Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.5 LAdmitted-Finance 00 PASHU CHIKITSALAYA PAKHRAULI UNNAMED ROAD PAKHARAULI SULTANPUR UTTAR PRADESH 228001 | SULTANPUR | UTTAR PRADESH | 228001 | -11.15% | ₹3.5 L | L1 | Admitted-Finance |
| 2 | L2₹3.8 L+₹30,927.04 (8.88%)Admitted-Finance | -3.26% | ₹3.8 L+₹30,927.04 (8.88%) | L2 | Admitted-Finance |
Tender Value
₹3.9 L
EMD Value
₹7,840
Closing Date
25 Jun 2026, 6:00 pmClosed
SPD RCScE Jaipur
RCScE JLN Marg Jaipur
(274) Major repair work GUPS No 03 Takhatgarh Block Sumerpur
2026_RCSCE_567647_82
Nit 03 civil 2026-27
Open Tender
Civil Works - Buildings
Percentage
PALI
Please Refer Bid Document
7 documents required · 7 mandatory
₹1,000
Yes
ADPC SMSA PALI/ MD RISL Jaipur / Egrass Challan PD
₹7,840
Yes
20 Jul 2026
16 Jun 2026
29 Jun 2026
16 Jun 2026
25 Jun 2026
16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A Civil Work | |||||
| 1.01 | Replacing broken roofing slab in patches including lime terrace, ceiling plaster etc. including removal of broken slabs. | 6 | Sqm | 1,844 | ₹11,064 |
| 1.02 | Replacement of stone Chajja with sriwan in damaged portion as per existing thickness and width in CM 1 : 3 with removal of old damaged pieces of chajja including top plaster of chajja and bottom pointing in CM 1 : 3 with scoffolding upto Ground floor level as per direction of Engineer in charge | 1.8 | Sqm | 2,820 | ₹5,076 |
| 1.03 | Dismantling stone slab/ terrazo chip flooring laid in cement mortar including stacking of serviceable material and disposal of unserviceable material within 50 meters lead. | 280 | Sqm | 80 | ₹22,400 |
| 1.04 | Dismantling old plaster or skirting, raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 meter lead. | 203.04 | sqm | 15 | ₹3,045.6 |
| 1.05 | Pointing on stone masonry in cement sand mortar 1:3 (1 cement : 3 sand) : Flush / Ruled/ Struck or weathered pointing. | 141.84 | sqm | 80 | ₹11,347.2 |
| 1.06 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 2.78 | Cum. | 3,479 | ₹9,671.62 |
| 1.07 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 4.86 | cum | 178 | ₹865.08 |
| 1.08 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 0.81 | cum | 3,302 | ₹2,674.62 |
| 1.09 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand) | 6.23 | cum | 2,838 | ₹17,680.74 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 9.45 MB
Tendernotice_2.pdf
PDF • 9.64 MB
Tendernotice_3.pdf
PDF • 0.53 MB
Tendernotice_4.pdf
PDF • 0.42 MB
Tendernotice_5.pdf
PDF • 0.15 MB
BOQ_1010384.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .