Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.8 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹38.2 L+₹7.4 L (24.0%)Rejected-AOC 301 A WINGH AZIZ APARTMENT WAZI MOHALLA OLD PANVEL NAVI MUMBAI 410 206 | NAVI MUMBAI | RAIGAD | MAHARASHTRA | 410206 | L2 | Rejected-AOC Rejected | |
| 3 | L3₹39.2 L+₹8.4 L (27.4%)Rejected-AOC 67 A HAFIZALI BAHADUR KHAN MARG SURAJI COMPOUND BEHIND KHATAU MILL BYCULLA W MUMBAI 400011 BRITE INDUSTRIES 67 A HAFIZALI BAHADUR KHAN MARG SURYAJI COMPOUND BEHIND KHATAU MILL MUMBAI | MUMBAI | MAHARASHTRA | 400011 | L3 | Rejected-AOC Rejected |
Tender Value
Refer Docs
EMD Value
₹74,460
Closing Date
1 Mar 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE KARANJA
CWE KARANJA NAVL STATION KARANJA URAN RAIGAD-400704
PROVISION OF AC FOR NAI BLDG NO 573 AND NEW NAVAL ADVANCE INSPECTION CENTRE BLDG AT NAVAL STATION KARANJA
2021_MES_422828_1
84009-K/E8
Limited
Miscellaneous Works
Item Rate
180 days
NAVAL STATION KARANJA
Please refer tender documents
4 documents required · 4 mandatory
₹500
CWE KARANJA
₹74,460
Yes
26 Apr 2021
16 Feb 2021
3 Mar 2021
16 Feb 2021
1 Mar 2021
22 Feb 2021
60 days
Amount
Designing, supplying, installing, testing and commissioning of chilled water type central air conditioning plant of capacity 25 TR (Approx)- 12.5 TR (02 Nos working and 01 No standby) with all equipments and accessories complete and comprising of the following :-
(a) Three Nos of water cooled chiller unit factory assembled with nominal cooling capacity appox. 12.5 TR
Intelligent:- Microprocessor control to ensure ease of operation significant power saving to reduced maint cost and lower instance of break downs. (a) Digital setting of temp levels enable setting of defined tempeture level accurately to ensure optical cooling and significant power saving .
(b) Auto distribution load to ensure when the air condition is less than full capacity of the chiller microprocessor automatically to keep on the required compressor on and switch off rest. Moreover controller ensures all compressors evenly switched ON or OFF at regular interval on to ensure efficient running of the chiller and ensure equal load on compressor.
(c) Protection mechanism:- The controller to protect the compressor from accidental phase reversal or single phasing errors .In built anti freezer protection ensure cutoff before freezing point to ensure lower instances of breakdown.
(d) Non volatile memory:- all setting on the controller are stored in the non volatile memory and stop through power failure for avoiding the need to reset the parameters after every power failure.
(e) Self diagnostics: - to help on identifying fault very quickly .technical fault can be detected and displayed on the controller to make trouble shooting simple.
{f) Auto start:- The controller restart automatically with its original setting after the restoration of power supply
(i) Three Nos scroll compressor hermatically sealed units using R - 407C refrigerant complete with suction and discharge shut off valves, automatic capacity control with the thermostats and solenoid valves, built in suction strainer, oil pump, hot gas muffler, heat wheel, oil pressure, safety switch etc all as specified. (Make: Kirloskar/Blue Star/Carrier)
(ii) Three Nos shell and tube type water cooled condenser with fouling factor 0.00025 F ft2 hr/Btu and Min rate of flow of water 51.33 USGPM ,water inlet/outlet temp As per OEM standard MS Shell and integrally finned copper tubes complete with safety valve, drain valve, water inlet and out valves, hot gas inlet and liquid outlet isolating valves, thermometer and pressure gauges at water inlet/outlet and purge valve all as specified.
(iii) Three Nos shell and tube type DX chiller with thermal insulation, temperature of water entering the chiller 12.2 deg C, temperature of water leaving of the chiller 6.7 deg C, including refrigerant inlet and outlet connections with isolating valves, expansion valves, water inlet and outlet valves, temperature and pressure gauges at water inlet and outlet, drain and vent, stop valves complete all as specified..
(iv) Three Nos stands fabricated out of MS channel/angle of suitable size for mounting compressor, motor, and condenser.
(v) Three set of neoprene rubber anti-vibration ribbed pads with MS channel in foundation etc complete as per manufacturer's instructions for installation of the plant.
(vi) Necessary mild steel heavy duty refrigerant piping for suction and discharge lines and copper piping for liquid line complete with fittings valves etc.
(vii) First charge of R - 407C refrigerant and Compressor oil for the complete plant.
(viii) Bright annealed copper heavy duty refrigerant piping for suction, discharge and liquid line compete with fitting valves. suction line should be insulated.
(b) Condenser water cooling arangement comprising of the following :-
(i) Three Nos EEC Series (Engery efficient) monoblock centrifugal condenser cooling water pumping sets of Make: Kirloskar/ Groundfoss/ Mather & Platt / Beat & Crompton (Beacon) of suitable capacity not less than 3 HP to achieve desired dishcarge and head alongwith necessary valves in suction and delivery line each of 50% capacity (02 Nos working and 01 Nos Standby) and suitable for operation on 3 phase 50 cycles, 415 volts AC supply along with hydraulic vane type water meter for flow measurement and providing a pressure gauge in each pump set of suitable capacity including suitable foundation with neoprene rubber anti vibration ribbed pads all as specified.
(ii) One No Single Cell type corrosion resistant, fire retardant, FRP induced draft, rectangular type counter flow cooling tower of capacity 120% of plant running capacity with maximum allowable temperature 50 degree centigrade, drift loss 0.005% of water circulation of Make: Mihir/ Paharpur/ Kirloskar/ Blue star/ polo/ Delta/ Advance with suitable foundation and float valve of suitable size and make up PVC three layered, closed lid, cylindrical shaped, ISI marked water tank of 5000 Ltrs capacity, (of Syntex Company ) mounted on suitable stagging as specified
(iii) One lot of condenser water piping of MS 'C' Class piping as per IS-1239 from make up tank to cooling tower, from cooling tower to condenser and return complete with fittings, valves, pot strainers etc.
(c) Chilled water circulation arrangement comprising of the following :-
(i) Three Nos monoblock centrifugal pumpsets of Make: Kirloskar/ Groundfoss/ Mather & Platt / Beat & Crompton (Beacon) of suitable capacity not less than 2 HP for circulating chilled water alongwith necessary valves in suction and delevery line each of 50% capacity (02 Nos working and 01 Nos Standby) and suitable for operation on 3 phase 50 cycles, 415 volts AC supply, along with one number pressure gauge in each pump set of suitable capacity including suitable foundation with neoprene rubber anti-vibration ribbed pads all as specified.
(ii) Chilled water piping :- (a) A lot of MS 'C' class piping , ISI marked pipe of Make Tata/ Jindal with all fittings such as bends, elbow, tees, reducers, tees supports, flow indicators etc of suitable sizes as per site requirement to maintain the continuous and constant flow of chilled water from chiller unit to AHUs so that designed conditions can be met with.The chilled water pipe line network shall be laid under ground , above ground, floor, roof, a long wall etc. chilled water pipe line shall be insulated with EPS section of 50mm thickness with and including applying bitumenous compound and AL cladding with 27 gauge AL sheet to avoid the heatloss including water pipe line. Bidder shall ensure the quality of line insulation and adequate insulation be provided so that chilled water temperature of 8-9Degree celcius can be maintained at AHUs inlet point.
(b) A lot of butter fly valve, gate valve, sluice valve in chilled piping network to maintain required flow in each branch line as per approved layout diagram
(iii) Condensate water drain piping with GI pipe-B class conforming to IS:1239 of suitable size including all fittings like anchor fasteners, couplings, bends, elbows, tees, thrust, blocks, wooden blocks, flanges, welding as required including insulation as specified.
(iv) Chilled water make up ISI marked, three layered, closed lid, cylindrical shaped tank of syntex company having capacity 1000 ltrs and thermally insulated with 50 mm thick EPS TF quality sheet of suitable sizes having density not less than 24 Kg/ Cu.m , thermal conductiivity 0.334 w /MK at '0' degree centigrade of Make : Beard Sell or equivalent in Mag Hard insulator/ Zenith/ Modi with protecting covering of 25 gauge aluminium cladding and supporting piping connections, valves, fittings etc all as directed and specified.
(c) One Nos Air handling unit of Make: Edgetech/ Zeco/ Citizen/ VTS with not less than 11000 dehumidified air CFM ,static pressur 50mm WG suitable capacity with chiller unit of sectionalised construction, factory made double skinned six row deep cooling coil and 50 mm TSP complete with all accessories controls etc as per OEM specifications and comprising :-
(i) Cooling coils of copper tube with aluminium fins.
(ii) Prefilter, plenum and fire dampers in the supply air duct.
(iii) Heating Kits, strip type arranged in banks of 19KW to serve as relative humidity control of conditioned space including providing switchgears, accessories, measuring devices, etc all as specified and directed complete with controls.
(iv) Blowers for AHU complete with suitable electric motor, TEFC squiral cage induction motors for operation on 415 Volt, 3 phase, AC supply, with V Belt and belts guard
(v) Insulation of AHUs all as specified.
(d) 01 Lot of air distribution system comprising of supply air ducts from AHU to all conditioned space and return air duct as per site requirement from conditioned space to AHU's etc including providing insulation to avoide condensation and effective designed condition in air conditioned space of all building including interconnectors as required from AHU to the conditioned space comprising of 120GSM galvanised sheet with suitable supporting arrangements and bracing, supply / return/ fresh air grilles on sheet metal frame work duly painted /finished to match with the exisiting ceiling. Fire dampers operated with fusiable link shall be provided.The supply air/return duct running outside the air conditioned space shall be insulated XLPE insulation with factory laminated aluminium foils as directed by Engr-in-Charge. NOTE:(i) The AC Duct drawing shall be produced for approval of Accepting Officer before fabrication of AC Duct work. (ii) The bidder should submit duct layout as directed by Engr-in-Charge during work site visit.
(i) Supply and return air duct shall be manufactured as per IS 655:2006
(ii) Supply air and return air duct shall be insulated outside the air conditioned spaces with XLPE factory laminated aluminium foil. Make Supreme/Aflex/Kflex.
(iii) Under deck insulation shall be 50mm thick TF quality termocol insulation covered with GI wire mesh will be provided as directed by Engr-in-Charge whereever required as per site requirement.
(e) AHU Control panel - one Nos cubical wall mounted, indoor LT panel, dust and vermin proof factory fabricated, CPRI approved, made out of not less than 2 mm thick CRCA sheet and powder coated, suitable for operation on 3 phase 50 Hz, 415 volts, including internal wiring with 1100 volts grade single core, PVC insulated, FRLS, multistranded copper conductor cables of suitable current carrying capacity complete and comprising of the following accessories :-
(i) One set of 200 Amps rated copper bus bar suitable for 3 phase 4 wire, 415 volts mounted on PVC/ hygroscopic insulators and PVC colour coded Sleeves of R,Y, B and green colour complete arranged in separate compartment. -01 set.
Description of items of work (i) Incoming Main MCCB FP, 63 Amps 35KA at 415 vots -01 No
(iii) Outgoing MCCB, TP, 25 Amps, 25 KA, 415 volts - 01 Nos (For heater bank)
(iv) Outgoing MCCB, TP, 25 Amps, 25 KA, 415 Volts - 01 No (For AHU motor)
(v) LED Phase indicating lamps RYB - 01 Set for each outgoing and incoming connection.
(vii) Single phase preventor for motors.
(f) Main Control Panel : Each Job- 01 No Supplying, fixing, testing and commissioning, cubical, floor mounted, indoor, LT panel, CPRI approved dust and vermin proof made out of not less than 2mm thick CRCA sheet and 50X50X6 mm angle iron frame, powder coated, suitable for operation on 3 phase 50 Hz, 415 volts, including internal wiring with 1100 volts grade single core, PVC insulated, FRLS, multistranded copper conductor cables of suitable current carrying capacity complete and comprising of the following accessories :-
(i) One set of 250 Amps rated copper bus bar suitable for 3 phase, 4 wire, 415 volts system mounted on PVC/ hygroscopic insulators and PVC colour coaded sleeves of R, Y, B and green colour, complete arranged in seperate compartment - 01 Set
(ii) Incoming MCCB FP 200Amps 415 volts 35 KA with thermal and magnetic release -01 No
(iii) Outgoing MCCB TP 63Amps 415Volts 25KA with thermal and magnetic and overload release-01 No (For AHU room after for compressor)
(iii) Outgoing, MCCB TP, 40 Amps, 35 KA at 415 Volts with fix thermal magnectic release and overload) - 04 No (For Compressor)
(iv) Outgoing MCCB TP, 25 Amps, 25 kA at 415 Volts with fix thermal magnetic release and adjustable overload -09 Nos (For CT Fan motor and condenser pumps, chiller pumps).
(vii) Digital KWH (Energy) meter, Tamper proof, 3 phase, 415 Volts, 50Hz, CT operated of not less than 200 Amps Capacity - 01 No.
(viii) LED Phase indicating lamps RYB for incoming and each outgoing circuit connection.
(x) Fully automatic, star-delta /DOLstarter having protection against single phasing, under voltage, overvoltage, short circuit current for all motors.
NOTE : - (i) Main LT pannel shall be installed in AC plant Room. (ii) The provision of inter locking wiring between compressor motor, condenser pump, AHU, cooling tower, chiller pumps, thermostats, solenoid switch shall be provided. (iii) The electric connections from main LT pannel to each devices such as motors, AHU, compressor etc shall be proviced by XLPE insulated, multistranded , 1100 volts grade copper conductor cable of adequate sizes. The cables shall run over the cable tray made of GI sheet of not less than 1.6 mm thick provided with fasteners, hangers etc as per the engr-in-charge directions . (iv) LT pannel shall be compartmentalised comprising of cable gallaries, busbar chamber, compartment for each MCCB/MCB/ Starter etc duly marked with connected machineries etc.
(v) Any civil work involved in installation of panel board deemed to be included in item rate.
(vi) Engineer- in- Charge shall ensure that panel shall be manufactured as per approved drawing only. Contractor shall arrange inspection for panel at factory premises before dispatch. The inspection shall be carried out by the nominated representative of Accepting Officer. (vii) The contractor shall submit the constructional / general arrangement drawing for approval of GE
(viii ) Masonary work connected with the installation of plant, excavation for laying of pipe line, foundation for cooling tower and other equipments, cutting holes and making good the same etc.
(ix) Controls and instruments such as thermostats, humidistats, airstats solenoid valves etc for fully automatic operation of the plant.
(x) Digital temperature and RH measuring sensor and RH & temperature control shall be installed in AHU room and in all air conditioned rooms where AC is provided. The RH and temperature control shall ensure fully automatic operation of compressors and loading / undloading. The entire system shall be of Make : Honeywell / Forbes Marshal. The LCD display panel showing Temperature and Humiditywith control wiring and switches of all buildings shall be installed in AC Plant room.
(xi) Any other connected work not mentioned above but considered necessary for maintaining the designed conditions of all buildings successful installation, commissioning and operation and efficient performance of the plant are deemed to be included into scope of work and quoted rates.
(xii) By pass valve 3way shall be of make Rapid cool/Honey Well/Energy shall be provided with each AHU to by pass the chilled water circulation on attaining the desired temperature in the conditioned space.
M & L for earthing complete, with GI earth plate electrode of size 60cm x 60 cm x 6mm thick burried directly in ground (earth pit not less than 2.25 m deep below ground level) with top edge of the plate not less than 1.5m below the normal ground level connected with GI Strip 32 x 6mm by means of bolts, nuts, check nuts and washers of galvanised iron steel including necessary excavation and earth work in any type of soil , removing surplus soil to a distance not exc 50, with and including PCC chamber in PCC (1:2:4), type B1, using (20mm graded stone aggregate), having outer dimensions 60 cm X 60 cm X 60 cm and internal dimensions 30 cm X 30 cm X 30 cm, "mild steel angle iron frame" made out of MS angle iron of size 40 x 40 x 6mm thick duly painted with two coats of synthetic enamel paint over one coat of red oxide zinc chrome primer hinged with an including 10 mm thick CI cover with handle, watering arrangment with funnel internally secured with wire mesh with 20 mm dia medium grade pipe for watering, 40 mm dia light grade, GI pipe for lead protection form electrode to Test Point/ Pannels/ accessories in & including alternate layers of charcoal dust and common salt complete all as shown in electrical " Plate No 3" and connected and indicated including testing on completion- Each set -6 (02 for compressor, 02 for control panel, 02 for condenser and chiller pumps)
Notes for Earthing: (i) GI strip and necessary Gi protection pipe upto equipment (ii) The unit rate shall also includes for wire mesh, funnel, excavation, returning & filling, PCC chamber, pit, RCC Cover & test point. (iii) PCC pit shall be provided atleast 500mm away from the earth pit and not just on earth pit.
Manning and operation of chilled water type central AC plants(01 No Bldg No 573) installed against BOQ Item no 1.0 for a period of 11 months after satisfactory completion of phase I test of central AC plant in three shifts with one operator in each shift for the AC Plant i.e 0600Hrs to 1400 Hrs,1400Hrs to 2200 Hrs and 2200 Hrs to 0600 Hrs round the clock for all days including sunday and holidays etc. all as specified and as directed by GE and Engineer-in-Charge.
(a) First year (11 months after completion of phase I test)
NOTE FOR ITEM NO 01
(a) Rates quoted under col 6 for sl no 1 shall be for manning and operation complete unless mentioned otherwise.
(b) The contractor shall be responsible for periodical maintenance as per maintenance schedule attached and specified including renewal/replacement of parts fitting fixture filling of refrigerant gas etc required for smooth functioning of the plants as per manufacture's instruction.
(c) Maintenance of log sheet and all maintenance record shall be responsibility of contractor and no stationary shall be provided by Department. Format of log sheet and maintenance records etc shall be decided by GE/Engineer-in-Charge
(d)The contractor shall ensured the neat and cleanliness of all equipments installed within the premises and surrounding of AC plant room, cooling tower, water tanks, ducting, AHU rooms etc.
(e) Manning and operation of central AC plant shall be carried out round the clock in three shifts each 08 Hrs through the ITI in Ref & air conditioning qualified tradesman and the tradesman shall be in proper uniform all as directed by Engr-in-charge.
(f ) During the defect liability period, the payment of manning and operation of AC plant shall be made and comprehensive maintenance part shall be covered into the quoted rate of central AC plant (installation work) being within the defect liability period. The contractor shall keep the personnel on installation with such qualification who can operate the central AC plant as well as carryout the preventive/routine/breakdown maintenance.
AIRFRAME
BRITE INDUSTRIES
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_472265.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .