Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹273.3 Cr
EMD Value
₹5.5 Cr
Closing Date
23 Nov 2026, 5:30 pm
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Yes (up to 4 members)
Two Packet System
EPC [ Single Stage ]
No
Not Applicable
Lowest to Highest
180 days
Expenditure
Capital (Works)
WORKS
14 conditions · 2 needing a document upload
Bidder shall have financial eligibility as referred in para 2.2 of RFP Document.
Bidder shall have eligibility as referred in para 2.2 of uploaded RFP Document.
Defination of Similar Work :- "Any New Line/Gauge Conversion/ Multi Tracking works/ Metro Rails/LRT/Mono Rail/Hi-speed Rail/ and DFC involving Earthwork, Bridge work and track work."
49 conditions · 17 needing a document upload
APPENDIX-VII (BID SECURITY)/EMD,(REFER Para 1.2.4 of RFP)The Bidder shall furnish as part of its Bid, a Bid Security, referred to in Clause 1.2.4 here in above through [e- payment Gateway of Authority OR in form of Bank Guarantee from a Bank as per format at Appendix VII].
ANNEXURE III TO APPENDIX IA - (FINACIAL CAPACITY OF THE BIDDER) (Refer clause 2.2.2.2, 2.2.2.8, 2.2.2.7 of RFP) The Bidder must establish the minimum Net Worth specified in Clause 2.2.2.2, and provide details as per format at Annex-III of Appendix-IA.
APPENDIX IB (LETTER COMPRISING THE FINANCIAL BID, (Para 2.1.4, 2.11 and 3.1.6 of RFP)-The Bid shall be furnished in the format exactly as per Appendix-IA & IB i.e. Technical Bid as per Appendix IA and Financial Bid as per Appendix IB and it shall be signed by the Bidder's. authorized signatory. The Bidder shall first upload all the project details as mentioned in Para No. 2.11.1 of RFP document.
APPENDIX-VIII -Pending Litigation as per Para 2.2.2.2
The accepted rates should be deemed to include all taxes direct or indirect including Income Tax leviable under Central/State or Local Bodies Act or Rules.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All bidders are hereby informed that for the purpose of submission of Bank Guarantees in connection with Earnest Money/Bid Security, Performance Guarantee/Security, Bank Guarantees towards Advances, Security deposits, etc. shall be accepted from all Scheduled Commercial Bank of India as mentioned in the Tender Document, except those issued by Indian Overseas Bank. The Bids/offers accompanied with Bank Guarantees issued by Indian Overseas Bank shall be summarily rejected.
If the date of opening of tender is declared a holiday at a later date, the tenders will be opened on the next working day.
GST: It may please be noted that the supplier of Goods and/or services for the said tender/agreement, would be subject to GST Act and rules as applicable from time to time.
Tenderer may please note that offers received without requisite/mandatory documents as mentioned above, will be considered as invalid tender and for which contractor shall have no claim on Railway.
The tenderer s may note that the Railway reserves its right to either accept or reject any Bid/s without assigning any reasons whatsoever and tenderer s shall have no claim s on this account.
IF THE TENDERER/S DELIBERATELY GIVES WRONG INFORMATION/ CREDENTIALS/DOCUMENTS IN HIS/THEIR TENDERS AND THEREBY CREATE S CIRCUMSTANCES FOR ACCEPTANCE OF HIS/THEIR TENDER, RAILWAY RESERVES THE RIGHT TO TERMINATE THE CONTRACT AT ANY STAGE, BESIDES, BANNING OF BUSINESS FOR FIVE YEARS ON ENTIRE IR .
The contractor shall be responsible for the observance of the rules and regulations under the mines act and mineral rules and Indian Metallurgical rules and regulations of State/Central Govt. concerned as amended from time to time.
Tenderers shall hold the offer open for acceptance for a minimum period of 180 days from the date of opening of the tender.
Bidder must submit Financial Bid and Technical Bid at E - procurement portal on or before the Bid due date. Bids received online shall be opened on the time as mentioned in the Key Information Table at clause 1.1.2 of RFP
STUDY OF DRAWINGS AND LOCAL CONDITIONS: The drawings for the works can be seen in the office of the Deputy Chief Engineer/CN/MAS/ Southern Railway. It should be noted that these drawings are meant for general guidance only and Railway may suitably modify them during the execution of work according to the circumstances without making the Railways liable for any claims on account of such changes. If there is any variation between the description in the tender and the detailed plans, the Engineer-in-Charge will operate the correct description and his decision is final and binding on the tenderer/ Contractor. The Tenderer/Contractor is required to inspect the sites of works and acquaint himself with the site conditions, availability of approaches for transporting of men and materials, space and other factors relating to the works, availability of labour, electricity and water, etc., before quoting his rates. The extent of lead and lift involved in the execution of works and any difficulties involved in the execution of work should also be examined before formulating the rates for complete items of works described in the schedule. The Tender submitted will be deemed to have been made after such inspection.
CORRIGENDUM NOTICE ON IREPS: [I]Railway may modify the tender document by issuing online corrigendum through "www.ireps.gov.in" 15 days prior to the tender closing date. For the purpose of CORRIGENDUM in the tender, NIT period is splitted as under: (a) ADVERTISEMENT PERIOD: The time during which all information pertaining to tender shall be available but offers cannot be submitted (b) OFFER SUBMISSION PERIOD: 15 days prior to closing of tender, during which tenderers can submit their offer.
Tenderer(s) shall note that conditional/alternate offer will not be considered and will summarily be rejected, even though such condition makes them as the lowest tenderer.
Applicable for the tenders with eligibility criteria: The offer of Tenderer(s) who do not enclose Work Experience Certificate & Financial eligibility Certificate with requisite details, and supporting documents along with their Tender to establish their credentials shall be summarily rejected, even though they are working contractors or contractors on approved list.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
The offer shall be evaluated only from the certificates/documents submitted along with the tender offer.
Railway reserves the right to verify the authenticity of the documents/information furnished.
REQUEST FOR PROPOSAL for the "Construction of New BG 4th line from Chainage 39.998 Km to Chainage 61.494 Km between Guduvancheri (Incl.) & Chengalpattu (Incl.) stations (Package- II) for Civil Engineering, Signalling & Tele communication, Electrical General and 2x25 KV OHE Electrification works, including Utility shifting between Tambaram and Chengalpattu"
CAO-CN-MS-EPC-MT-03-2026~SR
CAO-CN-MS-EPC-MT-03-2026
Open
Works - General
730 Days
Chennai, Tamil Nadu
₹0
₹5.5 Cr
7 Oct 2026
7 Oct 2026
9 Nov 2026
6 items across 6 schedules · ₹8,53,24,553 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | Utility Shifting - S & T | Lumpsum | 1.00 | 1,45,31,711 | 1,45,31,711 |
| Schedule total | ₹1,45,31,711 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
3phasemeteringbunkwith125ASDB.pdf
ATTACHMENT
3phasemeteringbunk.pdf
ATTACHMENT
Bracketformountingwatertightfluorescentfittingandallotherstreetlighttypefittings.pdf
ATTACHMENT
cablerouteindicaterRCCtype.pdf
ATTACHMENT
castirontypecablerouteindicater.pdf
ATTACHMENT
concretefoundationforoctogonalpoles-6m.pdf
ATTACHMENT
emergencyfeedandbatterychargingterminalboard.pdf
ATTACHMENT
EnclosureforEFT.pdf
ATTACHMENT
Erectionofcutrailpost.pdf
ATTACHMENT
Excavationofforcabletrench.pdf
ATTACHMENT
lampstandardpostnameboardtype.pdf
ATTACHMENT
layingofCIRCCHDPEpipe.pdf
ATTACHMENT
LTCablesloopingBox.pdf
ATTACHMENT
LTearthingarrgts.pdf
ATTACHMENT
mountingbracketforbatterycharger.pdf
ATTACHMENT
MSAUbracketforwiringinShelter.pdf
ATTACHMENT
Rolinginexaminationarrgts.pdf
ATTACHMENT
singlephasemeteringbunk.pdf
ATTACHMENT
SPSSPTSSdrawingcompressed.pdf
ATTACHMENT
ChengalpattuESP.pdf
ATTACHMENT
GuduvancheryESP.pdf
ATTACHMENT
KattangulathurESP.pdf
ATTACHMENT
MaraimalainagarkamarajarESP.pdf
ATTACHMENT
ParanurESP.pdf
ATTACHMENT
POTHERIESP.pdf
ATTACHMENT
SingaperumalkoilESP.pdf
ATTACHMENT
SB1EstationbuildingHaltstation.pdf
ATTACHMENT
SB3Gcrossingstation.pdf
ATTACHMENT
TBMCGL4THLINEHUTDRGFORSIGN.pdf
ATTACHMENT
SteelConditionsEPCTender1.pdf
ATTACHMENT
REFERENCEDRAWINGS.pdf
ATTACHMENT
1_TBMCGLWP29900to34900.pdf
ATTACHMENT
1_TBMCGLWS29900to34900.pdf
ATTACHMENT
2_TBMCGLWP34900to39900.pdf
ATTACHMENT
2_TBMCGLWS34900to39900.pdf
ATTACHMENT
3_TBMCGLWP39900to44900.pdf
ATTACHMENT
3_TBMCGLWS39900to44900.pdf
ATTACHMENT
4_TBMCGLWP44900to49900.pdf
ATTACHMENT
4_TBMCGLWS44900to49900.pdf
ATTACHMENT
5_TBMCGLWP49900to54900.pdf
ATTACHMENT
5_TBM-CGLWS49900to56900.pdf
ATTACHMENT
6_TBMCGLWP54900to61400.pdf
ATTACHMENT
6_TBM-CGLWS_56400to61400.pdf
ATTACHMENT
1_CGLSIP.pdf
ATTACHMENT
MJBRatCH_41239_BridgeNo_124.pdf
ATTACHMENT
MJBRatCH_57855_BridgeNo_165.pdf
ATTACHMENT
RCCductforSTcable.pdf
ATTACHMENT
REFERENCEDRAWINGSandDOCUMENTS.pdf
ATTACHMENT
EPCDOCUMENT.pdf
ATTACHMENT
RFPDOCUMENT-TBM-CGL.pdf
ATTACHMENT
CableLayinginDucts.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .