| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 LAccepted-AOC | ₹1.4 L Quoted ₹1.7 L | L1 | Accepted-AOC Award of work |
| Sl No | Description | Qty | Unit | SADAIYANDI L1 |
|---|---|---|---|---|
| 1.00 | Soil Investigation by augar upto the depth of 10m or upto refusal strata where N-value is obtained 50/100 whichever met earlier. Conducting penetration test at the change of layer and as specified interval of 1m to 1.5m, carrying out lab test as per IS standards, providing report with recommendation for foundation including mobilization, demobilization, shifting from location to location, water charges for drilling etc., complete with submission of two sets of report for one bore hole. | 2 | Loc | 63,000 ₹1.3 L |
| 2.00 | Designing of Control room footing for required depth, type of footing, dimension of footing, Detailing of reinforcement etc according to the soil investgation report including preparation and submission of design report 3 sets for approval, etc., complete | 1 | Loc | 15,000 ₹15,000 |
| 3.00 | SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | LS | 9 ₹12,690 |
| 4.00 | CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only | 1 | LS | 9 ₹12,690 |
| 5.00 | Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only | 1 | LS | - |
Tender Value
Refer Docs
EMD Value
₹1,500
Closing Date
18 Feb 2026, 12:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Conducting soil Investigation design of footing for the Control room proposed E. Kumaralingapuram
2026_EB_656218_1
SE/GCC/Madurai F. Specn. No.069/2025-26
Limited
Civil Works
60 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,500
22 May 2026
12 Feb 2026
19 Feb 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
Soil Investigation by augar upto the depth of 10m or upto refusal strata where N-value is obtained 50/100 whichever met earlier. Conducting penetration test at the change of layer and as specified interval of 1m to 1.5m, carrying out lab test as per IS standards, providing report with recommendation for foundation including mobilization, demobilization, shifting from location to location, water charges for drilling etc., complete with submission of two sets of report for one bore hole.
Designing of Control room footing for required depth, type of footing, dimension of footing, Detailing of reinforcement etc according to the soil investgation report including preparation and submission of design report 3 sets for approval, etc., complete
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_786891.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid