| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.3 LAccepted-Finance | ₹45.3 L | L1 | Accepted-Finance Due to L1 |
| 2 | L2₹50.3 L+₹4.9 L (10.9%)Rejected-Finance SARAT CH SWAY AT DIPINENTA P O NIMAPARE PIN 752106 DIST PURI | PURI | ODISHA | 752106 | ₹50.3 L+₹4.9 L (10.9%) | L2 | Rejected-Finance Due to L2 |
| 3 | L3₹51.0 L+₹5.7 L (12.5%)Rejected-Finance | ₹51.0 L+₹5.7 L (12.5%) | L3 | Rejected-Finance Due to L3 |
| 4 | L4₹56.6 L+₹11.3 L (25.0%)Rejected-Finance | ₹56.6 L+₹11.3 L (25.0%) | L4 | Rejected-Finance Due to L4 |
| 5 | L5₹57.8 L+₹12.5 L (27.5%)Rejected-Finance AT SALAGADIA PO MAJHIGADIA VIA PS KAPTIPADA DIST MAYURBHANJ | ₹57.8 L+₹12.5 L (27.5%) | L5 | Rejected-Finance Due to L5 |
Tender Value
₹70.8 L
EMD Value
₹70,800
Closing Date
11 May 2026, 1:00 pmClosed
Superintending Engineer
O/o the SE, Kendrapara Irr. Division, Kendrapara
Canal improvement
2026_KIRRD_128654_5
e-Procurement Notice No.KID-01 of 2026-27
National Competitive Bid
Civil Works - Canal
Percentage
180 days
Kendrapara
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
₹70,800
Yes
21 Aug 2026
30 Apr 2026
12 May 2026
30 Apr 2026
11 May 2026
30 Apr 2026
30 Apr 2026 - 6 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation and plinth including dressing & leveling the bed and depositing the excavated materials away from the work site with all leads, lifts & delifts etc. complete as per direction of the Engineer-in-charge. | 790.04 | One Cum. | 206.1 | ₹1,62,827.24 |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost, carriage, royalty and all other taxes of materials etc. complete as per direction of the Engineer-in-charge. | 179.45 | One Cum. | 849.5 | ₹1,52,442.78 |
| 3 | Cement concrete (M-15) with 40mm size hard granite crusher broken Metal of approved quarry including hoisting,laying hire charges of concrete mixture, niddle vibrator, plate vibrator, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. | 176.81 | One Cum. | 5,721 | ₹10,11,530.01 |
| 4 | CC (M-20) with 20mm & down graded size hard granite crusher broken Chips of approved quarry including hoisting,laying hire charges of concrete mixture, Generater with transportation of material & machineries to the site including dewatering & cost, carriage, royalty and all other taxes of materials with curing for a required days etc. complete as per direction of the Engineer-in-charge. | 681.42 | One Cum. | 6,076.6 | ₹41,40,716.77 |
| 5Rigid smooth centering & shuttering for CC/RCC works (Cut off and Raft) including false work and dismantling them after casting including cost, carriage and all other taxes of materials to the site of work etc. complete as per direction of the Engineer-in-charge. | |||||
| 5.01 | Base of Column, Foundation, Plinth Band, Footing, Mass concrete etc. | 2,241.12 | One Sqm | 248.9 | ₹5,57,814.77 |
| 6 | Earth work in all kinds of soil excluding sand or sandy soil with mechanical carriage 5 k.m lead including rough dressing and benching old embankment and breaking clods 5cm to7 cm laying in layers not exceeding 0.30m depth. As per direction of Engineer-in -charges.( Royality shall be deduct from earth filling section )(Measurement to be taken on the finished compacted section & Earth shall be arranged by the contractor at his own cost & risk ) | 834.16 | One Cum. | 189 | ₹1,57,656.24 |
| 7 | Providing laying spreading & compacting stone aggregates of Grade-I metals of 90mm to 45mm size to water bound macadam specifications for compacted thickness of 100mm using 1.21 cum of metal 0.27 cum of stone screened dust & 0.08 Cum of binding materials for 10 sqm including spreading in uniform thickness, hand packing rolling with 3-wheeled steel roller 8-10 tones in stages to proper grade & camber applying & brooming crusher dust & binding materials to fill up the interstices, watering & compacting to proper density as per clause 404 of MoSRT & H specificationfor Road & Bridge works (4th revision) includingcost conveyance,royality & GST of all materials to all materials to work site etc complete as per direction of the Engineer in charge. | 63 | One Cum | 3,575 | ₹2,25,225 |
| 8 | Providing & laying, spreading and compacting IRC Grade-III 53 mm - 22.4 mm metal to WBM specification including spreading in uniform thickness of 100 mm compacting to 75 mm, hand packing, rolling with three wheeled steel roller 8-10 ton in stages to proper grade and camber aggregates, watering & compacting to required density as per clause 404 of MORTH specification including cost, conveyance, royality, taxes all labour charges, hire & running charges of PRR etc. complete as per the direction of Engineer-in-Charge. | 47.25 | One Cum. | 3,753.5 | ₹1,77,352.88 |
| 9 | Providing and laying stone screen dust for sub-base in layers not exceeding 225mm watering & compacting to the required density in OMC with PRR including cost,conveyance,royality & GT of all materials to work site as per the specification and direction of Engineer-in-Charge. | 141.75 | One Cum | 1,852.4 | ₹2,62,577.7 |
stage.html
html • 0.14 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.30 MB
TechBidKID_05.pdf
Tender Documents • 2.36 MB
BOQ_589212.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .