Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC NO 5 8TH STREET KALAINGAR NAGAR THIRUVOTTIYUR CHENNAI 600 019 | CHENNAI | CHENNAI | TAMIL NADU | 600019 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹8.0 L+₹1,034 (0.13%)Rejected-AOC | L2 | Rejected-AOC Rejected | |
| 3 | L3₹8.7 L+₹71,329.50 (8.91%)Rejected-AOC | L3 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹10,100
Closing Date
5 Sept 2024, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 24 25 BM Dn Unit I ESP Inlet C D Pass Dismantling and Renewal of new splitter plate assembly in ESP C D pass inlet funnel attending flue gas duct patch welding work in ESP inlet funnel during annual overhaul
2024_EB_476020_1
CE SE MI NCTPS I 152 24 25
Open Tender
Power/Energy Projects/Products
Works
20 days
Work
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,100
Yes
21 Apr 2025
23 Aug 2024
6 Sept 2024
23 Aug 2024
5 Sept 2024
23 Aug 2024
Amount
MS Plate 8 mm thick, Sail Hard / equivalent including Loading, transportation & Unloading. Manufacture test certificate shall be furnished. I-Material portion under Contractor scope: The contractor should inspect the site in overhaul to ascertain the actual requirement of Iron & Steel material and as per the direction of Engineer in charges) (The material will be supplied by TANGEDGO if available at stores during execution of works)
Charges for providing scaffolding arrangement at flue gas duct ESP inlet. Including cost of consumables and T&P’s.
Charges for Dismantling of Damaged 02 No. of Splitter assembly in flue gas duct ESP inlet. This work involves arresting, cutting, leading and removal of eroded plates and devolution of scraps to stores, including cost of consumables and T&P’s.
Charges for Fabrication of 02 No. Splitter assembly & Flat in M.S.Plate for splitter assembly in flue gas duct ESP inlet as per drawing. Including Transport, cost of consumables and T&P’s.
Charges for Erection, testing & commissioning of 02 No. Splitter assembly in flue gas duct ESP inlet as per drawing. The work involves leading, lifting, fixing and full welding including cost of consumables and T&P’s.
Labour charges for welding eroded initial welding joints in flue gas duct at ESP inlet as per drawing, including cost of consumables and T&P’s.
MOHAN AGENCIES (BID ID -1129011)
ATHMIKA ENTERPRISES (BID ID -1129169)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .