Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.6 LAccepted-AOC P O DHUSSARA TEHSIL AMB DISTT UNA HP | UNA | HIMACHAL PRADESH | 174301 | ₹10.6 L Quoted ₹10.7 L | L1 | Accepted-AOC L-1 |
| 2 | L2₹10.9 LRejected-AOC IND AREA ROAD TAHLIWALA TEH HAROLI DISTT UNA H P | TAHLIWALA | UNA | HIMACHAL PRADESH | ₹10.9 L | L2 | Rejected-AOC L-2 |
| 3 | L3₹11.0 LRejected-AOC CHANDRONA TEHSIL NOHRADHAR DISTRICT SIRMOUR H P | ₹11.0 L | L3 | Rejected-AOC L-3 |
Tender Value
₹10.2 L
EMD Value
₹10,199
Closing Date
21 Jan 2026, 12:30 pmClosed
Sr.Xen
Er.Rahul Puri Sr. Executive Engineer, Electrical Division, HPSEBL Haroli
Tender for Prov. for prov. 11kV HT line for newly proposed 11/0.4kV, 100 kVA s/stn at village Guglehar (Mohalla Matoli ) and for prov. 3-phase LT line extension for interlinking of newly proposed 11/0.4kv DTR with existing DTR and for replacement o
2026_HPSEB_125825_1
NO/HED-332/2025-26
Open Tender
Electrical Works
90 days
ED Haroli
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
₹10,199
20 Feb 2026
15 Jan 2026
21 Jan 2026
15 Jan 2026
21 Jan 2026
15 Jan 2026
Erection Part of 11/0.4 KV, 100 KVA Transformer (T.S no 195/2025-26)
Erection of S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, Alluminium Paint AI i.e X-arml, Knee bracing set, erection of D-pole,errection of plate form, ercetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Erection of T/F, and earthing conn. to T/F G.O Switch lightning etc. erection of Stay Set, Erection of Jumper, Pipe earthing 3 Nos., Erection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect. (100 KVA Transformer)
Erection Part of 11/0.4 KV, 100 KVA Transformer (T.S no 177/2025-26)
Chain link fencing and angle iron gate complete in all respect. (250 KVA Transformer)
Plinth and Foundation Work complete in all respect.(250 KVA Transformer)
Transportation and Loading of DTR on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
Erection Part of 11 KV HT Line T. Sno.194/2025-26
Erection of S.T Single Pole 9 Mtr. Long :- Digging of Pit,fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of S.T Double Pole 9 Mtr. Long - Digging of Pit fixing of insulator, disc and drilling of holes in X-Arm , Bracing Set, Top Clamp, erection of pole, fixing of barbed wire and danger plate, filling of Pit, Alluminium Paint and ramming & painting of poles complete in all respect.
Erection of Earthing Set.:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect.
Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect.
Stringing and sagging conductor:- Laying of conductor (AAAC 7/3.81 mm 80 mm²) stringing and sagging, binding with insulator complete in all respect.
Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.
Transportation and Loading of materials HT lines materials on truck at Divisional Store and same material unloading at road to site of work with manual carriage.
Erection Part of 3-Ph LT Line (T.S NO :-196/2025-26)
Erection of LT line.Digging of pit of stay, Erection of PCC Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T Line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Erection Part of 3Ph LT Line and Aug 1ph to 3ph LT line (T.S NO :-179/2025-26)
Erection of LT line.Digging of pit of stay, Erection of PCC Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T and Aug.1Ph to 3Ph LT Line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Erection Part of 3Ph LT Line and Aug 1ph to 3ph LT line (T.S NO :-180/2025-26)
Erection of LT line.Digging of pit of stay, Erection of PCC Pole 9 mtr Long, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect.
Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and ramming etc.complete in all respect.
Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with AAAC 7/3.15 (55mm2) Conductor of New 3-Ph. L.T and Aug.1Ph to 3Ph LT Line complete in all respect.
G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect.
Loading of materials LT lines complete materials on truck at Divisional Store and same material unloading at road to site of work.
Supply Part of 11/0.4 KV, 100 KVA Transformer 195/2024-25
Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA (1 No.Supply by HPSEBL)
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) (2 No.Supply by HPSEBL)
Prov. RCC Muffs
Prov. concrete filling in RCC muff
Prov. X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incomer line
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 1 Nos for LA.
Prov. X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Belting & Knee Bracing
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 2800 mm x 2 Nos for Transformer Bed]
Prov. X-Arm [Channel Iron (100x50x6 mm), Length : 460 mm x 2 Nos for supporting main channel of Transformer]
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (35X35x5 mm), Length : 460 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length: 950 mm x(2 Nos for Bed Knee Bracing)
Transformer L.T Distribution Box and GO Switch fixing Assembly
Prov. MS Angle Iron (50X50x6 mm), Length : 2800 mm x 2 Nos
Prov. MS Angle Iron (50X50x6 mm), Length : 450 mm x 1 No.
Prov. GO Switch Handle supporting : [Channel Iron (75x40x6mm), Length: 460 mm
Prov. GO AB Switch Unit (11kV, 400A, 100 KA) Tripple Pole O/d Type
Prov. D.O Fuse Unit
Prov. Surge Arrester, 9 kV Station Class (Porcelain Type)
Prov. Discs insulator (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) CD- 400mm
Prov. Stay set complete
Prov. Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set) (28 KG Supply by HPSEBL)
Prov. Pipe Earthing Set (3 Set Supply by HPSEBL)
Prov. 6 SWG GI wire For Earthing
Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 100 KVA DTR
Prov. Half Clamp (M.S. Flat 50X6 mm)
Prov. Full Clamp (M.S. Flat 50X6 mm)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Aluminium Thimble
Prov. Copper Thimble 200 Amp
Prov. Danger Plate
Prov. Barbed Wire
Prov. LT Cable 3.5 X 120 mm² 1.1 kV XLPE Cable Unarmoured (30 Mtr. Supply by HPSEBL)
Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri- Vector meter with Box (CT-100/5A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 100 KVA Transformer (1 No. Supply by HPSEBL)
Prov. Aluminium Paint.
Prov. Red Oxide
Chain Link fencing , Angle Iron ,Gate etc for transformer fencing complete in all respect.
Supply Part of 11 KV HT Line T.S No194/2025-26
Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) with Steel cap & Base Plate)Provided by HPSEBL 10Nos)
Prov. RCC Muffs
Prov. concrete filling in RCC muff
Prov. (AAAC 7/3.81 mm 80 mm²) mm Conductor(Prov.by HPSEBL 1.650 Kms.)
Prov.G.I.Wire No. 8 SWG in mtr. (Prov.by HPSEBL 108.12 Kg)
Run Through Str. ( ∆) Formation on Singlr Pole Str.
Prov. Cross Arm (Channel Iron (100x50x6) Length 1500 mm for single pole (Prov.by HPSEBL 6 No.)
Prov. Angle Iron (50x50x6mm) Leggth 750 mmx 2*2 nos structure
Prov. Pole Top Bracket (MSCI) (100X50X6 mm) Length 100 mm
Prov.11kv Pin Insulator with pin complete in all respect
Dead End Str.
Prov Belt Set Angle Iron (50x50x6) Length 1800mm x2 Nos.
Prov.X-Bracing Set.MS Angle Iron (50x50x6 mm) Length 2125 mm x2 Nos.
Prov.X-Arm (Horizontal) MS-Channel Iron (100x50x6mm) Length 2340 mm x2 Nos. ( ∆) Formation
Prov.Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Disc Polymeric,TC, 90 KN CD- 320mm) including Dead End Clamps etc.) x (3 No. conductors) x (2 No. sides)complete for double pole str in all respect.
Prov.11kv Pin Insulator with pin complete in all respect
HT Stay /Guy Arrangement
Prov.11kv Stay set complete in all respect
Prov. Stay Wire HT (10 kg. per Stay Set) (Prov.by HPSEBL 130 Kg)
Earthing
Prov.11kv Earthing set complete in all respect.
Prov.G.I.Wire No. 8 SWG in mtr. (Prov.by HPSEBL 108.12 Kg)
Prov.Eye/Earth Hook
Prov.MS Half Clamp
Prov.MS Full Clamp/stay
Prov.11kv Danger Plate (250x200x1.6 mm)
Prov.Nuts and Bolts of Various Sizes
Prov.Barbed Wire
Prov. Red Oxide
Prov. Aluminium Paint.
Supply Part of 3-Phase LT Line(T.s NO :-196/2025-26)
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Prov.by HPSEBL 2.242kMS)
Prov. PCC Pole 9 mtr.long . (Prov.by HPSEBL 10 No.)
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m (Prov.by HPSEBL 57 Kg.)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer (Prov.by HPSEBL 20 No.)
Supply Part of 3-Phase LT Line(T.s NO :-179/2025-26)
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Prov.by HPSEBL 2.242kMS)
Prov. PCC Pole 9 mtr.long .(Prov.by HPSEBL 10Nos )
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m (Prov.by HPSEBL 92 Kg)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer (Prov.by HPSEBL 6 No.)
Supply Part of 3-Phase LT Line(T.s NO :-180/2025-26)
Prov. AAAC 7/3.15 (55mm²) {Includes 1 conductor lengths for 3Φ {Neutral conductor including 1% (Sag, Jumpering and wastage}(Prov.by HPSEBL 0.910kMS)
Prov. PCC Pole 9 mtr.long .(Prov.by HPSEBL 10Nos )
Prov. Channel iron (75x40x5) Length 1.5 mtr. + 0.2 mtr.
Prov. Shackle Insulator (16 Kn) M.s D-Iron with nuts and bolts.
Prov. Earth Hook
Prov. LT Stay Set Stay Wire(i/c Stay Clamp)/stay wire (7/3.15 mm) (6.0 kg Per Stay Set)complete in all respect.
Prov.Half Clamp
Prov. Full Clamps [ 1 No for Stay Set]
Prov. Earthing Set complete
Prov. Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m (Prov.by HPSEBL 20 Kg)
Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Prov. Spiral PVC Spacer (Prov.by HPSEBL 6 No.)
Erection Part of 11/0.4 KV, 100 KVA Transformer (T.S no 177/2025-26)
Prov. LT Distribution Panel Box with MS Sheet of 1.6 mm ( 900x800x200 mm ) cubide Box complete with stand etc and Al Busbar (25x6mm)inside .painted /powder coated after primar coating MCCB 160 amp 3P 35kA , ICS =100 % ICU, Kit-Kit 200 Amp for 250 KVA DTR
Prov. LT Cable 3.5 X 240 mm² 1.1 kV XLPE Cable Unarmoured (Prov.by HPSEBL 30 Mtr. )
Prov. Energy Meter 3-ɸ, 4 wire CT operated Static Tri- Vector meter with Box (CT-400/5A) Accuracy Class: 0.5S, Category-C, DLMS Compliant for 250 KVA Transformer (Prov.by HPSEBL 1 No. )
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.48 MB
termandcondition.pdf
Tender Documents • 0.90 MB
addtionaltermandcondition.pdf
Additional Documents • 0.58 MB
BOQ_185413.xls
BOQ • 3.29 MB
Download all tender documents and submit your bid