Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC AT KARGALI BAZAR BOKARO DIST BOKARO PIN 829104 | BOKARO | BOKARO | JHARKHAND | 829104 | L1 | Accepted-AOC L1 bidder is techno commercially qualified. | |
| 2 | Rejected-Technical AT BERMO PO PHUSRO DIST BOKARO JHARKHAND | BERMO | BOKARO | JHARKHAND | - | Rejected-Technical Bid not be opened as per NIT terms | |
| 3 | Rejected-Technical MAIN ROAD PHUSRO P O DHORI DIST BOKARO JHARKHAND | PHUSRO | BOKARO | JHARKHAND | - | Rejected-Technical Bid not be opened as per NIT terms |
Tender Value
₹8.3 L
EMD Value
₹10,400
Closing Date
7 Sept 2024, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (ENM)
Office of the General Manager, Dhori Area
Repair, maintenance of SDL
2024_CCL_315837_1
GM(D)/SO(EnM)/DA/2024-25/29
Open Tender
Miscellaneous Works
Item Wise
21 days
Dhori (K), Dhori Area
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,400
23 Sept 2024
26 Aug 2024
9 Sept 2024
27 Aug 2024
7 Sept 2024
27 Aug 2024
27 Aug 2024 - 30 Aug 2024
Amount
Part A1: Bucket
Old and damaged bucket cutter plate removing by cutting by industrial gas cutting set. (Long 2100 mm x wide 350mm &
Old and damaged chain supporting plate removing by cutting by industrial gas cutting set both side (Upper & Lower).
S.S. bucket cutter plate new replacement & providing of SDL machine (Long 2100mm x wide 350 mm)
S.S. 12mm plate replacement & fabrication shape and size (Long- 2100 mm x wide 300mm)
New S.S. cutter plate fitting, fixing and S.S. full welding both side. (Upper and Lower)
Bucket chain supporting plate fitting, fixing and S.S. full welding.
Fabrication of bucket arm pin new making by machining. (Head 200 mm x Long 250 mm x dia 125mm.
Arm bush new replacement and fitting in SDL machine arm.
Bucket coal discharge gate repairing plate changing, cutting & welding both side.
Full bucket supporting making by cutting industrial gas cutting set & fitting, fixing with S.S. electrode welding.
S.S. electrode
Part A2: Upper Deck
Upper deck Arm place both side pin seat damaged, oval and worn out portion repairing and rectification with the help metal filling by special welding electrodes as required up to roundness and after welding re- shaping by grinding/machining as per pin size both side.
Lift cylinder place both side pin seat damaged, oval & worn out portion repairing & rectification with the help of metal filling by special welding electrodes as required up to roundness & after welding re- shaping by grinding as per pin size & also making required size, distance ring 02 Nos. & welding with both side of lifting cylinder pin place with centre & alignment and also making locking arrangement of pin both side.
EN- 9 steel bush new making as per sample size.
Lift cylinder worn out pin welding by special electrodes then machining as per original shape .
Upper deck bodies broken bolts removing by drilling.
Over size new thread making by tapping.
Press lock plate new making as per size 90 X20 X 8mm.
Lift cylinder opening and fitting in mounting and upper deck arm assy.
Part A3: Track drive gear box both side
Repairing of damaged gear bearing housing in round welding and machining as per original shape and size (Part No. EEA0021922)
Repairing of its cover assly damaged mtg. holes threads new making by oval hole closing by material filling and machining outer face and new thread making as per 22 mm size (part no. EEA0021913)
Reduction gear assembly repairing by worn out teeth material filling in round and teeth making in original shape by milling machine.
Replacement of its seal (part no. EEA0021916)
Gear box bolt new replacement and fitting.
Part A4: Hydraulic traction motor assy. RH side
Providing and fixing of shaft.
Providing and fixing of seeger.
Providing and fixing of ring spacer shim.
Providing and fixing of spacer bearing.
Replacement of screw.
Providing of piston complete.
Replacement of shaft seal kit.
Repairing of protection cover.
Repairing of threaded rod.
Replacement of bushing setting screw.
Complete opening overhauling and reassembly.
Repairing of oil cooler.
Front idler repairing overhauling.
Part B1: Bucket
Old and damaged bucket cutter plate removing by cutting by industrial gas cutting set. (Long 2100 mm x wide 350mm &
Old and damaged chain supporting plate removing by cutting by industrial gas cutting set both side (Upper & Lower).
S.S. bucket cutter plate new replacement & providing of SDL machine (Long 2100mm x wide 350 mm)
S.S. 12mm plate replacement & fabrication shape and size (Long- 2100 mm x wide 300mm)
New S.S. cutter plate fitting, fixing and S.S. full welding both side. (Upper and Lower)
Bucket chain supporting plate fitting, fixing and S.S. full welding.
Fabrication of bucket arm pin new making by machining. (Head 200 mm x Long 250 mm x dia 125mm.
Arm bush new replacement and fitting in SDL machine arm.
Bucket coal discharge gate repairing plate changing, cutting & welding both side.
Full bucket supporting making by cutting industrial gas cutting set & fitting, fixing with S.S. electrode welding.
S.S. electrode
Part B2: Upper Deck
Upper deck Arm place both side pin seat damaged, oval and worn out portion repairing and rectification with the help metal filling by special welding electrodes as required up to roundness and after welding re- shaping by grinding/machining as per pin size both side.
Lift cylinder place both side pin seat damaged, oval & worn out portion repairing & rectification with the help of metal filling by special welding electrodes as required up to roundness & after welding re- shaping by grinding as per pin size & also making required size, distance ring 02 Nos. & welding with both side of lifting cylinder pin place with centre & alignment and also making locking arrangement of pin both side.
EN- 9 steel bush new making as per sample size.
Lift cylinder worn out pin welding by special electrodes then machining as per original shape .
Upper deck bodies broken bolts removing by drilling.
Over size new thread making by tapping.
Press lock plate new making as per size 90 X20 X 8mm.
Lift cylinder opening and fitting in mounting and upper deck arm assy.
Part B3: Track drive gear box both side
Repairing of damaged gear bearing housing in round welding and machining as per original shape and size (Part No. EEA0021922)
Repairing of its cover assly damaged mtg. holes threads new making by oval hole closing by material filling and machining outer face and new thread making as per 22 mm size (part no. EEA0021913)
Reduction gear assembly repairing by worn out teeth material filling in round and teeth making in original shape by milling machine.
Replacement of its seal (part no. EEA0021916)
Gear box bolt new replacement and fitting.
Total impact of GST for the purpose of CTC
M/S NEW BIHAR MOTOR GARAGE
M/S HINDUSTAN ENGINEERING WORKS
techsummary_327302.pdf
PDF • 0.18 MB
finsummary_327302.pdf
PDF • 0.18 MB
Wo29.pdf
PDF • 1.90 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .