| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.8 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹89.6 L+₹9.8 L (12.3%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹90.8 L+₹10.9 L (13.7%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹1.1 Cr+₹27.9 L (35.0%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical not qualified |
| Sl No | Description | Qty | Unit | CENTURY ENGINEERING L4 | Showkat Ahmad Khan L3 | MOHMAD AMIN RAH L1 | LUCKY TRADERS CONTRACTORS AND ENGINEERS L2 |
|---|---|---|---|---|---|---|---|
| 1.00Tower Foundations | |||||||
| 2.00 | Tower Spotting and pit marking | 5 | No. | 10,000 ₹50,000 | 15,000 ₹75,000 | 6,000 ₹30,000 Lowest | 10,000 ₹50,000 |
| 3.00 | Soil investigation for determining the classification of foundations | 5 | No. | 30,000 ₹1,50,000 | 20,000 ₹1,00,000 | 6,000 ₹30,000 Lowest | 18,000 ₹90,000 |
| 4.00 | Earth excavation of foundations including all labour, T&P, all leads & lifts, dewatering, shoring and shuttering, stock piling, carriage, back filling, disposal and dressing of surplus excavated earth and & cost of borrowed good earth in following types of soil. | 1,818.5 | cum | - | 10 ₹18,185 | - | 1 ₹1,818.5 Lowest |
| 5.00 | All types of soils 30% | 545.55 | cum | 900 ₹4,90,995 | 400 ₹2,18,220 | 300 ₹1,63,665 | 240 ₹1,30,932 Lowest |
| 6.00 | Ordinary Rock 40% | 727.4 | cum | 900 ₹6,54,660 | 275 ₹2,00,035 | 400 ₹2,90,960 | 240 ₹1,74,576 Lowest |
| 7.00 | Hard rock blasting prohibited 30% | 545.55 | cum | 900 ₹4,90,995 | 275 ₹1,50,026.25 Lowest | 500 ₹2,72,775 | 300 ₹1,63,665 |
| 8.00 | Close timbering in trenches including strutting and shoring complete | 288 | sqm | 100 ₹28,800 | 250 ₹72,000 | 50 ₹14,400 | 10 ₹2,880 Lowest |
| 9.00 | Dewatering of 3 No. foundation pits 363x0.7x7x2 | 3,557 | kl | 10 ₹35,570 Lowest | 20 ₹71,140 | 30 ₹1,06,710 | 15 ₹53,355 |
| 10.00Providing & laying of concrete, cost of all material, labour T&P, leads and lifts, shoring and shuttering, form work, stock piling, curing and other associated works, including carriage both machanical and manual, | |||||||
Tender Value
₹1.1 Cr
Closing Date
8 Apr 2021, 4:00 pmClosed
Executive Engineer TLMD -7, JKPTCL
Bemina, Srinagar JK
Construction of 5 No. Tower Foundations along with Retaining Walls for Three No. tower foundations of 220kv Tap Line for LILO of one Circuit of 220kV D/c Alusteng-New Wanpoh Trans. Line for feeding 220/33kV GIS Harwan.
2021_PDD_121188_1
e-NIT No. TLMD-7/36 of 2021 Dated 23-03-2021
Open Tender
Civil Works
Lump-sum
60 days
kashmir
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,000
CD A/C No. 0367010200000182
Exempted
26 Apr 2021
24 Mar 2021
9 Apr 2021
24 Mar 2021
8 Apr 2021
24 Mar 2021
Amount
Tower Foundations
Tower Spotting and pit marking
Soil investigation for determining the classification of foundations
Earth excavation of foundations including all labour, T&P, all leads & lifts, dewatering, shoring and shuttering, stock piling, carriage, back filling, disposal and dressing of surplus excavated earth and & cost of borrowed good earth in following types of soil.
All types of soils 30%
Ordinary Rock 40%
Hard rock blasting prohibited 30%
Close timbering in trenches including strutting and shoring complete
Dewatering of 3 No. foundation pits 363x0.7x7x2
Providing & laying of concrete, cost of all material, labour T&P, leads and lifts, shoring and shuttering, form work, stock piling, curing and other associated works, including carriage both machanical and manual,
M 10 with 40mm stone aggregate
M 20 with 20mm stone aggregate
Supply, Fabrication and placement and binding of Steel Reinforcement as per drawings
Supply and fixing of Stubs including its transportation carriage of stubs and templates .
Supply of galvanized fabricated stubs & cleats D type i) Stubs D type 150x150x20mm = 3.75x4x46x5 = 3450 kgs ii)Cleats 65x65x6mm = 0.25 x6x4x65.8x5 =174 kgs
Fixing of stubs with cleats as per drawing with the help of templates including all carriages.
Stone bund in galvanized crate wire netting including cost of material, excavation and back filling
Providing & laying of concrete other than foundations including cost of all materials, labour, T&P, leads and lifts, dewatering, shoring and shuttering, form work, stock piling, carriaige, use of admixtures, curing and other associated works for protection walls.
Earthing of tower
Normal
Construction of Retaining Walls to Tower No 45B (D+3), 45C (D+0) and Tower No. 45D (D+0) of 220 KV LILO for 160 MVA, 220/33kv GIS Grid Sub Station Harwan
Earth work excation by mechanical means depth upto 1.5m including disposal of excavated earth upto 1m from cutting edge in hard rock(blasting prohibited)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-all works upto plinth level in 1:4:8 mix with 40 mm Stone agg. Including all carriages.
Random Rubble Masonry with hard stone from quary in foundation and plinth including leveling up with cement concrete 1:6:12 upto plinth level with cement mortar 1:6 including cost of material,extraction, carriages of stones and dewatering e.t.c
Ruled pointing on Stone work with cement mortar 1:3 including cost of material
Providing and laying in position cement concrete of specified grade including cost of cement,bajri and sand and the cost of centering and shuttering. In 1:2:4 mix including all carriages
Filling of excavated material behind the wall of foundations including arranging of extra filling material including all cost and carriages
LUCKY TRADERS CONTRACTORS AND ENGINEERS
Showkat Ahmad Khan
CENTURY ENGINEERING
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.21 MB
sbd.pdf
Tender Documents • 0.95 MB
BOQ_233383.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .