inside the control room) work included of its earthing and all other associated work to complete the job satisfactorily (PT junction will be provide by the department free of cost)
Cable tracing from switchyard PT juction box to 33 KV tripple feeder C&R panel and removing from 33 KV tripple feeder C&R panel if cable is in proper conditiion then terminate at new PT junction box otherwise new cable laying from PT junction box to New PT junction box as per site required.
Cable laying from new PT junction box to 33 KV tripple feeder C&R panel and terminated at both end complete wth all ferruls, lugs as per drawing and all other associated work to complete the job satisfactorily
Checking and verification of all metering value of PT junction box, new PT junction box , Panel terminal block and meters etc. & checking value of all system by removing HRC fuse from respected place so as to verify all phase value are correct from each PT junction to respective feeder.
Testing after completion of work & providing new cable schedule and drawing of the above respective all associated work (in 03 sets)
Replacement of old & damaged 33 KV CT/PT junction box work including opening of wiring and removing of old CT/PT junction box after that erection of new junction box and proper earthing & old termination with new lugs, ferruls etc. and all other associated work to complete the job satisfactorily.
M/S A.K. ENTERPRISES
M/S P K ENTERPRISES
M/S KUMAR CONSTRUCTION COMPANY
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .